메뉴 건너뛰기




Volumn 27, Issue 2-3, 2003, Pages 293-311

Single machine scheduling of unit-time jobs with controllable release dates

Author keywords

Controllable release dates; Deterministic; Multiple criteria; Scheduling; Single machine

Indexed keywords

ALGORITHMS; PARETO PRINCIPLE; SCHEDULING;

EID: 0042929887     PISSN: 09255001     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1024826720369     Document Type: Conference Paper
Times cited : (4)

References (14)
  • 2
    • 0002719862 scopus 로고
    • Scheduling unit processing time jobs on a single machine with multiple criteria
    • Chen, C.L. and Bulfin, R.L. (1990), Scheduling Unit Processing Time Jobs on a Single Machine with Multiple Criteria, Computers and Operations Research 17, 1-7.
    • (1990) Computers and Operations Research , vol.17 , pp. 1-7
    • Chen, C.L.1    Bulfin, R.L.2
  • 3
    • 0028449763 scopus 로고
    • Resource optimal control in single machine scheduling with a completion time constraint
    • Cheng, T.C.E. and Janiak, A. (1994), Resource Optimal Control in Single Machine Scheduling with a Completion Time Constraint, IEEE Transactions on Automatic Control 39, 1243-1246.
    • (1994) IEEE Transactions on Automatic Control , vol.39 , pp. 1243-1246
    • Cheng, T.C.E.1    Janiak, A.2
  • 6
    • 0022805962 scopus 로고
    • Time-optimal control in a single machine problem with resource constraints
    • Janiak, A. (1986), Time-Optimal Control in a Single Machine Problem with Resource Constraints, Automatica 22, 745-747.
    • (1986) Automatica , vol.22 , pp. 745-747
    • Janiak, A.1
  • 7
    • 0026203180 scopus 로고
    • Single machine scheduling problem with a common deadline and resource dependent release dates
    • Janiak, A. (1991), Single Machine Scheduling Problem with a Common Deadline and Resource Dependent Release Dates, European Journal of Operational Research 53, 317-325.
    • (1991) European Journal of Operational Research , vol.53 , pp. 317-325
    • Janiak, A.1
  • 8
    • 0031999371 scopus 로고    scopus 로고
    • Single machine sequencing with linear models of release dates
    • Janiak, A. (1998), Single Machine Sequencing with Linear Models of Release Dates, Naval Research Logistics 45, 99-113.
    • (1998) Naval Research Logistics , vol.45 , pp. 99-113
    • Janiak, A.1
  • 9
    • 0028517621 scopus 로고
    • Scheduling with resource-dependent release dates - A comparison of two different resource consumption functions
    • Li, C.L. (1994), Scheduling with Resource-Dependent Release Dates - a Comparison of Two Different Resource Consumption Functions, Naval Research Logistics 41, 807-819.
    • (1994) Naval Research Logistics , vol.41 , pp. 807-819
    • Li, C.L.1
  • 10
    • 0029204768 scopus 로고
    • Scheduling to minimize resource consumption with a constraint on the sum of completion times
    • Li, C.L. (1995), Scheduling to Minimize Resource Consumption with a Constraint on the Sum of Completion Times, European Journal of Operational Research 80, 381-388.
    • (1995) European Journal of Operational Research , vol.80 , pp. 381-388
    • Li, C.L.1
  • 11
    • 38249019311 scopus 로고
    • A survey of results for sequencing problems with controllable processing times
    • Nowicki, E. and Zdrzalka, S. (1990), A Survey of Results for Sequencing Problems with Controllable Processing Times, Discrete Applied Mathematics 26, 271-287.
    • (1990) Discrete Applied Mathematics , vol.26 , pp. 271-287
    • Nowicki, E.1    Zdrzalka, S.2
  • 12
    • 0000976158 scopus 로고
    • A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times
    • Nowicki, E. and Zdrzalka, S. (1995), A Bicriterion Approach to Preemptive Scheduling of Parallel Machines with Controllable Job Processing Times, Discrete Applied Mathematics 63, 237-256.
    • (1995) Discrete Applied Mathematics , vol.63 , pp. 237-256
    • Nowicki, E.1    Zdrzalka, S.2
  • 13


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.