메뉴 건너뛰기




Volumn 14, Issue 6, 2003, Pages 562-570

A pragmatic approach for optimal selection of plant-specific process plans in a virtual enterprise

Author keywords

Optimization; Partner selection; Process planning; Virtual organization

Indexed keywords

COST EFFECTIVENESS; DECISION MAKING; GENETIC ALGORITHMS; HEURISTIC METHODS; MATHEMATICAL MODELS; PRODUCTION ENGINEERING; SCHEDULING; VIRTUAL CORPORATION;

EID: 0345872306     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/09537280310001613759     Document Type: Article
Times cited : (22)

References (19)
  • 5
    • 0346292885 scopus 로고    scopus 로고
    • Research on business management in virtual organization for agile manufacturing
    • Feng, D. Z., and Yamashiro, M., 2002, Research on business management in virtual organization for agile manufacturing. Research Reports in Ashikaga Institute of Technology, 34, 151-157.
    • (2002) Research Reports in Ashikaga Institute of Technology , vol.34 , pp. 151-157
    • Feng, D.Z.1    Yamashiro, M.2
  • 6
    • 0032178370 scopus 로고    scopus 로고
    • A modular architecture for rapid development of CAPP systems for agile manufacturing
    • Feng, S. C., and Zhang, C. C., 1998, A modular architecture for rapid development of CAPP systems for agile manufacturing. IIE Transactions, 30, 893-903.
    • (1998) IIE Transactions , vol.30 , pp. 893-903
    • Feng, S.C.1    Zhang, C.C.2
  • 7
    • 0037091912 scopus 로고    scopus 로고
    • Agile manufacturing: A taxonomy of strategic and technological imperatives
    • Gunasekaran, A., and Yusuf, Y. Y., 2002, Agile manufacturing: a taxonomy of strategic and technological imperatives. International Journal of Production Research, 40(6), 1357-1385.
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1357-1385
    • Gunasekaran, A.1    Yusuf, Y.Y.2
  • 9
    • 0027622077 scopus 로고
    • Feedback approach to design for assembly by evaluation of assembly plan
    • Hsu, W., George Lee, C. S., and Su, S. F., 1993, Feedback approach to design for assembly by evaluation of assembly plan, Computer Aided Design, 25(7), 395-410.
    • (1993) Computer Aided Design , vol.25 , Issue.7 , pp. 395-410
    • Hsu, W.1    George Lee, C.S.2    Su, S.F.3
  • 10
    • 0346292884 scopus 로고    scopus 로고
    • Integration of product manufacturing requirements and enterprise manufacturing capabilities in a virtual enterprise
    • (in Chinese)
    • Hu, G. R., and Feng, D. Z., 2002, Integration of product manufacturing requirements and enterprise manufacturing capabilities in a virtual enterprise, Mechanical Engineering and Automation, 18(3), 18-26 (in Chinese).
    • (2002) Mechanical Engineering and Automation , vol.18 , Issue.3 , pp. 18-26
    • Hu, G.R.1    Feng, D.Z.2
  • 11
    • 0037290394 scopus 로고    scopus 로고
    • Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise
    • Ip, W. H., Huang, M., Yung, K. L., and Wang, D., 2003, Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise. Computers & Operations Research, 30(2), 213-231.
    • (2003) Computers & Operations Research , vol.30 , Issue.2 , pp. 213-231
    • Ip, W.H.1    Huang, M.2    Yung, K.L.3    Wang, D.4
  • 12
    • 0008041553 scopus 로고
    • Modeling of concurrent engineering design
    • In Andrew Kusiak (ed.); (New York: Wiley)
    • Ishii, K., 1993, Modeling of concurrent engineering design. In Andrew Kusiak (ed.) Automation, Tools, and Techniques (New York: Wiley), pp. 19-39.
    • (1993) Automation, Tools, and Techniques , pp. 19-39
    • Ishii, K.1
  • 14
    • 0035923926 scopus 로고    scopus 로고
    • External partner selection using tabu search heuristics in distributed manufacturing
    • Ko, C. S., Kim, T., and Hwang, H., 2001, External partner selection using tabu search heuristics in distributed manufacturing. International Journal of Production Research, 39(17), 3959-3974.
    • (2001) International Journal of Production Research , vol.39 , Issue.17 , pp. 3959-3974
    • Ko, C.S.1    Kim, T.2    Hwang, H.3
  • 15
    • 0242666708 scopus 로고    scopus 로고
    • Partner selection and information infrastructure of a virtual enterprise network
    • Lau, C. W., and Wong, T. T., 2001, Partner selection and information infrastructure of a virtual enterprise network. International Journal of Computer Integrated Manufacturing, 14(2), 186-193.
    • (2001) International Journal of Computer Integrated Manufacturing , vol.14 , Issue.2 , pp. 186-193
    • Lau, C.W.1    Wong, T.T.2
  • 16
    • 0000558344 scopus 로고    scopus 로고
    • A generative approach for concurrent manufacturability evaluation and subcontractor selection
    • Minis, I., Herrmann, J. W., Lam, G., and Lin, E., 1999, A generative approach for concurrent manufacturability evaluation and subcontractor selection. Journal of Manufacturing Systems, 18(6), 383-395.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.6 , pp. 383-395
    • Minis, I.1    Herrmann, J.W.2    Lam, G.3    Lin, E.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.