메뉴 건너뛰기




Volumn 71, Issue 3, 1998, Pages 141-153

Inventory Control: A Simulation and Decision Support System

Author keywords

construction company; Inventory control; logistic supply; simulation model; two level system

Indexed keywords


EID: 0542450077     PISSN: 00375497     EISSN: None     Source Type: Journal    
DOI: 10.1177/003754979807100301     Document Type: Article
Times cited : (1)

References (17)
  • 3
    • 0027816667 scopus 로고
    • System Dynamics—Background, Methodology and Applications. Part 2: Applications
    • December
    • Towill, D.R. “System Dynamics—Background, Methodology and Applications. Part 2: Applications.” Computing & Control Engineering Journal, pp 261-266, December 1993.
    • (1993) Computing & Control Engineering Journal , pp. 261-266
    • Towill, D.R.1
  • 5
    • 0542389909 scopus 로고
    • Model Input Management: A Case Study
    • March
    • Standridge, C.R., Laval, D.K. and Reust, J. “Model Input Management: A Case Study.” SIMULATION, Vol. 58, No. 3, pp 199-208, March 1992.
    • (1992) SIMULATION , vol.58 , Issue.3 , pp. 199-208
    • Standridge, C.R.1    Laval, D.K.2    Reust, J.3
  • 6
    • 84974857096 scopus 로고
    • EOQ Systems: The Case of an Increase in Purchase Cost
    • No.
    • Spiegler A., Yanasse, H.H. “EOQ Systems: The Case of an Increase in Purchase Cost.” The Journal of Operations Research, Vol. 41, No.7, pp 633- 637, 1990.
    • (1990) The Journal of Operations Research , vol.41 , Issue.7 , pp. 633-637
    • Spiegler A1    Yanasse, H.H.2
  • 8
    • 0023817927 scopus 로고
    • Estimating the Performance of Multi-level Inventory Systems
    • Vol. No. January-February
    • Svoronos, A. and Zipkin, P. “Estimating the Performance of Multi-level Inventory Systems.” Operations Research, Vol.36, No.3, pp 57-72, January-February 1988.
    • (1988) Operations Research , vol.36 , Issue.3 , pp. 57-72
    • Svoronos, A.1    Zipkin, P.2
  • 9
    • 0023436887 scopus 로고
    • A Multi-echelon Inventory Model for Repairable Items with Emergency Lateral-Transhipments
    • No. October
    • Lee, H.L. “A Multi-echelon Inventory Model for Repairable Items with Emergency Lateral-Transhipments.” Management Science, Vol. 33, No.10, pp 1302-1306, October 1987.
    • (1987) Management Science , vol.33 , Issue.10 , pp. 1302-1306
    • Lee, H.L.1
  • 11
    • 84993710733 scopus 로고
    • Investigation and Optimization of Stock Central Systems
    • Sobotka, A. “Investigation and Optimization of Stock Central Systems.” Archives of Civil Engineering, Vol. XXXVIII, No. 4, pp 195-351, 1992.
    • (1992) Archives of Civil Engineering , vol.XXXVIII , Issue.4 , pp. 195-351
    • Sobotka, A.1
  • 14
    • 84993736404 scopus 로고
    • Selection of Model Parameters in the Control System for Construction Processes
    • Conference Scientific (in Polish),Krynica
    • Sobotka, A., and Milosz, M. “Selection of Model Parameters in the Control System for Construction Processes.” Conference Scientific, (in Polish), Krynica, 1992.
    • (1992)
    • Sobotka, A.1    Milosz, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.