메뉴 건너뛰기




Volumn 4756, Issue , 2002, Pages 274-279

Assembly sequence planning and assembling simulation of stamping die tools

Author keywords

Assembly Model; Planning; Simulation; Subassembly partition

Indexed keywords

COMPUTER AIDED DESIGN; COMPUTER AIDED MANUFACTURING; COMPUTER SIMULATION; PRODUCT DESIGN; STAMPING;

EID: 0042731784     PISSN: 0277786X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1117/12.498001     Document Type: Conference Paper
Times cited : (3)

References (5)
  • 3
    • 0033131777 scopus 로고    scopus 로고
    • A move-to-contact facility for modeling mechanical assembly and simulation
    • J.D. Xu, A move-to-contact facility for modeling mechanical assembly and simulation, International Journal of Machine Tools & Manufacture, 39 (1999) 683-704
    • (1999) International Journal of Machine Tools & Manufacture , vol.39 , pp. 683-704
    • Xu, J.D.1
  • 4
    • 0035485303 scopus 로고    scopus 로고
    • Automatic decomposition of planned assembly sequences into skill primitives
    • Oct
    • Mosemann, H., Wahl, F.M., Automatic decomposition of planned assembly sequences into skill primitives, Robotics and Automation, IEEE Transactions on, Vol.17, Issue: 5, Oct 2001, Page(s): 709-718
    • (2001) Robotics and Automation, IEEE Transactions on , vol.17 , Issue.5 , pp. 709-718
    • Mosemann, H.1    Wahl, F.M.2
  • 5
    • 0033365236 scopus 로고    scopus 로고
    • Information models to support the interaction between design for assembly and assembly process planning
    • Assembly and Task Planning, 1999
    • Dorador, J.M.; Young, R.I.M., Information models to support the interaction between design for assembly and assembly process planning, Assembly and Task Planning, 1999.(ISATP '99) Proceedings of the 1999 IEEE International Symposium on, 1999 Page(s): 39-44
    • (1999) (ISATP '99) Proceedings of the 1999 IEEE International Symposium on , pp. 39-44
    • Dorador, J.M.1    Young, R.I.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.