메뉴 건너뛰기




Volumn 25, Issue 5, 1996, Pages 1105-1121

On-line scheduling of imprecise computations to minimize error

Author keywords

Deterministic scheduling; On line scheduling; Real time systems; Scheduling to meet deadlines

Indexed keywords


EID: 0242688579     PISSN: 00975397     EISSN: None     Source Type: Journal    
DOI: 10.1137/S0097539792233634     Document Type: Article
Times cited : (16)

References (13)
  • 1
    • 0023541889 scopus 로고
    • Concord: A system of imprecise computations
    • IEEE Press, Piscataway, NJ
    • K. J. LIN, S. NATARAJAN, W. S. LIU, AND T. KRAUSKOPF, Concord: A system of imprecise computations, in Proc. 1987 IEEE Compsac, IEEE Press, Piscataway, NJ, 1987, pp. 75-81.
    • (1987) Proc. 1987 IEEE Compsac , pp. 75-81
    • Lin, K.J.1    Natarajan, S.2    Liu, W.S.3    Krauskopf, T.4
  • 2
    • 4243158624 scopus 로고
    • Scheduling real-time, periodic jobs using imprecise results
    • IEEE Press, Piscataway, NJ
    • J. W. S. LIU, K. J. LIN, AND S. NATARAJAN, Scheduling real-time, periodic jobs using imprecise results, in Proc. 8th IEEE Real-Time Systems Symposium, IEEE Press, Piscataway, NJ, 1987, pp. 210-217.
    • (1987) Proc. 8th IEEE Real-Time Systems Symposium , pp. 210-217
    • Liu, J.W.S.1    Lin, K.J.2    Natarajan, S.3
  • 3
    • 0024172468 scopus 로고
    • Performance of algorithms for scheduling periodic jobs to minimize average error
    • IEEE Press, Piscataway, NJ
    • J. Y. CHUNG AND J. W. S. LIU, Performance of algorithms for scheduling periodic jobs to minimize average error, in Proc. 9th IEEE Real-Time Systems Symposium, IEEE Press, Piscataway, NJ, 1988, pp. 142-151.
    • (1988) Proc. 9th IEEE Real-Time Systems Symposium , pp. 142-151
    • Chung, J.Y.1    Liu, J.W.S.2
  • 5
    • 0024887340 scopus 로고
    • Algorithms for scheduling imprecise computations with timing constraints
    • IEEE Press, Piscataway, NJ
    • W. K. SHIH, J. W. S. LIU, AND J. Y. CHUNG, Algorithms for scheduling imprecise computations with timing constraints, in Proc. 10th IEEE Real-Time Systems Symposium, IEEE Press, Piscataway, NJ, 1989, pp. 12-19; SIAM J. Comput., 20 (1991), pp. 537-552.
    • (1989) Proc. 10th IEEE Real-Time Systems Symposium , pp. 12-19
    • Shih, W.K.1    Liu, J.W.S.2    Chung, J.Y.3
  • 6
    • 0026168899 scopus 로고
    • W. K. SHIH, J. W. S. LIU, AND J. Y. CHUNG, Algorithms for scheduling imprecise computations with timing constraints, in Proc. 10th IEEE Real-Time Systems Symposium, IEEE Press, Piscataway, NJ, 1989, pp. 12-19; SIAM J. Comput., 20 (1991), pp. 537-552.
    • (1991) SIAM J. Comput. , vol.20 , pp. 537-552
  • 7
    • 0023642114 scopus 로고
    • Minimizing mean weighted execution time loss on identical and uniform processors
    • J. BLAZEWICZ AND G. FINKE, Minimizing mean weighted execution time loss on identical and uniform processors, Inform. Process. Lett., 24 (1987), pp. 259-263.
    • (1987) Inform. Process. Lett. , vol.24 , pp. 259-263
    • Blazewicz, J.1    Finke, G.2
  • 10
    • 85033861430 scopus 로고
    • Technical Report, Department of Computer Science, University of Adelaide, Adelaide, SA, Australia, October
    • _, User controlled optimization in task scheduling for imprecise computer systems, Technical Report, Department of Computer Science, University of Adelaide, Adelaide, SA, Australia, October 1988.
    • (1988) User Controlled Optimization in Task Scheduling for Imprecise Computer Systems
  • 12
    • 0014571702 scopus 로고
    • A functional equation and its application to resource allocation and scheduling problem
    • E. L. LAWLER AND J. M. MOORE, A functional equation and its application to resource allocation and scheduling problem, Management Sci., 16 (1969), pp. 77-84.
    • (1969) Management Sci. , vol.16 , pp. 77-84
    • Lawler, E.L.1    Moore, J.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.