메뉴 건너뛰기




Volumn 129, Issue 6, 2003, Pages 279-285

Modeling dredging project cost variations

Author keywords

Costs; Database; Dredging; Regression models; U.S. Army Corps of Engineers

Indexed keywords

ALGORITHMS; COSTS; DATA TRANSFER; DATABASE SYSTEMS; LINEAR EQUATIONS; MATHEMATICAL MODELS; NEURAL NETWORKS; RADIAL BASIS FUNCTION NETWORKS; REGRESSION ANALYSIS;

EID: 0242551868     PISSN: 0733950X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-950X(2003)129:6(279)     Document Type: Article
Times cited : (3)

References (11)
  • 1
    • 0035044111 scopus 로고    scopus 로고
    • Neural networks in civil engineering
    • Adeli, H. (2001). "Neural networks in civil engineering." Comput. Aided Civ. Infrastruct. Eng., 16(1), 126-142.
    • (2001) Comput. Aided Civ. Infrastruct. Eng. , vol.16 , Issue.1 , pp. 126-142
    • Adeli, H.1
  • 3
    • 0242532698 scopus 로고
    • Neural Connection 1.0 applications guide SPSS and Recognition Systems, Inc., SPSS, Chicago
    • Neural Connection 1.0 applications guide. (1995a). SPSS and Recognition Systems, Inc., SPSS, Chicago.
    • (1995)
  • 4
    • 0242617418 scopus 로고
    • Neural Connection 1.0 user's guide SPSS and Recognition Systems, Inc., SPSS, Chicago, Ill
    • Neural Connection 1.0 user's guide. (1995b). SPSS and Recognition Systems, Inc., SPSS, Chicago, III.
    • (1995)
  • 11
    • 0033314539 scopus 로고    scopus 로고
    • Predicted cost escalations in competitively bid highway projects
    • Williams, T. P., Miles, J. C., and Moore, C. J. (1999). "Predicted cost escalations in competitively bid highway projects." Proc. Inst. Civ. Eng., Transp., 135(4), 195-199.
    • (1999) Proc. Inst. Civ. Eng., Transp. , vol.135 , Issue.4 , pp. 195-199
    • Williams, T.P.1    Miles, J.C.2    Moore, C.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.