1
-
-
0021384670
-
Critical ratio scheduling: Dynamic due-date procedures under demand uncertainty
-
Berry W. L., Penlesky, R. J., & Vollmann, T. E. (1984). Critical ratio scheduling: Dynamic due-date procedures under demand uncertainty. IIE Transactions, 16(1), 81-89.
-
(1984)
IIE Transactions
, vol.16
, Issue.1
, pp. 81-89
-
-
Berry W, L.1
Penlesky, R.J.2
Vollmann, T.E.3
-
2
-
-
0016564279
-
Critical ratio scheduling: An experimental analysis
-
Berry, W. L., & Rao, V. (1975). Critical ratio scheduling: An experimental analysis. Management Science, 22(2), 192-201.
-
(1975)
Management Science
, vol.22
, Issue.2
, pp. 192-201
-
-
Berry, W.L.1
Rao, V.2
-
3
-
-
84952189229
-
Heuristic lot-sizing and sequencing rules in a multi-stage production-inventory system
-
Biggs, J. R. (1979). Heuristic lot-sizing and sequencing rules in a multi-stage production-inventory system. Decision Sciences, 10(1), 96-115.
-
(1979)
Decision Sciences
, vol.10
, Issue.1
, pp. 96-115
-
-
Biggs, J.R.1
-
4
-
-
0022693736
-
A comparison of strategies to dampen nervousness in MRP systems
-
Blackburn, J. D, Kropp, D. H., & Millen, R. A. (1986). A comparison of strategies to dampen nervousness in MRP systems. Management Science, 32(4), 413-429.
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 413-429
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
5
-
-
0018507737
-
Less nervous MRP systems: A dynamic economic lot-sizing approach
-
Carlson, R. C., Jucker, J. V., & Kropp, D. H. (1979). Less nervous MRP systems: A dynamic economic lot-sizing approach. Management Science, 25(8), 754-761.
-
(1979)
Management Science
, vol.25
, Issue.8
, pp. 754-761
-
-
Carlson, R.C.1
Jucker, J.V.2
Kropp, D.H.3
-
6
-
-
0027615222
-
The effects of lot sizing and dispatching on customer service in an MRP environment
-
Gardiner S. C., & Blackstone, J. H., Jr. (1993). The effects of lot sizing and dispatching on customer service in an MRP environment. Journal of Operations Management, 11(2), 143-161.
-
(1993)
Journal of Operations Management
, vol.11
, Issue.2
, pp. 143-161
-
-
Gardiner S, C.1
Blackstone J.H., Jr.2
-
7
-
-
0020204870
-
Priority scheduling rules for repairable inventory systems
-
Hausman, W. H., & Scudder, G. D. (1982). Priority scheduling rules for repairable inventory systems. Management Science, 28(11), 1215-1232.
-
(1982)
Management Science
, vol.28
, Issue.11
, pp. 1215-1232
-
-
Hausman, W.H.1
Scudder, G.D.2
-
8
-
-
84985801774
-
Repetitive lots: Flow time reductions through sequencing and dynamic batch sizing
-
Jacobs, F. R., & Bragg, D. J. (1988). Repetitive lots: Flow time reductions through sequencing and dynamic batch sizing. Decision Sciences, 19(2), 281-294.
-
(1988)
Decision Sciences
, vol.19
, Issue.2
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
9
-
-
84985788242
-
A comparison of reorder point and material requirement planning inventory control logic
-
Jacobs, F. R., & Whybark, D. C. (1992). A comparison of reorder point and material requirement planning inventory control logic. Decision Sciences, 23(2) 332-342.
-
(1992)
Decision Sciences
, vol.23
, Issue.2
, pp. 332-342
-
-
Jacobs, F.R.1
Whybark, D.C.2
-
10
-
-
0029389855
-
Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
-
Kadipasaoglu, S. N., & Sridharan, V. (1995). Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. Journal of Operations Management, 13(2), 193-211.
