-
1
-
-
0345300519
-
-
Jan.
-
Meteorol. Mag., vol. 116, no. 1374, pp. 1-17, Jan. 1967.
-
(1967)
Meteorol. Mag.
, vol.116
, Issue.1374
, pp. 1-17
-
-
-
2
-
-
0023399522
-
The time series approach to short-term load forecasting
-
Aug.
-
M. Hagan and S. Behr, "The time series approach to short-term load forecasting," IEEE Trans. Power Syst., vol. 2, pp. 785-791, Aug. 1987.
-
(1987)
IEEE Trans. Power Syst.
, vol.2
, pp. 785-791
-
-
Hagan, M.1
Behr, S.2
-
3
-
-
0023563676
-
Short-term load forecasting
-
Dec.
-
G. Gross and F. Galiana, "Short-term load forecasting," Proc. IEEE, vol. 75, no. 12, pp. 1558-1572, Dec. 1987.
-
(1987)
Proc. IEEE
, vol.75
, Issue.12
, pp. 1558-1572
-
-
Gross, G.1
Galiana, F.2
-
4
-
-
0024764917
-
Analysis and evaluation of five short-term load forecasting techniques
-
Nov.
-
I. Moghram and S, Rahman, "Analysis and evaluation of five short-term load forecasting techniques," IEEE Trans. Power Syst., vol. 4, pp. 1484-1491, Nov. 1989.
-
(1989)
IEEE Trans. Power Syst.
, vol.4
, pp. 1484-1491
-
-
Moghram, I.1
Rahman, S.2
-
5
-
-
0344006135
-
Short range power system load forecasting using the iteratively re-weighted least squares technique
-
Austria, Aug.
-
M. E. El-Hawary and G. A. N. Mbamalu, "Short range power system load forecasting using the iteratively re-weighted least squares technique," in Proc. Tenth Power Syst. Comput. Conf., Austria, Aug. 1990, pp. 277-283.
-
(1990)
Proc. Tenth Power Syst. Comput. Conf.
, pp. 277-283
-
-
El-Hawary, M.E.1
Mbamalu, G.A.N.2
-
6
-
-
0344869162
-
Short-term load forecasting by Kalman filtering
-
Austria, Aug.
-
H. Muller and G. Petritsch, "Short-term load forecasting by Kalman filtering," in Proc. Tenth Power Syst. Comput. Conf., Austria, Aug. 1990, pp. 284-291.
-
(1990)
Proc. Tenth Power Syst. Comput. Conf.
, pp. 284-291
-
-
Muller, H.1
Petritsch, G.2
-
7
-
-
0344437382
-
Application of the some autoregressive models in short-term load forecasting in power system
-
Austria, Aug.
-
J. Malko, L. Otreba, and W. Skorupski, "Application of the some autoregressive models in short-term load forecasting in power system," in Proc. Tenth Power Syst. Comput. Conf., Austria, Aug. 1990, pp. 292-295.
-
(1990)
Proc. Tenth Power Syst. Comput. Conf.
, pp. 292-295
-
-
Malko, J.1
Otreba, L.2
Skorupski, W.3
-
8
-
-
0344437381
-
Short-term load forecast Using multiple regression analysis or adaptive regression analysis
-
Graze, Austria, Aug.
-
H. Strasser, N. Friemelt, and G. Schellstede, "Short-term load forecast Using multiple regression analysis or adaptive regression analysis," in Proc. Tenth Power Syst. Comput. Conf., Graze, Austria, Aug. 1990, pp. 296-301.
-
(1990)
Proc. Tenth Power Syst. Comput. Conf.
, pp. 296-301
-
-
Strasser, H.1
Friemelt, N.2
Schellstede, G.3
-
9
-
-
0026208315
-
Medium range forecasting of hourly power system load by time series analysis using the Walsh transform
-
Aug.
-
T. K. Basu, T. K. Bhattacharya, and P. Purkayastha, "Medium range forecasting of hourly power system load by time series analysis using the Walsh transform," Electrical Power & Energy Systems, vol. 13, no. 4, pp. 193-200, Aug. 1991.
-
(1991)
Electrical Power & Energy Systems
, vol.13
, Issue.4
, pp. 193-200
-
-
Basu, T.K.1
Bhattacharya, T.K.2
Purkayastha, P.3
-
10
-
-
0026257503
-
Enhancement, implementation and performance of an adaptive short-term load forecasting algorithm
-
Nov.
