메뉴 건너뛰기




Volumn 26, Issue 4, 1996, Pages 69-77

The variance paradox and its implications for Japanese production theory

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0040522829     PISSN: 00922102     EISSN: None     Source Type: Journal    
DOI: 10.1287/inte.26.4.69     Document Type: Article
Times cited : (7)

References (21)
  • 1
    • 0020844133 scopus 로고
    • System response time, operator productivity, and job satisfaction
    • Barber, R. A. and Lucas, H. C., Jr. 1983, "System response time, operator productivity, and job satisfaction," Communications of the ACM, Vol. 26, No. 11 (November), pp. 972-986.
    • (1983) Communications of the ACM , vol.26 , Issue.11 NOVEMBER , pp. 972-986
    • Barber, R.A.1    Lucas H.C., Jr.2
  • 2
    • 0026117415 scopus 로고
    • Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
    • Bozer, Y. A. and Srinivasan, M. M. 1991, "Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops," IIE Transactions, Vol. 23, No. 1, pp. 72-82.
    • (1991) IIE Transactions , vol.23 , Issue.1 , pp. 72-82
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 3
    • 0014753142 scopus 로고
    • Queues served in cyclic order: Waiting times
    • Cooper, R. B. 1970, "Queues served in cyclic order: Waiting times," The Bell System Technical Journal, Vol. 49, No. 3 (March), pp. 399-413.
    • (1970) The Bell System Technical Journal , vol.49 , Issue.3 MARCH , pp. 399-413
    • Cooper, R.B.1
  • 4
    • 0000940134 scopus 로고
    • Queues served in cyclic order
    • Cooper, R. B. and Murray, G. 1969, "Queues served in cyclic order," The Bell System Technical Journal, Vol. 48, No. 3 (March), pp. 675-689.
    • (1969) The Bell System Technical Journal , vol.48 , Issue.3 MARCH , pp. 675-689
    • Cooper, R.B.1    Murray, G.2
  • 5
    • 0005401728 scopus 로고
    • The limitations of sub-optimal policies
    • Duenyas, I. 1994, "The limitations of sub-optimal policies," Interfaces, Vol. 24, No. 5 (September-October), pp. 77-84.
    • (1994) Interfaces , vol.24 , Issue.5 SEPTEMBER-OCTOBER , pp. 77-84
    • Duenyas, I.1
  • 6
    • 0005442889 scopus 로고
    • working paper, Department of Industrial and Operations Engineering, The University of Michigan, Ann Arbor, Michigan
    • Duenyas, I. and Van Oyen, M. P. 1995, "Can setup reduction result in worse performance?" working paper, Department of Industrial and Operations Engineering, The University of Michigan, Ann Arbor, Michigan.
    • (1995) Can Setup Reduction Result in Worse Performance?
    • Duenyas, I.1    Van Oyen, M.P.2
  • 7
    • 21844516424 scopus 로고
    • The polling system with a stopping server
    • Eisenberg, M. 1994, "The polling system with a stopping server," Queuing Systems, Vol. 18, No. 3-4 (November), pp. 387-431.
    • (1994) Queuing Systems , vol.18 , Issue.3-4 NOVEMBER , pp. 387-431
    • Eisenberg, M.1
  • 8
    • 0005436482 scopus 로고
    • The cheaper/ faster-yet-more-expensive phenomenon: Are Zangwill's 'paradoxes' indeed paradoxical?
    • Gerchak, Y. and Zhang, Z. 1994, "The cheaper/ faster-yet-more-expensive phenomenon: Are Zangwill's 'paradoxes' indeed paradoxical?" Interfaces, Vol. 24, No. 5 (September-October), pp. 84-87.
    • (1994) Interfaces , vol.24 , Issue.5 SEPTEMBER-OCTOBER , pp. 84-87
    • Gerchak, Y.1    Zhang, Z.2
  • 9
    • 85033747298 scopus 로고    scopus 로고
    • Polling systems with state-dependent setup times
    • forthcoming
    • Gupta, D. and Srinivasan, M. M. forthcoming, "Polling systems with state-dependent setup times," Queueing Systems.
    • Queueing Systems
    • Gupta, D.1    Srinivasan, M.M.2
  • 10
    • 0003072308 scopus 로고
    • On optimal polling policies
    • Liu, Z.; Nain, P.; and Towsley, D. 1992, "On optimal polling policies," Queuing Systems, Vol. 11, No. 1-2 (July), pp. 59-83.
