-
3
-
-
0001476556
-
Estimating the Cost of Machined Components During the Conceptual Design of a Product
-
Boothroyd, G. and Radovanovic, P., Estimating the Cost of Machined Components During the Conceptual Design of a Product, Annals of the CIRP, 1989, 38(1), pp. 157-160.
-
(1989)
Annals of the CIRP
, vol.38
, Issue.1
, pp. 157-160
-
-
Boothroyd, G.1
Radovanovic, P.2
-
4
-
-
0004041447
-
-
Marcel Dekker Inc., New York
-
Creese, R.C., Adithan, M. and Pabla, B.S., Estimating and Costing for the Metal Manufacturing Industries, Marcel Dekker Inc., New York, 1992.
-
(1992)
Estimating and Costing for the Metal Manufacturing Industries
-
-
Creese, R.C.1
Adithan, M.2
Pabla, B.S.3
-
5
-
-
85031635156
-
Methods and Tools for cost estimation in mechanical manufacturing (METACOST)
-
Eversheim, W., Gupta, C. and Kümper, R., Methods and Tools for cost estimation in mechanical manufacturing (METACOST), Production Engineering, 1(2), 1994, pp. 201-204.
-
(1994)
Production Engineering
, vol.1
, Issue.2
, pp. 201-204
-
-
Eversheim, W.1
Gupta, C.2
Kümper, R.3
-
6
-
-
0030296040
-
Cost evaluation in design with form features
-
Feng, C.-X., Kusiak, A. and Huang, C.-C, Cost evaluation in design with form features, Computer-Aided Design, 28(11), 1996, pp. 879-885.
-
(1996)
Computer-Aided Design
, vol.28
, Issue.11
, pp. 879-885
-
-
Feng, C.-X.1
Kusiak, A.2
Huang, C.-C3
-
7
-
-
85148728909
-
MT-400: Analyse des coûts de fabrication
-
Internal DEVIPLAN Report, EPFL
-
Gunther, C. and Lejal-Glaude, V., MT-400: Analyse des coûts de fabrication, Internal DEVIPLAN Report, 1999, EPFL.
-
(1999)
-
-
Gunther, C.1
Lejal-Glaude, V.2
-
8
-
-
85010758072
-
A methodology for systematic generation and evaluation of alternative operation plans
-
ed. J.J. Shah, M. Mantyla and D.S. Nau, Elsevier Science B.V
-
Gupta, S.K., Nau, D.S., Regli, W.C. and Zhang, G., A methodology for systematic generation and evaluation of alternative operation plans, in Advances in Feature Based Manufacturing, ed. J.J. Shah, M. Mantyla and D.S. Nau, Elsevier Science B.V., 1994, pp. 161-184.
-
(1994)
Advances in Feature Based Manufacturing
, pp. 161-184
-
-
Gupta, S.K.1
Nau, D.S.2
Regli, W.C.3
Zhang, G.4
-
9
-
-
0003858684
-
-
report ISR-TR-95-14, University of Maryland
-
Gupta, S.K., Regli, W.C, Das, D. and Nau, D.S., Automated manufacturability analysis: a survey, report ISR-TR-95-14, University of Maryland, 1995.
-
(1995)
Automated manufacturability analysis: a survey
-
-
Gupta, S.K.1
Regli, W.C2
Das, D.3
Nau, D.S.4
-
10
-
-
85100734368
-
An Incremental Part Manufacturing Cost Estimation Algorithm Using Petri Nets
-
September 1998, Atlanta
-
Kiritsis, D. and Xirouchakis, P., 1998, "An Incremental Part Manufacturing Cost Estimation Algorithm Using Petri Nets", ASME DETC'98, September 1998, Atlanta.
-
(1998)
ASME DETC'98
-
-
Kiritsis, D.1
Xirouchakis, P.2
-
11
-
-
46249122021
-
Manufacturing Resource Modeling with Petri Nets
-
September 1999, Las Vegas
-
Kiritsis, D. and Xirouchakis, P., 1999, "Manufacturing Resource Modeling with Petri Nets", ASME DETC'99, September 1999, Las Vegas.
-
(1999)
ASME DETC'99
-
-
Kiritsis, D.1
Xirouchakis, P.2
-
12
-
-
0033137565
-
Petri Net Techniques for Process Planning Cost Estimation
-
Kiritsis, D., Xirouchakis, P. and Neuendorf, K.-P., Petri Net Techniques for Process Planning Cost Estimation, Advances in Engineering Software, 30, 1999, pp. 375-387.