-
(1995)
Journal of Operations Management
, vol.13
, Issue.2
, pp. 193-211
-
-
Kadipasaoglu, S.N.1
Sridharan, V.2
-
11
-
-
0030514060
-
Master production rescheduling policy in capacity-constrained just-in-time make-to-stock environments
-
Kern, G. M., & Wei, J. C. (1996). Master production rescheduling policy in capacity-constrained just-in-time make-to-stock environments. Decision Sciences, 27(2), 365-387.
-
(1996)
Decision Sciences
, vol.27
, Issue.2
, pp. 365-387
-
-
Kern, G.M.1
Wei, J.C.2
-
12
-
-
0023167521
-
Kanban, MRP and shaping the manufacturing environment
-
Krajewski, L. J., King, B. E., Ritzman, L. P., & Wong, D. S. (1987). Kanban, MRP and shaping the manufacturing environment. Management Science, 33(1), 39-57.
-
(1987)
Management Science
, vol.33
, Issue.1
, pp. 39-57
-
-
Krajewski, L.J.1
King, B.E.2
Ritzman, L.P.3
Wong, D.S.4
-
13
-
-
0021373333
-
A lot-sizing algorithm for reducing nervousness in MRP systems
-
Kropp, D. H., & Carlson, R. C. (1984). A lot-sizing algorithm for reducing nervousness in MRP systems. Management Science, 30(2), 240-244.
-
(1984)
Management Science
, vol.30
, Issue.2
, pp. 240-244
-
-
Kropp, D.H.1
Carlson, R.C.2
-
14
-
-
84989427471
-
Heuristic lot-sizing approaches for dealing with MRP system nervousness
-
Kropp, D. H., Carlson, R. C., & Jucker, J. V. (1983). Heuristic lot-sizing approaches for dealing with MRP system nervousness. Decision Sciences, 14(2), 156-169.
-
(1983)
Decision Sciences
, vol.14
, Issue.2
, pp. 156-169
-
-
Kropp, D.H.1
Carlson, R.C.2
Jucker, J.V.3
-
16
-
-
84985848296
-
A model for master production scheduling in uncertain environments
-
Lin, N. P., & Krajewski, L. (1992). A model for master production scheduling in uncertain environments. Decision Sciences, 23(4), 839-861.
-
(1992)
Decision Sciences
, vol.23
, Issue.4
, pp. 839-861
-
-
Lin, N.P.1
Krajewski, L.2
-
17
-
-
0028401193
-
The effects of environmental factors on the design of master production scheduling systems
-
Lin, N. P., Krajewski, L., Leong, G. K., & Benton, W. C. (1994). The effects of environmental factors on the design of master production scheduling systems. Journal of Operations Management, 11(4), 367-384.
-
(1994)
Journal of Operations Management
, vol.11
, Issue.4
, pp. 367-384
-
-
Lin, N.P.1
Krajewski, L.2
Leong, G.K.3
Benton, W.C.4
-
20
-
-
0001983780
-
Open order due date maintenance in MRP systems
-
Penlesky, R. J., Berry, W. L., & Wemmerlöv, U. (1989). Open order due date maintenance in MRP systems. Management Science, 35(5), 571-584.
-
(1989)
Management Science
, vol.35
, Issue.5
, pp. 571-584
-
-
Penlesky, R.J.1
Berry, W.L.2
Wemmerlöv, U.3
-
21
-
-
0026254222
-
Filtering heuristics for rescheduling open orders in MRP systems
-
Penlesky, R. J., Wemmerlöv, U., & Berry, W. L. (1991). Filtering heuristics for rescheduling open orders in MRP systems. International Journal of Production Research, 29(11), 2279-2296.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.11
, pp. 2279-2296
-
-
Penlesky, R.J.1
Wemmerlöv, U.2
Berry, W.L.3
-
23
-
-
84985759548
-
Freezing the master production schedule under demand uncertainty
-
Sridharan, V., & Berry, W. L. (1990). Freezing the master production schedule under demand uncertainty. Decision Sciences, 27(1), 97-120.
