-
2
-
-
0042585041
-
Construction industry clients: A survey of their attributes and project management practices
-
Bresnen, M.J. and Haslam C.O. (1991) Construction industry clients: a survey of their attributes and project management practices. Construction Management and Economics, 9, 327-42.
-
(1991)
Construction Management and Economics
, vol.9
, pp. 327-342
-
-
Bresnen, M.J.1
Haslam, C.O.2
-
7
-
-
0042084015
-
-
University of Texas, Austin, Texas
-
Construction Industry Institute (CII) (1986) Scope Definition and Control. University of Texas, Austin, Texas.
-
(1986)
Scope Definition and Control
-
-
-
10
-
-
2342441726
-
-
University of Texas, Austin, Texas
-
Halpin, W.D., Huang, R.Y., Hastak, M., Dozzi, P.S., Unkefer, D.R. and Bopp, H.P. (1993) The Future Needs of the Construction Industry Worldwide Customers. University of Texas, Austin, Texas.
-
(1993)
The Future Needs of the Construction Industry Worldwide Customers
-
-
Halpin, W.D.1
Huang, R.Y.2
Hastak, M.3
Dozzi, P.S.4
Unkefer, D.R.5
Bopp, H.P.6
-
11
-
-
0027837602
-
Time-based competition: Competitive advantage tool for A/E/C firms
-
Hastak, M. and Vanegas, A.J. (1993) Time-based competition: Competitive advantage tool for A/E/C firms, ASCE, Construction Engineering and Management, 119, 785-800.
-
(1993)
ASCE, Construction Engineering and Management
, vol.119
, pp. 785-800
-
-
Hastak, M.1
Vanegas, A.J.2
-
12
-
-
0028516227
-
Evaluating prequalification criteria in contractor selection
-
Holt, G.D., Olomolaiye, P.O. and Harris, F.C. (1994) Evaluating prequalification criteria in contractor selection. Building and Environment, 29, 437-48.
-
(1994)
Building and Environment
, vol.29
, pp. 437-448
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
14
-
-
84948867627
-
Attributes of UK construction clients influencing project consultants' performance
-
Kometa, S.T., Olomolaiye, P.O. and Harris, F.C. (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12, 433-43.
-
(1994)
Construction Management and Economics
, vol.12
, pp. 433-443
-
-
Kometa, S.T.1
Olomolaiye, P.O.2
Harris, F.C.3
-
15
-
-
0343263572
-
Quantifying client-generated risk by project consultants
-
Kometa, S.T., Olomolaiye, P.O. and Harris, F.C. (1995a) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13 137-47.
-
(1995)
Construction Management and Economics
, vol.13
, pp. 137-147
-
-
Kometa, S.T.1
Olomolaiye, P.O.2
Harris, F.C.3
-
16
-
-
84874995285
-
An evaluation of clients' needs and responsibilities in the construction process
-
Kometa, S.T., Olomolaiye, P.O. and Harris, F.C. (1995b) An evaluation of clients' needs and responsibilities in the construction process. Engineering Construction and Architecural Management, 2, 57-76.
-
(1995)
Engineering Construction and Architecural Management
, vol.2
, pp. 57-76
-
-
Kometa, S.T.1
Olomolaiye, P.O.2
Harris, F.C.3
-
17
-
-
12444313446
-
-
Ph.D Thesis, School of Construction, Engineering and Technology, University of Wolverhampton, Wolverhampton, UK
-
Kometa, S.T. (1995c). An evaluation of client-generated risks in construction consultancies. Ph.D Thesis, School of Construction, Engineering and Technology, University of Wolverhampton, Wolverhampton, UK.
-
(1995)
An Evaluation of Client-generated Risks in Construction Consultancies
-
-
Kometa, S.T.1
-
21
-
-
0028732528
-
Critical analysis of time and cost of management and traditional contracts
-
Naoum, G.S. (1994). Critical analysis of time and cost of management and traditional contracts. ASCE, Journal of Construction Engineering and Management, 120, 687-705.
-
(1994)
ASCE, Journal of Construction Engineering and Management
, vol.120
, pp. 687-705
-
-
Naoum, G.S.1
-
24
-
-
85033005599
-
-
Battley Brothers, London
-
RIBA (1990) Architect's Appointment. Battley Brothers, London.
-
(1990)
Architect's Appointment
-
-
-
26
-
-
0004194698
-
-
Prindle, Weber & Schmidt, Boston, Massachusetts
-
Ryan, F.B., Joiner, L.B. and Ryan, A.T. (1976) Minitab Handbook, Prindle, Weber & Schmidt, Boston, Massachusetts.
-
(1976)
Minitab Handbook
-
-
Ryan, F.B.1
Joiner, L.B.2
Ryan, A.T.3
-
27
-
-
0041449293
-
-
Interim Report of the Joint Government/Industry Review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry. Department of the Environment, UK
-
Sir Michael Latham (1993) Trust and Money. Interim Report of the Joint Government/Industry Review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry. Department of the Environment, UK.
-
(1993)
Trust and Money
-
-
Latham, M.1
-
28
-
-
0002105651
-
Reliability in Educational Measurement
-
Thorndike, R.L. (ed), Washington, DC
-
Stanley, J.C. (1971) Reliability in Educational Measurement. American Council of Education, Thorndike, R.L. (ed), Washington, DC, pages 356-442.
-
(1971)
American Council of Education
, pp. 356-442
-
-
Stanley, J.C.1
-
29
-
-
0023315757
-
Project control in design engineering
-
Thrush, B., Dickmann, J. and Wilson, T. (1987) Project control in design engineering. Cost Engineering, 29, 14-19.
-
(1987)
Cost Engineering
, vol.29
, pp. 14-19
-
-
Thrush, B.1
Dickmann, J.2
Wilson, T.3
-
30
-
-
0041583040
-
-
Unpublished MSc. Thesis, Department of Architecture and Building Engineering, Bath University, Bath, United Kingdom
-
Weng, L.C. (1990) Client involvement and project performance. Unpublished MSc. Thesis, Department of Architecture and Building Engineering, Bath University, Bath, United Kingdom.
-
(1990)
Client Involvement and Project Performance
-
-
Weng, L.C.1
|