Volumn 21, Issue 1, 1997, Pages 39-42

Polynomial algorithms for single machine scheduling problems with financial constraints

Author keywords

Financial constraints; Polynomial algorithms; Single machine scheduling

Indexed keywords


EID: 0041731457     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0167-6377(97)00007-2     Document Type: Article
Times cited : (25)

References (5)
  • 1
    • 0041525865 scopus 로고
    • Complexité des problèmes d'ordonnancement à constraintes de financement
    • P. Hansen, D. de Werra (eds.), Presses Polytechniques Romandes, Lausanne
    • J. Carlier, "Complexité des problèmes d'ordonnancement à constraintes de financement", in: P. Hansen, D. de Werra (eds.), Regards sur la Théorie des Graphes, Presses Polytechniques Romandes, Lausanne, 1980, pp. 183-186.
    • (1980) Regards sur la Théorie des Graphes , pp. 183-186
    • Carlier, J.1
  • 2
    • 0020116654 scopus 로고
    • Scheduling subject to nonrenewable-resource constraints
    • J. Carlier and A.H.G. Rinnooy Kan, "Scheduling subject to nonrenewable-resource constraints", Oper. Res. Lett. 1, 52-55 (1982).
    • (1982) Oper. Res. Lett. , vol.1 , pp. 52-55
    • Carlier, J.1    Rinnooy Kan, A.H.G.2
  • 3
    • 0003075019 scopus 로고
    • Optimal two and three stage production schedules with setup time included
    • S.M. Johnson, "Optimal two and three stage production schedules with setup time included", Naval Res. Logist. Quart. 1, 61-68 (1954).
    • (1954) Naval Res. Logist. Quart. , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 4
    • 0021388078 scopus 로고
    • Preemptive scheduling of independence jobs on parallel machine subject to financial constraints
    • R. Slowinski, "Preemptive scheduling of independence jobs on parallel machine subject to financial constraints", European J. Oper. Res. 15, 366-373 (1984).
    • (1984) European J. Oper. Res. , vol.15 , pp. 366-373
    • Slowinski, R.1
  • 5
    • 0026223172 scopus 로고
    • Scheduling under a non-renewable resource constraint
    • A. Toker, S. Kondakci and N. Erkip, "Scheduling under a non-renewable resource constraint", J. Oper. Res. Soc. 42, 811-814 (1991).
    • (1991) J. Oper. Res. Soc. , vol.42 , pp. 811-814
    • Toker, A.1    Kondakci, S.2    Erkip, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.