메뉴 건너뛰기




Volumn 25, Issue 10, 2003, Pages 797-807

Important issues influencing thermal plant attractiveness in a large hydroelectric generation system

Author keywords

Hydrothermal system dispatch; Natural gas; Site selection studies; Thermal plant

Indexed keywords

DYNAMIC PROGRAMMING; ELECTRIC POWER SYSTEM INTERCONNECTION; NATURAL GAS; OPTIMIZATION; RANDOM PROCESSES; SITE SELECTION;

EID: 0043011883     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0142-0615(03)00058-9     Document Type: Article
Times cited : (6)

References (12)
  • 2
    • 0042676818 scopus 로고    scopus 로고
    • Thermal generating expansion planning system analyze
    • XI BAC, São Paulo; in Portuguese
    • Ramos DS, et al. Thermal generating expansion planning system analyze. In: XI BAC, Brazilian Automatic Congress, São Paulo; 1997 (in Portuguese).
    • (1997) Brazilian Automatic Congress
    • Ramos, D.S.1
  • 6
    • 0042676817 scopus 로고
    • Hydrology series model. Methodologies manual
    • in Portuguese
    • a; 1983 (in Portuguese).
    • (1983) a
  • 7
    • 0021171818 scopus 로고
    • Stochastic dynamic programming models for reservoir operation optimization
    • Stedinger J.R., Sule B.F., Louks D.P. Stochastic dynamic programming models for reservoir operation optimization. Water Resour Res. 20:(11):1994;1499-1505.
    • (1994) Water Resour Res , vol.20 , Issue.11 , pp. 1499-1505
    • Stedinger, J.R.1    Sule, B.F.2    Louks, D.P.3
  • 8
    • 0042676814 scopus 로고    scopus 로고
    • Risks evaluating concerned the natural gas insertion in the new Brazilian power sector regulatory framework
    • Buenos Aires, Argentina; 26-29 November (in Portuguese)
    • Ramos DS, Fadigas E, Lima WS. Risks evaluating concerned the natural gas insertion in the new Brazilian Power Sector Regulatory Framework. CIER Congress 2000, Buenos Aires, Argentina; 26-29 November 2000 (in Portuguese).
    • (2000) CIER Congress 2000
    • Ramos, D.S.1    Fadigas, E.2    Lima, W.S.3
  • 9
    • 0041674927 scopus 로고    scopus 로고
    • Wholesale energy market
    • Access in 08/15/2000
    • ASMAE, Wholesale Energy Market, In: WEM Administration Service. Available in:
    • WEM Administration Service
  • 10
    • 84962243217 scopus 로고    scopus 로고
    • Energy trading under the new regulatory framework of Brazilian electric sector: A methodology for strategy analyses for allocation of production
    • Rio de Janeiro, RJ, Brazil; November (in Portuguese)
    • Ramos DS, Lima WS, Castro R. Energy trading under the new regulatory framework of Brazilian Electric Sector: A methodology for strategy analyses for allocation of production. Proceedings of VIII Energy Brazilian Congress, Rio de Janeiro, RJ, Brazil; November 1999 (in Portuguese).
    • (1999) Proceedings of VIII Energy Brazilian Congress
    • Ramos, D.S.1    Lima, W.S.2    Castro, R.3
  • 11
    • 84962253412 scopus 로고    scopus 로고
    • Site selection and economic risks of thermal power plant projects under the new Brazilian regulatory framework
    • Perth, Australia; 4-7 December
    • Ramos DS, Fadigas E, Lima WS. Site selection and economic risks of thermal power plant projects under the new Brazilian regulatory framework. IEEE PowerCon 2000, Perth, Australia; 4-7 December, 2000.
    • (2000) IEEE PowerCon 2000
    • Ramos, D.S.1    Fadigas, E.2    Lima, W.S.3
  • 12
    • 0042676816 scopus 로고    scopus 로고
    • Comparative analyze between natural gas thermal plant technologies using the decision: Scenarios technique
    • XXXII SBPO, Lavras, MG, Brazil; 18-20 October
    • Ramos DS, Fadigas EAA, Lima WS. Comparative analyze between natural gas thermal plant technologies using the decision: scenarios technique. XXXII SBPO. Operational Research Brazilian Symposium, Lavras, MG, Brazil; 18-20 October, 2000.
    • (2000) Operational Research Brazilian Symposium
    • Ramos, D.S.1    Fadigas, E.A.A.2    Lima, W.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.