-
1
-
-
0026126118
-
A computational study of the job-shop scheduling problem
-
Applegate, D., and Cook, W. 1991. A computational study of the job-shop scheduling problem. ORSA Journal on Computing 3(2):149-156..
-
(1991)
ORSA Journal on Computing
, vol.3
, Issue.2
, pp. 149-156
-
-
Applegate, D.1
Cook, W.2
-
3
-
-
0024647646
-
Program derivation by fixed point computation
-
Cai, J., and Paige, R. 1989. Program derivation by fixed point computation. Science of Computer Programming 11:197-261.
-
(1989)
Science of Computer Programming
, vol.11
, pp. 197-261
-
-
Cai, J.1
Paige, R.2
-
4
-
-
84982522109
-
ISIS - a knowledge-based system for factory scheduling
-
Fox, M. S., and Smith, S. F. 1984. ISIS - a knowledge-based system for factory scheduling. Expert Systems 1(1):25-49.
-
(1984)
Expert Systems
, vol.1
, Issue.1
, pp. 25-49
-
-
Fox, M. S.1
Smith, S. F.2
-
8
-
-
0002869126
-
Solving large-scale constraint satisfaction and scheduling problems using a heuristic repair method
-
Minton, S.; Johnson, M.; Philips, A. B.; and Laird, P. 1990. Solving large-scale constraint satisfaction and scheduling problems using a heuristic repair method. In Proceedings of the Eighth National Conference on Artificial Intelligence, 290-295.
-
(1990)
Proceedings of the Eighth National Conference on Artificial Intelligence
, pp. 290-295
-
-
Minton, S.1
Johnson, M.2
Philips, A. B.3
Laird, P.4
-
15
-
-
0008945676
-
KIDS: A knowledge-based software development system
-
Lowry, M., and McCartney, R., eds., Menlo Park: MIT Press
-
Smith, D. R. 1991. KIDS: A knowledge-based software development system. In Lowry, M., and McCartney, R., eds., Automating Software Design. Menlo Park: MIT Press. 483-514.
-
(1991)
Automating Software Design
, pp. 483-514
-
-
Smith, D. R.1
-
17
-
-
0346340388
-
Synthesis of constraint algorithms
-
Saraswat, and Hentenryck, P. eds., Cambridge, MA: The MIT Press
-
Smith, D. R., and Westfold, S. J. 1995. Synthesis of constraint algorithms. In Saraswat, V., and Hentenryck, P. V., eds., Principles and Practice of Constraint Programming. Cambridge, MA: The MIT Press.
-
(1995)
Principles and Practice of Constraint Programming
-
-
Smith, D. R.1
Westfold, S. J.2
-
19
-
-
0009743850
-
Constructing and maintaining detailed production plans: Investigations into the development of knowledge-based factory scheduling systems
-
Smith, S. F.; Fox, M. S.; and Ow, P. S. 1986. Constructing and maintaining detailed production plans: Investigations into the development of knowledge-based factory scheduling systems. AI Magazine 7(4):45-61.
-
(1986)
AI Magazine
, vol.7
, Issue.4
, pp. 45-61
-
-
Smith, S. F.1
Fox, M. S.2
Ow, P. S.3
-
20
-
-
0342795149
-
-
Technical Report CMU-RI-TR-89-30, The Robotics Institute, Carenegie-Mellon University
-
Smith, S. F. 1989. The OPIS framework for modeling manufacturing systems. Technical Report CMU-RI-TR-89-30, The Robotics Institute, Carenegie-Mellon University.
-
(1989)
The OPIS framework for modeling manufacturing systems
-
-
Smith, S. F.1
-
21
-
-
85166379466
-
-
Technical Report KES.U.94.5, Kestrel Institute. To appear in Proceedings of the Conference on Mathematics of Program Construction, Kloster Irsee, Germany, July 1995
-
Srinivas, Y. V., and Jüllig, R. 1994. Specware:tm formal support for composing software. Technical Report KES.U.94.5, Kestrel Institute. To appear in Proceedings of the Conference on Mathematics of Program Construction, Kloster Irsee, Germany, July 1995.
-
(1994)
Specware:tm formal support for composing software
-
-
Srinivas, Y. V.1
Jüllig, R.2
-
22
-
-
5244240923
-
Anytime rescheduling
-
San Diego, CA: DARPA
-
Zweben, M.; Deale, M.; and Gargan, R. 1990. Anytime rescheduling. In Proceedings of the Workshop on Innovative Approaches to Planning, Scheduling and Control, 215-219. San Diego, CA: DARPA.
-
(1990)
Proceedings of the Workshop on Innovative Approaches to Planning, Scheduling and Control
, pp. 215-219
-
-
Zweben, M.1
Deale, M.2
Gargan, R.3
|