-
1
-
-
0002977068
-
Prediction of ground movements and assessment of risk of building damage due to bored tunnelling
-
London (Mair R. J. and Taylor R. N. (eds)). Balkema, Rotterdam
-
MAIR R. J., TAYLOR R. N. and BURLAND J. B. Prediction of ground movements and assessment of risk of building damage due to bored tunnelling. International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London (MAIR R. J. and TAYLOR R. N. (eds)). Balkema, Rotterdam, 1996, pp. 623-628.
-
(1996)
International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground
, pp. 623-628
-
-
Mair, R.J.1
Taylor, R.N.2
Burland, J.B.3
-
3
-
-
0242518710
-
A simple methodology for evaluating the potential damage to buried cast iron pipes from ground movement arising from tunnelling
-
London, 1996 (Mair R. J. and Taylor R. N. (eds)). Balkema, Rotterdam
-
BRACEGIRDLE A., MAIR R. J., NYREN R. J. and TAYLOR R. N. A simple methodology for evaluating the potential damage to buried cast iron pipes from ground movement arising from tunnelling. Proceedings of an International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London, 1996 (MAIR R. J. and TAYLOR R. N. (eds)). Balkema, Rotterdam, 1996, pp. 569-575.
-
(1996)
Proceedings of an International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground
, pp. 569-575
-
-
Bracegirdle, A.1
Mair, R.J.2
Nyren, R.J.3
Taylor, R.N.4
-
4
-
-
85039349133
-
-
(Burland J. B., Standing J. R. and Jardine F. M. (eds)). Thomas Telford, London
-
BURLAND J. B. Results of the research, in 'Building response to tunnelling, case studies from construction of the Jubilee Line Extension, London' (BURLAND J. B., STANDING J. R. and JARDINE F. M. (eds)). Thomas Telford, London, 2001, pp. 315-344.
-
(2001)
Results of the Research, in 'Building Response to Tunnelling, Case Studies from Construction of the Jubilee Line Extension, London
, pp. 315-344
-
-
Burland, J.B.1
-
5
-
-
0242435217
-
Discussion: Can settlements over tunnels be accurately predicted using advanced numerical methods?
-
Tokyo (Kusakabe O., Fujita K. and Miyazaki Y. (eds)). Balkema, Rotterdam
-
SHIRLAW J. N. Discussion: Can settlements over tunnels be accurately predicted using advanced numerical methods? Proceedings of an International Symposium on Geotechncial Aspects of Underground Construction in Soft Ground, Tokyo (KUSAKABE O., FUJITA K. and MIYAZAKI Y. (eds)). Balkema, Rotterdam, 2000, pp. 471-472.
-
(2000)
Proceedings of an International Symposium on Geotechncial Aspects of Underground Construction in Soft Ground
, pp. 471-472
-
-
Shirlaw, J.N.1
-
6
-
-
57249100721
-
Characterization of Singapore, Bangkok and Ariake clays
-
TANAKA H., LOCAT J., SHIBUYA S., TAN T. S. and SHIWAKOTI D. R. Characterization of Singapore, Bangkok and Ariake clays. Canadian Geotechnical Journal, 2001, 38, 378-400.
-
(2001)
Canadian Geotechnical Journal
, vol.38
, pp. 378-400
-
-
Tanaka, H.1
Locat, J.2
Shibuya, S.3
Tan, T.S.4
Shiwakoti, D.R.5
-
7
-
-
0023523872
-
The Old Alluvium of Singapore and the extinct drainage system to the South China Sea
-
GUPTA A., RAHMAN A., WONG P. P. and PITTS J. The Old Alluvium of Singapore and the extinct drainage system to the South China Sea. Earth Surface Processes and Landforms, 1987, 12, 259-275.
-
(1987)
Earth Surface Processes and Landforms
, vol.12
, pp. 259-275
-
-
Gupta, A.1
Rahman, A.2
Wong, P.P.3
Pitts, J.4
-
8
-
-
0242603468
-
A revised interpretation of Old Alluvium Formation based on ground investigations for the Changi Airport Line
-
Singapore
-
PEART M., POH J. and KHO C. M. A revised interpretation of Old Alluvium Formation based on ground investigations for the Changi Airport Line. Proceedings of Underground Singapore 2001, Singapore, 2001, 283-295.
