-
1
-
-
0004007948
-
-
PhD Dissertation, University of Michigan, Ann Arbor, MI
-
J.C. Martinez, STROBOSCOPE: state and resource based simulation of construction processes, PhD Dissertation, University of Michigan, Ann Arbor, MI, 1996.
-
(1996)
STROBOSCOPE: State and Resource Based Simulation of Construction Processes
-
-
Martinez, J.C.1
-
2
-
-
0032254777
-
Simulating haul durations for linear scheduling
-
D.J. Medeiros, E.F. Watson, J.S. Carson, & M.S. Manivannan
-
Harmelink D., Bernal M. Simulating haul durations for linear scheduling. Medeiros D.J., Watson E.F., Carson J.S., Manivannan M.S. Proceedings of the 1998 Winter Simulation Conference. 1998.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
-
-
Harmelink, D.1
Bernal, M.2
-
4
-
-
0033351011
-
Construction of a dam embankment with nonstationary queues
-
Phoenix, Arizona, December 5-8
-
Ioannou P.G. Construction of a dam embankment with nonstationary queues. Proceedings of the Winter Simulation Conference 99, Phoenix, Arizona, December 5-8:1999.
-
(1999)
Proceedings of the Winter Simulation Conference 99
-
-
Ioannou, P.G.1
-
5
-
-
0029544295
-
Simulating construction operations of precast-concrete parking structures
-
San Diego, CA: Society for Computer Simulation
-
Liu L.Y. Simulating construction operations of precast-concrete parking structures. Proceedings of the 1995 Winter Simulation Conference. 1995;1004-1008 Society for Computer Simulation, San Diego, CA.
-
(1995)
Proceedings of the 1995 Winter Simulation Conference
, pp. 1004-1008
-
-
Liu, L.Y.1
-
8
-
-
0043276264
-
Discrete-event simulation of a pull-driven materials-handling process that requires resource matching: Example of pipe-spool installation
-
Construction, Engineering and Management, Civil and Environmental Engineering Department, UC Berkeley, Berkeley, CA
-
I.D. Tommelein, Discrete-event simulation of a pull-driven materials-handling process that requires resource matching: example of pipe-spool installation, Technical Report 97-2, Construction, Engineering and Management, Civil and Environmental Engineering Department, UC Berkeley, Berkeley, CA, 1997.
-
(1997)
Technical Report
, vol.97
, Issue.2
-
-
Tommelein, I.D.1
-
9
-
-
83155169240
-
Models of lean construction processes: Example of pipe-spool materials management
-
New York, NY: ASCE
-
Tommelein I.D. Models of lean construction processes: example of pipe-spool materials management. Proceedings of the Construction Congress. vol. V:1997;ASCE, New York, NY.
-
(1997)
Proceedings of the Construction Congress
, vol.5
-
-
Tommelein, I.D.1
-
11
-
-
0035278717
-
Simulation of concrete batch plant production
-
March-April
-
Zayed T., Halpin D. Simulation of concrete batch plant production. J. Constr. Eng. Manage. 2001 (March-April);132-140.
-
(2001)
J. Constr. Eng. Manage.
, pp. 132-140
-
-
Zayed, T.1
Halpin, D.2
-
12
-
-
0042273814
-
EarthMover - Simulation tool for earthwork planning
-
Stockholm, Sweden: Department of Construction Management and Economics, Royal Institute of Technology
-
Martinez J.C. EarthMover - simulation tool for earthwork planning. Proceedings of the 1998 CIB W78 Conference:1998;Department of Construction Management and Economics, Royal Institute of Technology, Stockholm, Sweden.
-
(1998)
Proceedings of the 1998 CIB W78 Conference
-
-
Martinez, J.C.1
-
13
-
-
0032278075
-
Modeling and simulation of public housing construction in Hong Kong
-
D.J. Medeiros, E.F. Watson, J.S. Carson, & M.S. Manivannan
-
Shi J., Zeng S., Tam C. Modeling and simulation of public housing construction in Hong Kong. Medeiros D.J., Watson E.F., Carson J.S., Manivannan M.S. Proceedings of the 1998 Winter Simulation Conference. 1998.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
-
-
Shi, J.1
Zeng, S.2
Tam, C.3
-
14
-
-
0028750455
-
Simulation of cable stayed bridges using DISCO
-
Orlando, FL, December 11-14
-
Huang R.Y., Grigoriadis A., Halpin D.W. Simulation of cable stayed bridges using DISCO. Proceedings of the Winter Simulation Conference '94, Orlando, FL, December 11-14, 1994. 1994;1130-1136.
-
(1994)
Proceedings of the Winter Simulation Conference '94
, pp. 1130-1136
-
-
Huang, R.Y.1
Grigoriadis, A.2
Halpin, D.W.3
-
15
-
-
0029333510
-
Process simulation for guide wall construction using mobile cofferdams
-
A.L. Naresh, C.T. Jahren, Process simulation for guide wall construction using mobile cofferdams, Transportation Research Record 1511.
-
Transportation Research Record
, vol.1511
-
-
Naresh, A.L.1
Jahren, C.T.2
-
17
-
-
0041772919
-
-
Center for Transportation Research and Education, Iowa State University (September)
-
Maze T., Kamyab A. Work zone simulation model. Center for Transportation Research and Education. 1999 (September);Iowa State University.
-
(1999)
Work Zone Simulation Model
-
-
Maze, T.1
Kamyab, A.2
-
19
-
-
0033226098
-
Comparison of car - Following models for simulation
-
Washington, DC: TRB, National Research Council
-
Aycin M.F., Benekohal R.F. Comparison of car - following models for simulation. Transportation Research Record. vol. 1678:1999;116-127 TRB, National Research Council, Washington, DC.
-
(1999)
Transportation Research Record
, vol.1678
, pp. 116-127
-
-
Aycin, M.F.1
Benekohal, R.F.2
-
20
-
-
0022925885
-
A model for the structure of lane-changing decisions
-
Gipps P.G. A model for the structure of lane-changing decisions. Transp. Res., Part B: Methodol. 5:1986;403-414.
-
(1986)
Transp. Res., Part B: Methodol.
, vol.5
, pp. 403-414
-
-
Gipps, P.G.1
-
22
-
-
0041772930
-
-
Boise, ID: Local Highway Technical Assistance Council (January)
-
Local Highway Technical Assistance Council (LHTAC) Manual for Equipment Rental Rates. 2nd ed. 2001 (January);Local Highway Technical Assistance Council, Boise, ID.
-
(2001)
Manual for Equipment Rental Rates, 2nd Ed.
-
-
|