메뉴 건너뛰기




Volumn 33, Issue 2, 2003, Pages 186-192

Integrating simulation and optimization of manufacturing systems

Author keywords

Decision making; Modeling; Optimization; Simulation

Indexed keywords

COMPUTER SIMULATION; DECISION MAKING; DISCRETE TIME CONTROL SYSTEMS; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0042672933     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2003.914037     Document Type: Article
Times cited : (15)

References (23)
  • 4
    • 0042846713 scopus 로고
    • Object oriented rule based manufacturing enterprise simulation
    • H. Atabakhsh and A. W. Chan, "Object oriented rule based manufacturing enterprise simulation," in Proc. Object Oriented Simulation Conf., vol. 26, 1994, pp. 9-14.
    • (1994) Proc. Object Oriented Simulation Conf. , vol.26 , pp. 9-14
    • Atabakhsh, H.1    Chan, A.W.2
  • 5
    • 0027192588 scopus 로고
    • Intelligent manufacturing simulation agents tool (IMSAT)
    • G. Nadoli and J. Biegel, "Intelligent manufacturing simulation agents tool (IMSAT)," ACM Tran. Model. Comput. Simulat., vol. 3, no. 1, pp. 42-65, 1993.
    • (1993) ACM Tran. Model. Comput. Simulat. , vol.3 , Issue.1 , pp. 42-65
    • Nadoli, G.1    Biegel, J.2
  • 8
    • 0042633797 scopus 로고    scopus 로고
    • An architecture of a multi-model system for planning and scheduling
    • A. Artiba and E. H. Aghezzaf, "An architecture of a multi-model system for planning and scheduling," Int. J. Comput. Integr. Manufact., vol. 10, no. 5, pp. 380-393, 1997.
    • (1997) Int. J. Comput. Integr. Manufact. , vol.10 , Issue.5 , pp. 380-393
    • Artiba, A.1    Aghezzaf, E.H.2
  • 12
    • 4243326517 scopus 로고
    • Problèmes d'ordonnancement, modélization, complexité, algorithmes
    • Masson, France; ISBN: 2-225-81 275-6
    • J. Carlier and P. Chrétienne, Problèmes d'ordonnancement, modélization, complexité, algorithmes Masson, France, 1988, ISBN: 2-225-81 275-6.
    • (1988)
    • Carlier, J.1    Chrétienne, P.2
  • 20
    • 0020500356 scopus 로고
    • Due date selection procedures for job-shop simulation
    • M. L. Smith and A. Seidmann, "Due date selection procedures for job-shop simulation," Comput. Ind. Eng., vol. 7, no. 3, pp. 199-207, 1983.
    • (1983) Comput. Ind. Eng. , vol.7 , Issue.3 , pp. 199-207
    • Smith, M.L.1    Seidmann, A.2
  • 21
    • 0029344295 scopus 로고
    • A comparative study of some priority dispatching rules under different shop loads
    • A. M. Waikar, B. R. Sarker, and A. M. Lal, "A comparative study of some priority dispatching rules under different shop loads," Prod. Planning Contr., vol. 6, pp. 301-310, 1995.
    • (1995) Prod. Planning Contr. , vol.6 , pp. 301-310
    • Waikar, A.M.1    Sarker, B.R.2    Lal, A.M.3
  • 22
    • 0042345692 scopus 로고    scopus 로고
    • Production control of a flexible manufacturing system in a job shop environment
    • K.-W. Hansmann and M. Hoeck, "Production control of a flexible manufacturing system in a job shop environment," Int. Trans. Oper. Res., vol. 4, no. 5/6, pp. 341-351, 1997.
    • (1997) Int. Trans. Oper. Res. , vol.4 , Issue.5-6 , pp. 341-351
    • Hansmann, K.-W.1    Hoeck, M.2
  • 23
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • A. Jain and S. Meeran, "Deterministic job-shop scheduling: Past, present and future," Eur. J. Oper. Res., vol. 113, pp. 390-434, 1999.
    • (1999) Eur. J. Oper. Res. , vol.113 , pp. 390-434
    • Jain, A.1    Meeran, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.