-
(2001)
Proceedings of Underground Singapore 2001
, pp. 283-295
-
-
Peart, M.1
Poh, J.2
Kho, C.M.3
-
9
-
-
0242518711
-
Design and construction issues for excavation and tunnelling in some tropically weathered rocks and soils
-
Melbourne, Australia, 19-24 November 2000. Technomic Publishing, PA, USA
-
SHIRLAW J. N., HENCHER S. R. and ZHAO J. Design and construction issues for excavation and tunnelling in some tropically weathered rocks and soils. Proceedings of GeoEng2000, Melbourne, Australia, 19-24 November 2000. Technomic Publishing, PA, USA, 2000, 1, 1286-1329.
-
(2000)
Proceedings of GeoEng2000
, vol.1
, pp. 1286-1329
-
-
Shirlaw, J.N.1
Hencher, S.R.2
Zhao, J.3
-
10
-
-
0007569277
-
Properties and origins of the Singapore Boulder Bed
-
Taipei, ROC, April
-
SHIRLAW J. N., POH K. B. and HWANG R. N. Properties and origins of the Singapore Boulder Bed. Proceedings of the 10th South East Asian Geotechnical Conference, Taipei, ROC, April 1990, pp. 463-468.
-
(1990)
Proceedings of the 10th South East Asian Geotechnical Conference
, pp. 463-468
-
-
Shirlaw, J.N.1
Poh, K.B.2
Hwang, R.N.3
-
11
-
-
0013617489
-
The origin and properties of Bouldery Clay in Singapore
-
HAN K. K., WONG K. S., BROMS B. B. and YAP L. P. The origin and properties of Bouldery Clay in Singapore. Journal of the Southeast Asian Geotechnical Society, 1994, 24, No. 2, 151-166.
-
(1994)
Journal of the Southeast Asian Geotechnical Society
, vol.24
, Issue.2
, pp. 151-166
-
-
Han, K.K.1
Wong, K.S.2
Broms, B.B.3
Yap, L.P.4
-
12
-
-
0013127357
-
Immediate settlements due to tunnelling for the North East Line
-
Singapore
-
SHIRLAW J. N., ONG J. C. W., ROSSER H. B., OSBORNE N. H., TAN C. G. and HESLOP P. J. E. Immediate settlements due to tunnelling for the North East Line. Proceedings of Underground Singapore 2001. Singapore, 2001, 76-90.
-
(2001)
Proceedings of Underground Singapore 2001
, pp. 76-90
-
-
Shirlaw, J.N.1
Ong, J.C.W.2
Rosser, H.B.3
Osborne, N.H.4
Tan, C.G.5
Heslop, P.J.E.6
-
13
-
-
0242518714
-
Singapore mass rapid transit system: Discussion
-
Aug
-
HULME T. W., CHAPMAN P. H. J., POK S. F., COPSEY J. P., KRAFT B., SRIPATHY P., POTTER L. A. C. and SHIRLAW J. N. Singapore mass rapid transit system: discussion. Proceedings of the Institution of Civil Engineers, Part 1, 90, Aug., 463-502.
-
Proceedings of the Institution of Civil Engineers
, vol.90
, Issue.PART 1
, pp. 463-502
-
-
Hulme, T.W.1
Chapman, P.H.J.2
Pok, S.F.3
Copsey, J.P.4
Kraft, B.5
Sripathy, P.6
Potter, L.A.C.7
Shirlaw, J.N.8
-
14
-
-
0242518713
-
-
Geotechnical Engineering Monograph 2, NTU-PWD Geotechnical Research Centre
-
ZHAO J., LEE K. W., CHOA V., LIU Q. and CAI J. G. Underground cavern development in the Jurong formation of sedimentary rocks. Geotechnical Engineering Monograph 2, NTU-PWD Geotechnical Research Centre, 1999.
-
(1999)
Underground Cavern Development in the Jurong Formation of Sedimentary Rocks
-
-
Zhao, J.1
Lee, K.W.2
Choa, V.3
Liu, Q.4
Cai, J.G.5
-
15
-
-
0003692136
-
-
British Standards Institution. BSI, London, BS 5930
-
BRITISH STANDARDS INSTITUTION. Code of Practice for Site Investigations. BSI, London, 1999, BS 5930.
