메뉴 건너뛰기




Volumn 150, Issue 5, 2003, Pages 573-582

Risk assessment due to local demand forecast uncertainty in the competitive supply industry

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; CORRELATION METHODS; DATA PROCESSING; ELECTRIC INDUSTRY; ELECTRIC POWER UTILIZATION; MATHEMATICAL MODELS; NEURAL NETWORKS; REGRESSION ANALYSIS; RISK ASSESSMENT;

EID: 0142135086     PISSN: 13502360     EISSN: None     Source Type: Journal    
DOI: 10.1049/ip-gtd:20030641     Document Type: Article
Times cited : (39)

References (18)
  • 1
    • 80052113332 scopus 로고    scopus 로고
    • New electricity trading arrangements (NETA) programme
    • (Ofgem publications, January)
    • 'New Electricity Trading Arrangements (NETA) Programme' (Ofgem publications, January 2001)
    • (2001)
  • 2
    • 0032206591 scopus 로고    scopus 로고
    • Risk due to load forecast uncertainty in short term power system planning
    • Douglas, A.P., Breipohl, A.M., Lee, F.N., and Adapa, R.: 'Risk due to load forecast uncertainty in short term power system planning', IEEE Trans. Power Syst., 1998, 13, (4), pp. 1493-1499
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.4 , pp. 1493-1499
    • Douglas, A.P.1    Breipohl, A.M.2    Lee, F.N.3    Adapa, R.4
  • 3
    • 0034186793 scopus 로고    scopus 로고
    • Influence of temperature and load forecast uncertainty on estimates of power generation production costs
    • Valenzuela, J., Mazumdar, M., and Kapoor, A.: 'Influence of temperature and load forecast uncertainty on estimates of power generation production costs', IEEE Trans. Power Syst., 2000, 15, (2), pp. 668-674
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.2 , pp. 668-674
    • Valenzuela, J.1    Mazumdar, M.2    Kapoor, A.3
  • 4
    • 0035248045 scopus 로고    scopus 로고
    • Neural networks for short-term load forecasting: A review and evaluation
    • Hippert, H.S., Pedreira, C.E., and Souza, R.C.: 'Neural networks for short-term load forecasting: a review and evaluation', IEEE Trans. Power Syst., 2001, 16, (1), pp. 44-55
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.1 , pp. 44-55
    • Hippert, H.S.1    Pedreira, C.E.2    Souza, R.C.3
  • 5
    • 0035425552 scopus 로고    scopus 로고
    • Short-term hourly load forecasting using time-series modeling with peak load estimation capability
    • Amjady, N.: 'Short-term hourly load forecasting using time-series modeling with peak load estimation capability', IEEE Trans. Power Syst., 2001, 16, (3), pp. 498-505
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.3 , pp. 498-505
    • Amjady, N.1
  • 7
    • 0003410292 scopus 로고
    • Time series analysis: Forecasting and control
    • (Prentice Hall, 3rd Edn.)
    • Box, G.E.P., Jenkins, G.M., Reinsel, G.C., and Jenkins, G.: 'Time series analysis: forecasting and control' (Prentice Hall, 1994, 3rd Edn.)
    • (1994)
    • Box, G.E.P.1    Jenkins, G.M.2    Reinsel, G.C.3    Jenkins, G.4
  • 9
    • 0035270514 scopus 로고    scopus 로고
    • Volatility in the California power market: Source, methodology and recommendations
    • Dahlgren, R.W., Liu, C.C., and Lawarree, J.: 'Volatility in the California power market: source, methodology and recommendations', IEE Proc., Gener. Transm. Distrib., 2001, 148, (2), pp. 189-193
    • IEE Proc., Gener. Transm. Distrib., 2001 , vol.148 , Issue.2 , pp. 189-193
    • Dahlgren, R.W.1    Liu, C.C.2    Lawarree, J.3
  • 10
    • 0142131630 scopus 로고    scopus 로고
    • accessed December
    • http://www.bmreports.com/bwx_reporting.htm accessed December 2001
    • (2001)
  • 11
    • 0032205039 scopus 로고    scopus 로고
    • The impacts of temperature forecast uncertainty on Bayesian load forecasting
    • Douglas, A.P., Breiphol, A.M., Lee, F.N., and Adapa, R.: 'The impacts of temperature forecast uncertainty on Bayesian load forecasting', IEEE Trans. Power Syst., 1998, 13, (4), pp. 1507-1513
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.4 , pp. 1507-1513
    • Douglas, A.P.1    Breipohl, A.M.2    Lee, F.N.3    Adapa, R.4
  • 12
    • 0030149443 scopus 로고    scopus 로고
    • An artificial neural network hourly temperature forecaster with applications in load forecasting
    • Khotanzad, A., Davis, M.H., Abaye, A., and Maratukulam, D.J.: 'An artificial neural network hourly temperature forecaster with applications in load forecasting', IEEE Trans. Power Syst., 1996, 11, (2), pp. 870-876
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.2 , pp. 870-876
    • Khotanzad, A.1    Davis, M.H.2    Abaye, A.3    Maratukulam, D.J.4
  • 13
    • 85047678405 scopus 로고    scopus 로고
    • Hybrid adaptive techniques for electric-load forecast using ANN and ARIMA
    • El Desouky, A.A., and Elkateb, M.M.: 'Hybrid adaptive techniques for electric-load forecast using ANN and ARIMA', IEE Proc., Gener. Transm. Distrib., 2000, 147, (4), pp. 213-217
    • IEE Proc., Gener. Transm. Distrib., 2000 , vol.147 , Issue.4 , pp. 213-217
    • El Desouky, A.A.1    Elkateb, M.M.2
  • 14
    • 0034138664 scopus 로고    scopus 로고
    • Very short-term load forecasting using artificial neural networks
    • Charytoniuk, W., and Chen, M.-S.: 'Very short-term load forecasting using artificial neural networks', IEEE Trans. Power Syst., 2000, 15, (1), pp. 263-268
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.1 , pp. 263-268
    • Charytoniuk, W.1    Chen, M.-S.2
  • 15
    • 0013029738 scopus 로고    scopus 로고
    • Market operations in electric power system: Forecasting, scheduling, and risk management
    • (Wiley, New York)
    • Shahidehpour, M., Yamin, H., and Li, Z.: 'Market operations in electric power system: forecasting, scheduling, and risk management' (Wiley, New York, 2002)
    • (2002)
    • Shahidehpour, M.1    Yamin, H.2    Li, Z.3
  • 16
    • 85101445097 scopus 로고
    • Applied regression analysis
    • (Wiley, New York)
    • Draper, N.R., and Smith, H.: 'Applied regression analysis' (Wiley, New York, 1966)
    • (1966)
    • Draper, N.R.1    Smith, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.