-
(1990)
Decision Sciences
, vol.27
, Issue.1
, pp. 97-120
-
-
Sridharan, V.1
Berry, W.L.2
-
24
-
-
0023404035
-
Freezing the master production schedule under rolling planning horizons
-
Sridharan, V., Berry, W. L., & Udayabhanu, V. (1987). Freezing the master production schedule under rolling planning horizons. Management Science, 33(9), 1137-1149.
-
(1987)
Management Science
, vol.33
, Issue.9
, pp. 1137-1149
-
-
Sridharan, V.1
Berry, W.L.2
Udayabhanu, V.3
-
25
-
-
84985855322
-
Measuring master production schedule stability under rolling planning horizons
-
Sridharan, V., Berry, W. L., & Udayabhanu, V. (1988). Measuring master production schedule stability under rolling planning horizons. Decision Sciences, 19(2), 147-166.
-
(1988)
Decision Sciences
, vol.19
, Issue.2
, pp. 147-166
-
-
Sridharan, V.1
Berry, W.L.2
Udayabhanu, V.3
-
26
-
-
0000470092
-
The impact of safety stock on schedule instability, cost and service
-
Sridharan, V., & LaForge, R. L. ( 1989). The impact of safety stock on schedule instability, cost and service. Journal of Operations Management, 8(4), 327-347.
-
(1989)
Journal of Operations Management
, vol.8
, Issue.4
, pp. 327-347
-
-
Sridharan, V.1
LaForge, R.L.2
-
27
-
-
0002684530
-
An analysis of alternative policies to achieve schedule stability
-
Sridharan, V., & LaForge, R. L. (1990). An analysis of alternative policies to achieve schedule stability. Journal of Manufacturing and Operations Management, 3(1), 53-73.
-
(1990)
Journal of Manufacturing and Operations Management
, vol.3
, Issue.1
, pp. 53-73
-
-
Sridharan, V.1
LaForge, R.L.2
-
28
-
-
21844485482
-
Freezing the master production schedule: Implications for fill rate
-
Sridharan, V., & LaForge, R. L. (1994). Freezing the master production schedule: Implications for fill rate. Decision Sciences, 25(3), 461-469.
-
(1994)
Decision Sciences
, vol.25
, Issue.3
, pp. 461-469
-
-
Sridharan, V.1
LaForge, R.L.2
-
29
-
-
0003929853
-
-
Homewood, IL: Irwin
-
Vollmann, T. E., Berry, W. L., & Whybark, D. C. (1992). Manufacturing planning and control systems (3rd ed.). Homewood, IL: Irwin.
-
(1992)
Manufacturing Planning and Control Systems (3rd Ed.)
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
-
30
-
-
0028526352
-
The impact of lot splitting on due date performance
-
Wagner, B. J., & Ragatz, G. L. (1994). The impact of lot splitting on due date performance. Journal of Operations Management, 12(1), 13-26.
-
(1994)
Journal of Operations Management
, vol.12
, Issue.1
, pp. 13-26
-
-
Wagner, B.J.1
Ragatz, G.L.2
-
31
-
-
0018681632
-
Design factors in MRP systems: A limited survey
-
Wemmerlöv, U. (1979). Design factors in MRP systems: A limited survey. Production & Inventory Management, 20(4), 15-35.
-
(1979)
Production & Inventory Management
, vol.20
, Issue.4
, pp. 15-35
-
-
Wemmerlöv, U.1
-
32
-
-
0021425415
-
Lot-sizing under uncertainty in a rolling schedule environment
-
Wemmerlöv, U., & Whybark, D. C. (1984). Lot-sizing under uncertainty in a rolling schedule environment. International Journal of Production Research, 22(3), 467-484.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 467-484
-
-
Wemmerlöv, U.1
Whybark, D.C.2
-
33
-
-
0027612429
-
Freezing the master production schedule for material requirements planning systems under demand uncertainty
-
Zhao, X., & Lee, T. S. (1993). Freezing the master production schedule for material requirements planning systems under demand uncertainty. Journal of Operations Management, 11(2), 185-205.
-
(1993)
Journal of Operations Management
, vol.11
, Issue.2
, pp. 185-205
-
-
Zhao, X.1
Lee, T.S.2
|