-
1
-
-
0031419208
-
An overview of three techniques designed to aid planners with over-assignment and peak spreading in traffic modelling studies
-
Al-Azzawi, M. (1997). "An overview of three techniques designed to aid planners with over-assignment and peak spreading in traffic modelling studies." Traffic Eng. Control, 38(11), 604-606.
-
(1997)
Traffic Eng. Control
, vol.38
, Issue.11
, pp. 604-606
-
-
Al-Azzawi, M.1
-
2
-
-
0004137033
-
-
Landor, London
-
Cairns, S., Hass-Klau, C., and Goodwin, P. (1998). Traffic impact of highway capacity reductions: Assessment of the evidence, Landor, London.
-
(1998)
Traffic Impact of Highway Capacity Reductions: Assessment of the Evidence
-
-
Cairns, S.1
Hass-Klau, C.2
Goodwin, P.3
-
3
-
-
0003483658
-
-
Department of the Environment, Transport and the Regions (DETR). The Stationery Office, London
-
Department of the Environment, Transport and the Regions (DETR). (1998). A new deal for transport: Better for everyone. The Stationery Office, London.
-
(1998)
A New Deal for Transport: Better for Everyone
-
-
-
4
-
-
0345424659
-
-
Design Manual for Roads and Bridges (DMRB). Sec. 2, The Stationery Office, London
-
Design Manual for Roads and Bridges (DMRB). (1997). Highways Economics Note No. 2, Vol. 13, Sec. 2, The Stationery Office, London.
-
(1997)
Highways Economics Note No. 2
, vol.13
-
-
-
5
-
-
0029721333
-
PROMPT: Field trial and simulation results of bus priority in SCOOT
-
IEE, London
-
Hounsell, N. B., McLeod, F. N., Bretherton, R. D., and Bowen, G. T. (1996). "PROMPT: field trial and simulation results of bus priority in SCOOT." Proc., 8th Int. Road Traffic Monitoring and Control Conf., IEE, London, 90-94.
-
(1996)
Proc., 8th Int. Road Traffic Monitoring and Control Conf.
, pp. 90-94
-
-
Hounsell, N.B.1
McLeod, F.N.2
Bretherton, R.D.3
Bowen, G.T.4
-
6
-
-
0029332316
-
Bus priority at traffic signals in Portland: The Powell Boulevard pilot project
-
Transportation Research Board, Washington, D.C
-
Hunter-Zaworski, K. M., Kloos, W. C., and Danaher, A. R. (1995). "Bus priority at traffic signals in Portland: The Powell Boulevard pilot project." Transp. Res. Rec., 1503, Transportation Research Board, Washington, D.C., 29-33.
-
(1995)
Transp. Res. Rec.
, vol.1503
, pp. 29-33
-
-
Hunter-Zaworski, K.M.1
Kloos, W.C.2
Danaher, A.R.3
-
7
-
-
0035340103
-
Regional and area-type modeling of peak spreading on Connecticut freeways
-
Ivan, J. N., and Allaire, S. A. (2001). "Regional and area-type modeling of peak spreading on Connecticut freeways." J. Transp. Eng., 127(3), 223-229.
-
(2001)
J. Transp. Eng.
, vol.127
, Issue.3
, pp. 223-229
-
-
Ivan, J.N.1
Allaire, S.A.2
-
9
-
-
0345424660
-
An approach towards the integration of bus priority and traffic adaptive signal control
-
Transportation Research Board, Washington, D.C
-
Mirchandani, P., Head, L., Knyazyan, A., and Wu, W. (2001). "An approach towards the integration of bus priority and traffic adaptive signal control." Proc., 80th TRB Conf., Transportation Research Board, Washington, D.C.
-
(2001)
Proc., 80th TRB Conf.
-
-
Mirchandani, P.1
Head, L.2
Knyazyan, A.3
Wu, W.4
-
11
-
-
0033197515
-
Simulating performance impacts of bus lanes and supporting measures
-
Shalaby, A. S. (1999). "Simulating performance impacts of bus lanes and supporting measures." J. Transp. Eng., 125(5), 390-397.
-
(1999)
J. Transp. Eng.
, vol.125
, Issue.5
, pp. 390-397
-
-
Shalaby, A.S.1
-
13
-
-
0345424662
-
Modelling peak spreading in continuous time
-
PTRC, London
-
van Vuren, T., Carmichael, S., Polak, J., Hyman, G., and Cross, S. (1999). "Modelling peak spreading in continuous time." Proc., Seminar F, European Transport Conf., PTRC, London, 93-105.
-
(1999)
Proc., Seminar F, European Transport Conf.
, pp. 93-105
-
-
van Vuren, T.1
Carmichael, S.2
Polak, J.3
Hyman, G.4
Cross, S.5
-
14
-
-
0035493964
-
Quantifying the potential savings in travel time resulting from parking guidance systems - A simulation case study
-
Waterson, B. J., Hounsell, N. B., and Chatterjee, K. (2001). "Quantifying the potential savings in travel time resulting from parking guidance systems-a simulation case study." J. Oper. Res. Soc., 52(10), 1067-1077.
-
(2001)
J. Oper. Res. Soc.
, vol.52
, Issue.10
, pp. 1067-1077
-
-
Waterson, B.J.1
Hounsell, N.B.2
Chatterjee, K.3
-
15
-
-
0344562496
-
CONTRAM - A computer suite for modelling road congestion
-
T. Robinson, ed., U.K. and International Press, Dorking, U.K
-
White, C., Taylor, N., and Hounsell, N. (1994). "CONTRAM-a computer suite for modelling road congestion." Traffic Technology Int. '94, T. Robinson, ed., U.K. and International Press, Dorking, U.K., 106-110.
-
(1994)
Traffic Technology Int. '94
, pp. 106-110
-
-
White, C.1
Taylor, N.2
Hounsell, N.3
|