메뉴 건너뛰기




Volumn 126, Issue 2, 2000, Pages 149-157

Adapting lift-slab technology to construct submerged pile caps

Author keywords

[No Author keywords available]

Indexed keywords

CAISSONS; LIFT SLAB CONSTRUCTION; PILE FOUNDATIONS; UNDERWATER FOUNDATIONS;

EID: 0343826813     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2000)126:2(149)     Document Type: Article
Times cited : (5)

References (4)
  • 1
    • 0343680031 scopus 로고
    • Use of sinking technique in the construction of underwater pile caps
    • Ali, H. (1994). "Use of sinking technique in the construction of underwater pile caps." J. Technol., Cairo, Egypt, 1(1), 20-24.
    • (1994) J. Technol., Cairo, Egypt , vol.1 , Issue.1 , pp. 20-24
    • Ali, H.1
  • 3
    • 0024139998 scopus 로고
    • Constructability improvement during field operations
    • O'Connor, J. T., and Davis, V. S. (1988). "Constructability improvement during field operations." J. Constr. Engrg. and Mgmt., ASCE, 114(4), 548-564.
    • (1988) J. Constr. Engrg. and Mgmt., ASCE , vol.114 , Issue.4 , pp. 548-564
    • O'Connor, J.T.1    Davis, V.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.