메뉴 건너뛰기




Volumn 104, Issue 1-3, 2003, Pages 169-192

Process safety management in the pipeline industry: Parallels and differences between the pipeline integrity management (IMP) rule of the Office of Pipeline Safety and the PSM/RMP approach for process facilities

Author keywords

IMP; Integrity management; Pipelines; Process facilities; Process safety; Process safety management; PSM; Regulations; Risk management; RMP

Indexed keywords

ACCIDENT PREVENTION; HAZARDOUS MATERIALS; LAWS AND LEGISLATION; PROJECT MANAGEMENT; REGULATORY COMPLIANCE; RISK MANAGEMENT;

EID: 0242320545     PISSN: 03043894     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jhazmat.2003.08.008     Document Type: Conference Paper
Times cited : (31)

References (15)
  • 14
    • 0003400442 scopus 로고    scopus 로고
    • EPA 550-B-99-009, United States Environmental Protection. Agency, Washington, DC, April
    • United States Environmental Protection Agency (EPA), Risk Management Program Guidance for Offsite Consequence Analysis (OCAG), EPA 550-B-99-009, United States Environmental Protection Agency, Washington, DC, April 1999.
    • (1999) Risk Management Program Guidance for Offsite Consequence Analysis (OCAG)
  • 15
    • 85030936027 scopus 로고    scopus 로고
    • US Environmental Protection Agency and US Department of Transportation, Office of Pipeline Safety, Dallas and Houston, TX, November
    • URS Corporation, Final Environmental Assessment of the Proposed Longhorn Pipeline System, vol. 2, US Environmental Protection Agency and US Department of Transportation, Office of Pipeline Safety, Dallas and Houston, TX, November 2000. Available through http://www.epa.gov.
    • (2000) Final Environmental Assessment of the Proposed Longhorn Pipeline System , vol.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.