Resque, Ph.D. thesis, University of Michigan
-
Chang, D. (1987) Resque, Ph.D. thesis, University of Michigan.
-
(1987)
-
-
Chang, D.1
-
5
-
-
0009771672
-
Monte Carlo simulation of construction costs using subjective data
-
Chau, K.W. (1995) Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics, 13(5), 369-83.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.5
, pp. 369-383
-
-
Chau, K.W.1
-
6
-
-
0026381933
-
Construction scheduling: Principles, practices, and six case studies
-
Cole, L.J.R. (1991) Construction scheduling: principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4). 579-88,
-
(1991)
Journal of Construction Engineering and Management
, vol.117
, Issue.4
, pp. 579-588
-
-
Cole, L.J.R.1
-
7
-
-
0004809828
-
An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry
-
Dawood, N.N. (1995) An integrated knowledge-based/simulation approach to production planning: an application to the pre-cast industry. Construction Management and Economics, 13(1), 53-64.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.1
, pp. 53-64
-
-
Dawood, N.N.1
-
8
-
-
0016342705
-
Stochastic scheduling of linear construction sites
-
Dressler, J. (1974) Stochastic scheduling of linear construction sites. Journal of the Construction Division ASCE, 100(4). 175-95.
-
(1974)
Journal of the Construction Division ASCE
, vol.100
, Issue.4
, pp. 175-195
-
-
Dressler, J.1
-
9
-
-
0027666467
-
Comparison of two simulation methodologies in construction
-
Gonzalez-Quevedo, A.A., AbouRizk, S.M., Isely, D.T. and Halpin, D.W. (1993) Comparison of two simulation methodologies in construction. Journal of Construction Engineering and Management, 119(3), 573-89.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.3
, pp. 573-589
-
-
Gonzalez-Quevedo, A.A.1
AbouRizk, S.M.2
Isely, D.T.3
Halpin, D.W.4
-
10
-
-
0017539255
-
Cyclone - A method for modeling job site processes
-
Halpin, D.W. (1977) Cyclone - A method for modeling job site processes. Journal of the Construction Division ASCE, 103(3), 489-99.
-
(1977)
Journal of the Construction Division ASCE
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
13
-
-
0028750455
-
Simulation of cable-stayed bridges using Disco
-
Huang, R., Grigoriadis, A.M. and Halpin, D.W. (1994) Simulation of cable-stayed bridges using Disco, in Proceedings of 1994 Winter Simulation Conference, pp. 1130-36.
-
(1994)
Proceedings of 1994 Winter Simulation Conference
, pp. 1130-1136
-
-
Huang, R.1
Grigoriadis, A.M.2
Halpin, D.W.3
-
14
-
-
0003656321
-
-
Dept. of Civil Engineering, The University of Michigan, Ann Arbor
-
Ioannou, P.G. (1989) Um-Cyclone User's Guide, Dept. of Civil Engineering, The University of Michigan, Ann Arbor.
-
(1989)
Um-Cyclone User's Guide
-
-
Ioannou, P.G.1
-
15
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D.W. (1981) Linear scheduling method for highway construction. Journal of the Construction Division ASCE, 107(2), 247-61.
-
(1981)
Journal of the Construction Division ASCE
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
18
-
-
0004436232
-
Planning repetitive construction: Current practice
-
Lutz, J.D. and Hijazi, A. (1993) Planning repetitive construction: current practice. Construction Management and Economics, 11(2), 99-110.
-
(1993)
Construction Management and Economics
, vol.11
, Issue.2
, pp. 99-110
-
-
Lutz, J.D.1
Hijazi, A.2
-
21
-
-
0023366950
-
Construction operations simulation by microcomputer
-
Paulson, B.C., Jr., Chan, W.T. and Koo, C.C. (1987) Construction operations simulation by microcomputer. Journal of Construction Engineering and Management, 113(2), 302-14.
-
(1987)
Journal of Construction Engineering and Management
, vol.113
, Issue.2
, pp. 302-314
-
-
Paulson Jr., B.C.1
Chan, W.T.2
Koo, C.C.3
-
26
-
-
0019030431
-
Construction planning for linear projects
-
Selinger, S. (1980) Construction planning for linear projects. Journal of the Construction Division ASCE, 106(2), 195-205.
-
(1980)
Journal of the Construction Division ASCE
, vol.106
, Issue.2
, pp. 195-205
-
-
Selinger, S.1
-
29
-
-
0029522572
-
Analysis of earth-moving systems using discrete-event simulation
-
Smith, S.D., Osborne, J.R. and Forde, M.C. (1995) Analysis of earth-moving systems using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), 388-96.
-
(1995)
Journal of Construction Engineering and Management
, vol.121
, Issue.4
, pp. 388-396
-
-
Smith, S.D.1
Osborne, J.R.2
Forde, M.C.3
-
31
-
-
0027610292
-
Simulation technologies for planning heavy construction processes
-
Vanegas, J.A., Bravo, E.B. and Halpin, D.W. (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), 336-54.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.2
, pp. 336-354
-
-
Vanegas, J.A.1
Bravo, E.B.2
Halpin, D.W.3
-
32
-
-
84930116614
-
Discussion of 'Formal development of line-of-balance technique by Z.M. Al Sarraj'
-
Vorster, M.C. and Bafna, T. (1992) Discussion of 'Formal development of line-of-balance technique by Z.M. Al Sarraj'. Journal of Construction Engineering and Management, 118(1), 210-1.
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.1
, pp. 210-211
-
-
Vorster, M.C.1
Bafna, T.2
|