-
(1999)
Code of Practice for Site Investigations
-
-
-
18
-
-
85052717515
-
Settlements caused by earth pressure balance shields in Singapore
-
Presse de l'Ecole Nationale des Ponts et Chaussées, Paris
-
BROMS B. B. and SHIRLAW J. N. Settlements caused by earth pressure balance shields in Singapore. In Tunnels et Micro-tunnels en Terrain Meuble-Du Chantier xa la Théorie. Presse de l'Ecole Nationale des Ponts et Chaussées, Paris, 1989, pp. 209-219.
-
(1989)
Tunnels et Micro-Tunnels En Terrain Meuble-Du Chantier xa la Théorie
, pp. 209-219
-
-
Broms, B.B.1
Shirlaw, J.N.2
-
19
-
-
0242518715
-
Consolidation settlements over tunnels: A review
-
The Tunnelling Association of Canada
-
SHIRLAW J. N., BUSBRIDGE J. R. and YI X. Consolidation settlements over tunnels: a review. Canadian Tunnelling 1994, The Tunnelling Association of Canada, 1994, 253-266.
-
(1994)
Canadian Tunnelling 1994
, pp. 253-266
-
-
Shirlaw, J.N.1
Busbridge, J.R.2
Yi, X.3
-
21
-
-
0010658175
-
Long-term settlements over tunnels: An eleven year study at Grimsby
-
London, Institution of Mining and Metallurgy
-
O'REILLY M. P., MAIR R. J. and ALDERMAN G. H. Long-term settlements over tunnels: an eleven year study at Grimsby. Proceedings of Tunnelling 91, London, 1991. Institution of Mining and Metallurgy, 55-64.
-
(1991)
Proceedings of Tunnelling 91
, pp. 55-64
-
-
O'Reilly, M.P.1
Mair, R.J.2
Alderman, G.H.3
-
22
-
-
0008964907
-
Observed and calculated pore pressures and deformations induced by an earth pressure balance shield: Discussion
-
SHIRLAW J. N. Observed and calculated pore pressures and deformations induced by an earth pressure balance shield: Discussion. Canadian Geotechnical Journal, 1995, 32, 181-189.
-
(1995)
Canadian Geotechnical Journal
, vol.32
, pp. 181-189
-
-
Shirlaw, J.N.1
-
24
-
-
0242687432
-
Construction of effluent outfall pipeline using earth pressure balance shield
-
Nanyang Technological Institute, Singapore
-
BALASUBRAMANIAM, K. Construction of effluent outfall pipeline using earth pressure balance shield. Proceedings of the 5th International Geotechnical Seminar, Nanyang Technological Institute, Singapore, 1987, 17-40.
-
(1987)
Proceedings of the 5th International Geotechnical Seminar
, pp. 17-40
-
-
Balasubramaniam, K.1
-
26
-
-
0026880944
-
Bored tunnelling for Singapore Metro
-
ASCE
-
HULME T. W. and BURCHELL A. J. Bored tunnelling for Singapore Metro. Journal of Construction Engineering and Management, ASCE, 1992, 118, No. 2, 363-384.
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.2
, pp. 363-384
-
-
Hulme, T.W.1
Burchell, A.J.2
-
29
-
-
0242687433
-
Prediction of ground settlement caused by tunnelling through Old Alluvium and the initial measurement
-
Singapore
-
CHAN B. B., CHAN K. M., CHAN K. S. and SONG, T. W. Prediction of ground settlement caused by tunnelling through Old Alluvium and the initial measurement. Proceedings of an International Conference on Rail Transit. Singapore, 1999, vol. 2, pp. 557-566.
-
(1999)
Proceedings of an International Conference on Rail Transit
, vol.2
, pp. 557-566
-
-
Chan, B.B.1
Chan, K.M.2
Chan, K.S.3
Song, T.W.4
-
31
-
-
0242518717
-
Stability and settlement due to bored tunnelling for LTA, NEL
-
Singapore (Zhao J., Shirlaw J. N. and Krishnan R. (eds)). Balkema, Rotterdam
-
IZUMI C., NORRISH A., KAHTRI N. N. and DAVIES R, Stability and settlement due to bored tunnelling for LTA, NEL. Proceedings of Tunnels and Underground Structures, Singapore (ZHAO J., SHIRLAW J. N. and KRISHNAN R. (eds)). Balkema, Rotterdam, 2000, pp. 555-560.
