Volumn 18, Issue 2-3, 2003, Pages 291-301

An observational excavation control method for adjacent mountain tunnels

Author keywords

Adjacent tunnel; Displacement; Excavation method; Fore piling system; Mountain tunnel; Observational construction control

Indexed keywords

CLAY; CONCRETE CONSTRUCTION; FINITE ELEMENT METHOD; FRACTURE; GEOLOGY; STRESSES; TUNNELING (EXCAVATION);

EID: 0242668330     PISSN: 08867798     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0886-7798(03)00043-9     Document Type: Article
Times cited : (20)

References (3)
  • 1
    • 0242427228 scopus 로고    scopus 로고
    • On the impact forecast to the existing tunnel by observational construction method
    • Ishihara, M., Kiyota, Y., Kurita, T., Kawashima, Y., 2001. On the impact forecast to the existing tunnel by observational construction method. Tunnels Underground 32 (7), 15-25.
    • (2001) Tunnels Underground , vol.32 , Issue.7 , pp. 15-25
    • Ishihara, M.1    Kiyota, Y.2    Kurita, T.3    Kawashima, Y.4
  • 2
    • 0242595356 scopus 로고    scopus 로고
    • Japan Highway Public Corporation Tunnel Construction, Maintenance Edition Adjacent Construction
    • Japan Highway Public Corporation (1998):Design Manual Vol. 3 (1) Tunnel Construction, Maintenance Edition (Adjacent Construction).
    • (1998) Design Manual , vol.3 , Issue.1
  • 3
    • 0242679144 scopus 로고    scopus 로고
    • Development of the steel pipe injection fore-piling system of smaller-diameter and medium-length type
    • Ebisu, S., Akutsu, A., Takahashi, N., Nakamura, H., Kurita, T., 2000. Development of the steel pipe injection fore-piling system of smaller-diameter and medium-length type. Ann Rep Tech Res Inst Okumura Corp 26, 7-12.
    • (2000) Ann Rep Tech Res Inst Okumura Corp , vol.26 , pp. 7-12
    • Ebisu, S.1    Akutsu, A.2    Takahashi, N.3    Nakamura, H.4    Kurita, T.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.