-
(1999)
Advances in Engineering Software
, vol.30
, pp. 375-387
-
-
Kiritsis, D.1
Xirouchakis, P.2
Neuendorf, K.-P.3
-
13
-
-
0031371620
-
An Integrated System for Simultaneous Bid Preparation
-
Krömker, M., Thoben, K.-D., Kebbel A. and Schönert HJ., An Integrated System for Simultaneous Bid Preparation, IEEE SMC Conference, 1997, pp. 3597-3602.
-
(1997)
IEEE SMC Conference
, pp. 3597-3602
-
-
Krömker, M.1
Thoben, K.-D.2
Kebbel, A.3
Schönert, HJ.4
-
14
-
-
0027073047
-
A CAPP system for nonlinear process plans
-
Kruth, J.P. and Detand, J., A CAPP system for nonlinear process plans, Annals of the CIRP, 1992, 41(1), pp. 489-492.
-
(1992)
Annals of the CIRP
, vol.41
, Issue.1
, pp. 489-492
-
-
Kruth, J.P.1
Detand, J.2
-
15
-
-
85148733297
-
-
CETIM, Senlis, 7 octobre
-
Lallemand, H., Méthodes de chiffrages et indicateurs de la fonction DEVIS, Journée technique: le devis au coeur de la performance, CETIM, Senlis, 7 octobre, 1998.
-
(1998)
Méthodes de chiffrages et indicateurs de la fonction DEVIS, Journée technique: le devis au coeur de la performance
-
-
Lallemand, H.1
-
16
-
-
0030684889
-
Cost decision support in product design
-
Liebers, A. and Kals, H.J.J., Cost decision support in product design, Annals of the CIRP, 46(1), 1997, pp. 107-112.
-
(1997)
Annals of the CIRP
, vol.46
, Issue.1
, pp. 107-112
-
-
Liebers, A.1
Kals, H.J.J.2
-
17
-
-
85031636347
-
Integrated Cost Estimation for Assembled Products
-
Johannesburg
-
Liebers, A., Integrated Cost Estimation for Assembled Products, CIRP Seminar on Manufacturing systems, available at: http://www.pt.wb.utwente.nl/staff/arthur/papers.html. Johannesburg, 1996.
-
(1996)
CIRP Seminar on Manufacturing systems
-
-
Liebers, A.1
-
18
-
-
0029489571
-
An Integrated System for Process Planning and Cost Estimation in Hole making
-
Luong, L.H.S. and Spedding, T., An Integrated System for Process Planning and Cost Estimation in Hole making, The International Journal of Advanced Manufacturing Technology, 10, 1995, pp. 411-415.
-
(1995)
The International Journal of Advanced Manufacturing Technology
, vol.10
, pp. 411-415
-
-
Luong, L.H.S.1
Spedding, T.2
-
20
-
-
0031344631
-
Developing an integrated framework for feature-based early manufacturing cost estimation
-
Ou-Yang, C. and Lin, T.S., Developing an integrated framework for feature-based early manufacturing cost estimation, The International Journal of Advanced Manufacturing Technology, 13, 1997, pp. 618-629.
-
(1997)
The International Journal of Advanced Manufacturing Technology
, vol.13
, pp. 618-629
-
-
Ou-Yang, C.1
Lin, T.S.2
-
21
-
-
0031636072
-
A Petri Net Technique for Process Planning Cost Estimation
-
Xirouchakis, P., Kiritsis, D. and Persson, J.G., A Petri Net Technique for Process Planning Cost Estimation, CIRP Annals, 47/1/1998, pp. 427-430.
-
(1998)
CIRP Annals
, vol.47
, Issue.1
, pp. 427-430
-
-
Xirouchakis, P.1
Kiritsis, D.2
Persson, J.G.3
-
22
-
-
0032677946
-
A Petri Net Technique for Batch Delivery Time Estimation
-
Xirouchakis, P., Kiritsis, D., Gunther, C. and Persson, J.G., A Petri Net Technique for Batch Delivery Time Estimation, CIRP Annals, 48/1/1999, pp. 361-364.
-
(1999)
CIRP Annals
, vol.48
, Issue.1
, pp. 361-364
-
-
Xirouchakis, P.1
Kiritsis, D.2
Gunther, C.3
Persson, J.G.4
|