메뉴 건너뛰기




Volumn 23, Issue 15, 1999, Pages 35-36

An algorithm for tie lines planning of power distribution systems

Author keywords

Genetic algorithm; Heuristic method; Power distribution planning; Reliability; Tie lines

Indexed keywords


EID: 0347775845     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (10)

References (5)
  • 2
    • 0029354757 scopus 로고
    • Cost-Benefit Analysis of Power System Reliability: Two Utility Case Studies
    • David L, Willian M, Billinton R, et al. Cost-Benefit Analysis of Power System Reliability: Two Utility Case Studies. IEEE Trans on PWRS, 1995, 10(3)
    • (1995) IEEE Trans on PWRS , vol.10 , Issue.3
    • David, L.1    Willian, M.2    Billinton, R.3
  • 3
    • 0347326877 scopus 로고    scopus 로고
    • Chinese source
  • 4
    • 0024719222 scopus 로고
    • A Reliability Test System for Education Purpose-Basic Data
    • Billinton R. A Reliability Test System for Education Purpose-Basic Data. IEEE Trans on PWRS, 1989, 4(3)
    • (1989) IEEE Trans on PWRS , vol.4 , Issue.3
    • Billinton, R.1
  • 5
    • 0347326876 scopus 로고    scopus 로고
    • Chinese source


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.