-
(2000)
Proceedings of Tunnels and Underground Structures
, pp. 555-560
-
-
Izumi, C.1
Norrish, A.2
Kahtri, N.N.3
Davies, R.4
-
32
-
-
0242603472
-
Lining design and ground response to the construction of the Clarke Quay tunnels
-
Singapore (Zhao J., Shirlaw J. N. and Krishnan, R. (eds)). Balkema, Rotterdam
-
RAJU G. V. R., HEATH G. K. and LIM K. Lining design and ground response to the construction of the Clarke Quay tunnels. Proceedings of Tunnels and Underground Structures, Singapore (ZHAO J., SHIRLAW J. N. and KRISHNAN, R. (eds)). Balkema, Rotterdam, 2000, pp. 213-218.
-
(2000)
Proceedings of Tunnels and Underground Structures
, pp. 213-218
-
-
Raju, G.V.R.1
Heath, G.K.2
Lim, K.3
-
33
-
-
0242687435
-
Immediate settlements due to tunnelling for the North East Line, Singapore
-
Toulouse
-
SHIRLAW J. N., ONG J. C. W., ROSSER H. B. and HESLOP P. J. E. Immediate settlements due to tunnelling for the North East Line, Singapore. Proceedings of Geotechnical Aspects of Underground Construction in Soft Ground, Toulouse, 2002, pp. 209-214.
-
(2002)
Proceedings of Geotechnical Aspects of Underground Construction in Soft Ground
, pp. 209-214
-
-
Shirlaw, J.N.1
Ong, J.C.W.2
Rosser, H.B.3
Heslop, P.J.E.4
-
34
-
-
0242603473
-
The relationship between face pressure and immediate settlement due to tunnelling for the North East Line, Singapore
-
Toulouse
-
SHIRLAW J. N., ONG J. C. W, OSBORNE N. H. and TAN C. G. The relationship between face pressure and immediate settlement due to tunnelling for the North East Line, Singapore. Proceedings of Geotechnical Aspects of Underground Construction in Soft Ground, Toulouse, 2002, 311-316.
-
(2002)
Proceedings of Geotechnical Aspects of Underground Construction in Soft Ground
, pp. 311-316
-
-
Shirlaw, J.N.1
Ong, J.C.W.2
Osborne, N.H.3
Tan, C.G.4
-
35
-
-
0242687436
-
Ground control of tunnelling beneath an operating railway tunnel in Singapore
-
Singapore (Zhao J., Shirlaw J. N. and Krishnan R. (eds)). Balkema, Rotterdam
-
OSBORNE N. H., WILLIAMS O. I. and LIM W. B. Ground control of tunnelling beneath an operating railway tunnel in Singapore. Proceedings of Tunnels and Underground Structures, Singapore (ZHAO J., SHIRLAW J. N. and KRISHNAN R. (eds)). Balkema, Rotterdam, 2000, pp. 515-520.
-
(2000)
Proceedings of Tunnels and Underground Structures
, pp. 515-520
-
-
Osborne, N.H.1
Williams, O.I.2
Lim, W.B.3
-
36
-
-
0019657269
-
Centrifugal testing of model tunnels in soft clay
-
Stockholm, Balkema, Rotterdam
-
KIMURA T. and MAIR R. J. Centrifugal testing of model tunnels in soft clay. Proceedings of the 10th International Conference on Soil Mechanics and Foundation Engineering. Stockholm. Balkema, Rotterdam, 1981, vol. 1, 319-322.
-
(1981)
Proceedings of the 10th International Conference on Soil Mechanics and Foundation Engineering
, vol.1
, pp. 319-322
-
-
Kimura, T.1
Mair, R.J.2
-
37
-
-
0035737506
-
Soil consolidation associated with grouting during shield tunnelling in soft clayey ground
-
KOMIYA K., SOGA K., AGAKI H., JAFARI M. and BOLTON M. D. Soil consolidation associated with grouting during shield tunnelling in soft clayey ground. Géotechnique, 2001, 51, No. 10, 835-846.