-
W. Grady, L. Groce, T. Huebner, Q. Lu, and M. Crawford, "Enhancement, implementation and performance of an adaptive short-term load forecasting algorithm," IEEE Trans. Power Syst., vol. 6, pp. 1404-1410, Nov. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, pp. 1404-1410
-
-
Grady, W.1
Groce, L.2
Huebner, T.3
Lu, Q.4
Crawford, M.5
-
11
-
-
0026257538
-
A priority vector based technique for load forecasting
-
Nov.
-
S. Rahman and G. Shrestha, "A priority vector based technique for load forecasting," IEEE Trans. Power Syst., vol. 6, pp. 1459-1465, Nov. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, pp. 1459-1465
-
-
Rahman, S.1
Shrestha, G.2
-
12
-
-
84864103897
-
Weather Sensitive Short Term Load Forecasting Using Non-Fully Connected Artificial Neural Network
-
San Diego, CA, 91 SM 449-9 PWRS
-
S. Chen, D. C. Yu, and A. R. Moghaddamjo, "Weather Sensitive Short Term Load Forecasting Using Non-Fully Connected Artificial Neural Network, " IEEE Power Eng. Soc., San Diego, CA, 91 SM 449-9 PWRS, 1991.
-
(1991)
IEEE Power Eng. Soc.
-
-
Chen, S.1
Yu, D.C.2
Moghaddamjo, A.R.3
-
13
-
-
0026822198
-
Advancement in the application of neural network for short term load forecasting
-
Feb.
-
T. M. Peng, N. F. Hubele, and G. G. Karady, "Advancement in the application of neural network for short term load forecasting," IEEE Trans. Power Syst., vol. 7, pp. 250-257, Feb. 1992.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, pp. 250-257
-
-
Peng, T.M.1
Hubele, N.F.2
Karady, G.G.3
-
15
-
-
0027543854
-
Neural network based short term load forecasting
-
Feb.
-
C. N. Lu, H. T. Wu, and S. Vemuri, "Neural network based short term load forecasting," IEEE Trans. Power Syst., vol. 8, pp. 336-342, Feb. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 336-342
-
-
Lu, C.N.1
Wu, H.T.2
Vemuri, S.3
-
16
-
-
0027544506
-
Load forecasting via suboptimal seasonal autoregressive models and iteratively re-weighted least squares estimation
-
Feb.
-
G. A. N. Mbamalu and M. E. El-Hawary, "Load forecasting via suboptimal seasonal autoregressive models and iteratively re-weighted least squares estimation," IEEE Trans. Power Syst., vol. 8, pp. 343-348, Feb. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, pp. 343-348
-
-
Mbamalu, G.A.N.1
El-Hawary, M.E.2
-
17
-
-
33746194148
-
Application of neural network technology to short-term system load forecasting
-
Greece, Sept., APT '93
-
A. D. Papalexopoulos, S. Hao, and T. Peng, "Application of neural network technology to short-term system load forecasting," in Proc. "Athens Power Tech", Greece, Sept. 1993, APT '93, pp. 796-800.
-
(1993)
Proc. "Athens Power Tech"
, pp. 796-800
-
-
Papalexopoulos, A.D.1
Hao, S.2
Peng, T.3
-
18
-
-
0029250532
-
Practical experiences with an adaptive neural network short term load forecasting system
-
Feb.
-
O. Mohammed, D. Park, R. Merchant, T. Dinh, C. Tong, A. Azeem, J. Farah, and C. Drake, "Practical experiences with an adaptive neural network short term load forecasting system," IEEE Trans. Power Syst., vol. 10, pp. 254-265, Feb. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 254-265
-
-
Mohammed, O.1
Park, D.2
Merchant, R.3
Dinh, T.4
Tong, C.5
Azeem, A.6
Farah, J.7
Drake, C.8
-
19
-
-
0029354867
-
Short term load forecasting using fuzzy neural networks
-
Aug.
-
A. G. Bakirtzis, J. B. Theocharis, S. J. Kiartzis, and K. J. Satsios, "Short term load forecasting using fuzzy neural networks," IEEE Trans. Power Syst., vol. 10, pp. 1518-1524, Aug. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 1518-1524
-
-
Bakirtzis, A.G.1
Theocharis, J.B.2
Kiartzis, S.J.3
Satsios, K.J.4
-
20
-
-
0029352651
-
An adaptive modular artificial neural network hourly load forecaster and its implementation at electric utilities
-
Aug.