    • (1992) Queuing Systems , vol.11 , Issue.1-2 JULY , pp. 59-83
    • Liu, Z.1    Nain, P.2    Towsley, D.3
  • 11
    • 0040821706 scopus 로고
    • A comment on Zangwill's "the limits of Japanese production theory"
    • McIntyre, B. 1994, "A comment on Zangwill's "The limits of Japanese production theory," Interfaces, Vol. 24, No. 5 (September-October), pp. 87-89.
    • (1994) Interfaces , vol.24 , Issue.5 SEPTEMBER-OCTOBER , pp. 87-89
    • McIntyre, B.1
  • 14
    • 0029333477 scopus 로고
    • Effects of setup and processing time reductions on WIP in the JIT production systems
    • Samaddar, S. and Kaul, T. 1995, "Effects of setup and processing time reductions on WIP in the JIT production systems," Management Science, Vol. 41, No. 7 (July), pp. 1263-1265.
    • (1995) Management Science , vol.41 , Issue.7 JULY , pp. 1263-1265
    • Samaddar, S.1    Kaul, T.2
  • 15
    • 0000693149 scopus 로고
    • Variance effects in cyclic production systems
    • Sarkar, D. and Zangwill, W. I. 1991, "Variance effects in cyclic production systems," Management Science, Vol. 37, No. 4 (April), pp. 444-453.
    • (1991) Management Science , vol.37 , Issue.4 APRIL , pp. 444-453
    • Sarkar, D.1    Zangwill, W.I.2
  • 16
    • 21844505368 scopus 로고
    • Relating polling models with nonzero and zero switchover times
    • Srinivasan, M. M.; Niu, S. C.; and Cooper, R. B. 1995, "Relating polling models with nonzero and zero switchover times," Queuing Systems, Vol. 19, No. 1-2, pp. 149-168.
    • (1995) Queuing Systems , vol.19 , Issue.1-2 , pp. 149-168
    • Srinivasan, M.M.1    Niu, S.C.2    Cooper, R.B.3
  • 17
    • 0005489956 scopus 로고    scopus 로고
    • When should a roving server be patient?
    • Srinivasan, M. M. and Gupta, D. 1996, "When should a roving server be patient?" Management Science, Vol. 42, No. 3, pp. 437-451.
    • (1996) Management Science , vol.42 , Issue.3 , pp. 437-451
    • Srinivasan, M.M.1    Gupta, D.2
  • 18
    • 0002912162 scopus 로고
    • Queuing analysis of polling models: An update
    • ed. H. Takagi, Elsevier Science Inc., North Holland, New York
    • Takagi, H. 1990, "Queuing analysis of polling models: An update," Stochastic Analysis of Computer and Communication Systems, ed. H. Takagi, Elsevier Science Inc., North Holland, New York, pp. 267-318.
    • (1990) Stochastic Analysis of Computer and Communication Systems , pp. 267-318
    • Takagi, H.1
  • 19
    • 85033736970 scopus 로고
    • technical report 92-60, Department of Industrial Engineering, The University of Michigan, Ann Arbor, Michigan
    • Van Oyen, M. P. and Duenyas, I. 1992, "Control of a queuing system with sequence dependent set-ups," technical report 92-60, Department of Industrial Engineering, The University of Michigan, Ann Arbor, Michigan.
    • (1992) Control of a Queuing System with Sequence Dependent Set-ups
    • Van Oyen, M.P.1    Duenyas, I.2
  • 20
    • 21144484288 scopus 로고
    • The limits of Japanese production theory
    • Zangwill, W. I. 1992, "The limits of Japanese production theory," Interfaces, Vol. 22, No. 5 (September-October), pp. 14-25.
    • (1992) Interfaces , vol.22 , Issue.5 SEPTEMBER-OCTOBER , pp. 14-25
    • Zangwill, W.I.1
  • 21
    • 0039635095 scopus 로고
    • Response to comments on our work by Duenyas, by Gerchak and Zhang, and by McIntyre
    • Zangwill, W. I. and Sarkar, D. 1994, "Response to comments on our work by Duenyas, by Gerchak and Zhang, and by McIntyre," Interfaces, Vol. 24, No. 5 (September-October), pp. 90-94.
    • (1994) Interfaces , vol.24 , Issue.5 SEPTEMBER-OCTOBER , pp. 90-94
    • Zangwill, W.I.1    Sarkar, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.