-
(2001)
Géotechnique
, vol.51
, Issue.10
, pp. 835-846
-
-
Komiya, K.1
Soga, K.2
Agaki, H.3
Jafari, M.4
Bolton, M.D.5
-
38
-
-
0242603474
-
Controlling the risk of excessive settlement during EPB tunnelling
-
NTU, Singapore
-
SHIRLAW J. N. Controlling the risk of excessive settlement during EPB tunnelling. Proceedings of Case Studies in Geotechnical Engineering, NTU, Singapore, 2000, pp. 147-174.
-
(2000)
Proceedings of Case Studies in Geotechnical Engineering
, pp. 147-174
-
-
Shirlaw, J.N.1
-
39
-
-
0242518718
-
Difficult ground conditions encountered during construction of a cross passage in Old Alluvium
-
Singapore
-
KNIGHT HASSELL C. K., ROSSER H. B. and ENG W. C. Difficult ground conditions encountered during construction of a cross passage in Old Alluvium. Proceedings of Underground Singapore 2001, Singapore, 2001, 24-31.
-
(2001)
Proceedings of Underground Singapore 2001
, pp. 24-31
-
-
Knight Hassell, C.K.1
Rosser, H.B.2
Eng, W.C.3
-
42
-
-
0242687439
-
The Jurong Formation, a variable ground condition - Its tunnelling characteristics
-
Singapore
-
OSBORNE N. H., LIM W. B. and WILLIAMS O. I. The Jurong Formation, a variable ground condition-its tunnelling characteristics. Proceedings of Underground Singapore 2001, Singapore, 2001, 123-133.
-
(2001)
Proceedings of Underground Singapore 2001
, pp. 123-133
-
-
Osborne, N.H.1
Lim, W.B.2
Williams, O.I.3
-
45
-
-
0242603479
-
Managing risks in major civil engineering works-North East Line experience
-
Singapore
-
KRISHNAN R. Managing risks in major civil engineering works-North East Line experience. Proceedings of Underground Singapore 2001, Singapore, 2001, 5-12.
-
(2001)
Proceedings of Underground Singapore 2001
, pp. 5-12
-
-
Krishnan, R.1
-
46
-
-
0242603478
-
Construction of the North East line tunnels at Singapore River Crossing
-
Singapore (Zhao J., Shirlaw J. N. and Krishnan R. (eds)). Balkema, Rotterdam
-
SEBASTIAN P. and NADARAJAH P. Construction of the North East line tunnels at Singapore River Crossing. Proceedings of Tunnels and Underground Structures, Singapore (ZHAO J., SHIRLAW J. N. and KRISHNAN R. (eds)). Balkema, Rotterdam, 2000, pp. 191-198.
-
(2000)
Proceedings of Tunnels and Underground Structures
, pp. 191-198
-
-
Sebastian, P.1
Nadarajah, P.2
-
47
-
-
0242435214
-
Damage assessment of adjacent structures due to bored tunnelling for Changi Airport Line
-
Singapore
-
RAJU G. V. R., NG C. C. and KUMAR B. S. Damage assessment of adjacent structures due to bored tunnelling for Changi Airport Line. Proceedings of Underground Singapore 2001, Singapore, 2001, pp. 65-75.
-
(2001)
Proceedings of Underground Singapore 2001
, pp. 65-75
-
-
Raju, G.V.R.1
Ng, C.C.2
Kumar, B.S.3
-
48
-
-
0027788779
-
EPB shield tunnelling in mixed face conditions
-
ASCE
-
CLOUGH G. W. and LECA E. EPB shield tunnelling in mixed face conditions. Journal of Geotechnical Engineering. ASCE, 1993, 119, No. 10, 1640-1656.
-
(1993)
Journal of Geotechnical Engineering
, vol.119
, Issue.10
, pp. 1640-1656
-
-
Clough, G.W.1
Leca, E.2
-
50
-
-
0008929578
-
Earth pressure balance TBM performance - A case study
-
GARROD B. and DELMER R. Earth pressure balance TBM performance-a case study. Canadian Tunnelling, 1998, 41-50.