-
A. Khotanzad, R. C. Hwang, A. Abaye, and D. Maratukulam, "An adaptive modular artificial neural network hourly load forecaster and its implementation at electric utilities," IEEE Trans. Power Syst., vol. 10, pp. 1716-1722, Aug. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 1716-1722
-
-
Khotanzad, A.1
Hwang, R.C.2
Abaye, A.3
Maratukulam, D.4
-
21
-
-
0029516743
-
A neural-net based short term load forecasting using moving window procedure
-
M Djukanović, S. Ružić, B. Babić, D. Šobajić, and Y. H. Pao, "A neural-net based short term load forecasting using moving window procedure," Electrical Power & Energy Systems, vol. 17, no. 6, pp. 391-397, 1995.
-
(1995)
Electrical Power & Energy Systems
, vol.17
, Issue.6
, pp. 391-397
-
-
Djukanović, M.1
Ružić, S.2
Babić, B.3
Šobajić, D.4
Pao, Y.H.5
-
22
-
-
0030084673
-
Optimal fuzzy inference for short term load forecasting
-
Feb.
-
H. Mori and H. Kobayashi, "Optimal fuzzy inference for short term load forecasting," IEEE Trans. Power Syst., vol. 11, pp. 390-396, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, pp. 390-396
-
-
Mori, H.1
Kobayashi, H.2
-
23
-
-
0030087190
-
Heterogeneous artificial neural network for short term electrical load forecasting
-
Feb.
-
A. Piras, B. Buchenel, Y. Jaccard, A. Germond, and K. Imhof, "Heterogeneous artificial neural network for short term electrical load forecasting," IEEE Trans. Power Syst., vol. 11, pp. 397-402, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, pp. 397-402
-
-
Piras, A.1
Buchenel, B.2
Jaccard, Y.3
Germond, A.4
Imhof, K.5
-
24
-
-
0031274057
-
Cascaded artificial neural networks for short term load forecasting
-
Nov.
-
A. S. Al-Fuhaid, M. EI-Sayed, and M. Mahmoud, "Cascaded artificial neural networks for short term load forecasting," IEEE Trans. Power Syst., vol. 12, pp. 1524-1529, Nov. 1997.
-
(1997)
IEEE Trans. Power Syst.
, vol.12
, pp. 1524-1529
-
-
Al-Fuhaid, A.S.1
Ei-Sayed, M.2
Mahmoud, M.3
-
25
-
-
0031996844
-
Recurrent neural networks for short term load forecasting
-
Feb.
-
J. Vermaak and E. C. Botha, "Recurrent neural networks for short term load forecasting," IEEE Trans. Power Syst., vol. 13, pp. 126-132, Feb. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 126-132
-
-
Vermaak, J.1
Botha, E.C.2
-
26
-
-
0031996523
-
A new short term load forecasting approach using self organizing fuzzy armax models
-
Feb.
-
H. T. Yang and C. M. Huang, "A new short term load forecasting approach using self organizing fuzzy armax models," IEEE Trans. Power Syst., vol. 13, pp. 217-225, Feb. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 217-225
-
-
Yang, H.T.1
Huang, C.M.2
-
27
-
-
0032074824
-
A novel approach to short term load forecasting using fuzzy neural networks
-
May
-
S. E. Papadakis, J. B. Theocharis, S. J. Kiartzis, and A. G. Bakirtzis, "A novel approach to short term load forecasting using fuzzy neural networks," IEEE Trans. Power Syst., vol. 13, pp. 480-492, May 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 480-492
-
-
Papadakis, S.E.1
Theocharis, J.B.2
Kiartzis, S.J.3
Bakirtzis, A.G.4
-
28
-
-
26544436003
-
Practical experience in short term load forecasting in electric power utility of Serbia, CIGRE
-
Black Sea El-Net, June, 2.3.
-
S. Ružić, A. Vučković, N. Nikolić, and N. Blagojević, "Practical experience in short term load forecasting in electric power utility of Serbia, CIGRE," in Proc., vol. II, Black Sea El-Net, June 2001, 2.3.
-
(2001)
Proc.
, vol.2
-
-
Ružić, S.1
Vučković, A.2
Nikolić, N.3
Blagojević, N.4
|