메뉴 건너뛰기




Volumn 33, Issue 2, 2003, Pages 168-175

Finite automata decomposition for flexible manufacturing systems control and scheduling

Author keywords

Finite automata decomposition; Finite automata modeling; FMS scheduling; IDEF3 standard

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; FINITE AUTOMATA; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING;

EID: 0041671085     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2003.813149     Document Type: Article
Times cited : (16)

References (19)
  • 1
    • 0029309888 scopus 로고
    • Resource constrained scheduling of hierarchically structured design activity networks
    • May
    • U. Belhe and A. Kusiak, "Resource constrained scheduling of hierarchically structured design activity networks," IEEE Trans. Eng. Manag., vol. 42, pp. 150-158, May 1995.
    • (1995) IEEE Trans. Eng. Manag. , vol.42 , pp. 150-158
    • Belhe, U.1    Kusiak, A.2
  • 2
    • 0011717262 scopus 로고
    • IDEF0 to Petri-net transformation with multiple routing
    • Ind. Eng. Dept., Rutgers Univ., New Brunswick, NJ, Working paper 90
    • T.O. Boucher and M.A. Jaffari, "IDEF0 to Petri-net transformation with multiple routing," Ind. Eng. Dept., Rutgers Univ., New Brunswick, NJ, Working paper 90, 1990.
    • (1990)
    • Boucher, T.O.1    Jaffari, M.A.2
  • 3
    • 0000165767 scopus 로고
    • An algorithm for solving the job shop problem
    • Feb.
    • J. Carlier, "An algorithm for solving the job shop problem," Manage. Sci., vol. 35, pp. 164-176, Feb. 1989.
    • (1989) Manage. Sci. , vol.35 , pp. 164-176
    • Carlier, J.1
  • 5
    • 0015361193 scopus 로고
    • An algorithm for project (job) scheduling with resource constraints
    • July
    • S. Gorenstein, "An algorithm for project (job) scheduling with resource constraints," Oper. Res., vol. 20, no. 4, pp. 835-850, July 1990.
    • (1990) Oper. Res. , vol.20 , Issue.4 , pp. 835-850
    • Gorenstein, S.1
  • 6
    • 0034655052 scopus 로고    scopus 로고
    • Decomposition in automatic generation of Petri nets for manufacturing system control and scheduling
    • June
    • D. He, B. Strege, H. Tolle, and A. Kusiak, "Decomposition in automatic generation of Petri nets for manufacturing system control and scheduling," Int. J. Prod. Res., vol. 38, no. 6, pp. 1437-1457, June 2000.
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.6 , pp. 1437-1457
    • He, D.1    Strege, B.2    Tolle, H.3    Kusiak, A.4
  • 7
    • 0023362513 scopus 로고
    • Project scheduling with resource constraints: A branch and bound approach
    • N. Hristofides et al., "Project scheduling with resource constraints: A branch and bound approach," J. Oper. Res., Eur., vol. 29, no. 3, pp. 262-273, 1987.
    • (1987) J. Oper. Res., Eur. , vol.29 , Issue.3 , pp. 262-273
    • Hristofides, N.1
  • 9
    • 0037201140 scopus 로고    scopus 로고
    • Pareto optimality approach for FJSP: Hybridization of evolutionary algorithm and fuzzy logic
    • Sept.
    • I. Kacem, S. Hammadi, and P. Bonne, "Pareto optimality approach for FJSP: Hybridization of evolutionary algorithm and fuzzy logic," Math. Comput. Simul., vol. 60, no. 3-5, pp. 245-276, Sept. 2002.
    • (2002) Math. Comput. Simul. , vol.60 , Issue.3-5 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Bonne, P.3
  • 11
    • 0004083930 scopus 로고
    • Information integration for concurrent engineering (IICE) IDEF3 process description capture method report
    • Armstrong Laboratory, Wright-Patterson AFB, OH, Rep. AL-TR-1992-0057
    • R.J. Mayer, T.P.P.S. Cullinane, W.B. Knappenberger, B. Perakath and M.S. Wells, "Information integration for concurrent engineering (IICE) IDEF3 process description capture method report," Armstrong Laboratory, Wright-Patterson AFB, OH, Rep. AL-TR-1992-0057, 1992.
    • (1992)
    • Mayer, R.J.1    Cullinane, T.P.P.S.2    Knappenberger, W.B.3    Perakath, B.4    Wells, M.S.5
  • 12
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
    • Aug.
    • S. Parker, N. Raman, and M.J. Shaw, "Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach," IEEE Trans. Robot. Automat., vol. 13, pp. 486-502, Aug. 1997.
    • (1997) IEEE Trans. Robot. Automat. , vol.13 , pp. 486-502
    • Parker, S.1    Raman, N.2    Shaw, M.J.3
  • 17
    • 2342576643 scopus 로고
    • Integrated computer aided manufacturing (ICAM) architecture part II, volume IV - Functional modeling manual (IDEF0)
    • US Air Force; Air Force Materials Lab., Wright-Patterson AFB, OH, Rep. AFWAL-tr-81-81-4023
    • US Air Force, "Integrated computer aided manufacturing (ICAM) architecture Part II, Volume IV - Functional modeling manual (IDEF0)," Air Force Materials Lab., Wright-Patterson AFB, OH, Rep. AFWAL-tr-81-81-4023, 1981.
    • (1981)
  • 18
    • 0026204001 scopus 로고
    • Parallel and sequential mutual exclusions for Petri-net modeling for manufacturing system with shared resources
    • Aug.
    • M.C. Zhou and F. Dicesare, "Parallel and sequential mutual exclusions for Petri-net modeling for manufacturing system with shared resources," IEEE Trans. Robot. Automat., vol.7, pp. 515-527, Aug. 1991.
    • (1991) IEEE Trans. Robot. Automat. , vol.7 , pp. 515-527
    • Zhou, M.C.1    Dicesare, F.2
  • 19
    • 0026882077 scopus 로고
    • A hybrid methodology for synthesis of Petri net models for, manufacturing system
    • June
    • ____, "A hybrid methodology for synthesis of Petri net models for, manufacturing system," IEEE Trans. Robot. Automat., vol. 8, pp. 350-361, June 1992.
    • (1992) IEEE Trans. Robot. Automat. , vol.8 , pp. 350-361
    • Zhou, M.C.1    Dicesare, F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.