-
(1998)
Canadian Tunnelling
, pp. 41-50
-
-
Garrod, B.1
Delmer, R.2
-
52
-
-
0242687443
-
Monitoring during the construction of the Allen Road Sewer, Toronto, Canada
-
(Mair R. J. and Taylor R. N. (eds)). Balkema, Rotterdam
-
SHIRLAW J. N., PENNINGTON B. N. and YI X. Monitoring during the construction of the Allen Road Sewer, Toronto, Canada. Proceedings of an International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground (MAIR R. J. and TAYLOR R. N. (eds)). Balkema, Rotterdam, 1996, pp. 429-434.
-
(1996)
Proceedings of an International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground
, pp. 429-434
-
-
Shirlaw, J.N.1
Pennington, B.N.2
Yi, X.3
-
54
-
-
0242603480
-
Dangerous gap between theory and practice in earth pressure balance shield tunnelling in Japan
-
Kyoto (Adachi T., Tateyama K. and Kimura M. (eds)). Swets and Zeitlinger
-
KIMURA K. Dangerous gap between theory and practice in earth pressure balance shield tunnelling in Japan. Proceedings of Modern Tunnelling Science and Technology, Kyoto (ADACHI T., TATEYAMA K. and KIMURA M. (eds)). Swets and Zeitlinger, 2001.
-
(2001)
Proceedings of Modern Tunnelling Science and Technology
-
-
Kimura, K.1
-
55
-
-
0242435227
-
The new St Clair River railway tunnel. The Project - Concept and Construction
-
HARRISON N., KERRIGAN R. E. and MACLENNAN D. G. The new St Clair River railway tunnel. The Project-Concept and Construction. Canadian Tunnelling, 1994, 277-290.
-
(1994)
Canadian Tunnelling
, pp. 277-290
-
-
Harrison, N.1
Kerrigan, R.E.2
MacLennan, D.G.3
-
56
-
-
0242603476
-
Déplacements verticaux liés au creusement au bouclier à pression de terre (EPBM); cas du Metro de Lille-Ligne 2: Lots 1 et 2
-
Chambery, 21-24 October
-
LEBLAIS Y., LECA E. and MAUROY F. Déplacements verticaux liés au creusement au bouclier à pression de terre (EPBM); cas du Metro de Lille-Ligne 2: lots 1 et 2, Proceedings of International Conference AFTES, Underground Works: Techniques and Men, Chambery, 21-24 October 1996, pp. 483-487.
-
(1996)
Proceedings of International Conference AFTES, Underground Works: Techniques and Men
, pp. 483-487
-
-
Leblais, Y.1
Leca, E.2
Mauroy, F.3
-
57
-
-
0242435226
-
Oporto Metro breakthrough
-
ANON. November
-
ANON. Oporto Metro breakthrough. Tunnels and Tunnelling International, 2002, November, 7.
-
(2002)
Tunnels and Tunnelling International
, vol.7
-
-
-
58
-
-
0036538224
-
Shenzen Metro
-
Apr
-
WALLIS S. Shenzen Metro. World Tunnelling, 2002, Apr., 130-134.
-
(2002)
World Tunnelling
, pp. 130-134
-
-
Wallis, S.1
-
60
-
-
0242687442
-
Hastings bathing water improvement scheme
-
Sept
-
CATO M., EDDY C., CORCORAN J. and NATTRAS H. Hastings Bathing Water Improvement Scheme. Tunnels and Tunnelling International, 2000, Sept., 47-51.
-
(2000)
Tunnels and Tunnelling International
, pp. 47-51
-
-
Cato, M.1
Eddy, C.2
Corcoran, J.3
Nattras, H.4
-
61
-
-
0003825086
-
-
Singapore Public Works Department. Singapore Public Works Department
-
SINGAPORE PUBLIC WORKS DEPARTMENT. The Geology of the Republic of Singapore. Singapore Public Works Department, 1976.
-
(1976)
The Geology of the Republic of Singapore
-
-
-
62
-
-
0242687445
-
-
Singapore Land Transport Authority. Land Transport Authority, Singapore, See
-
SINGAPORE LAND TRANSPORT AUTHORITY. Civil design criteria for road and rail transit systems. Land Transport Authority, Singapore, 2001, See http://www.Ita.gov.sg.
-
(2001)
Civil Design Criteria for Road and Rail Transit Systems
-
-
|