메뉴 건너뛰기




Volumn 113, Issue 1, 1999, Pages 80-90

A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment

Author keywords

Branch and bound; Flexible manufacturing system; Heuristics; Scheduling

Indexed keywords

COMPUTATIONAL COMPLEXITY; CONSTRAINT THEORY; HEURISTIC METHODS; INTEGER PROGRAMMING; LINEAR PROGRAMMING; NUMERICAL ANALYSIS; PRODUCT DEVELOPMENT; RESOURCE ALLOCATION; SCHEDULING;

EID: 0039522090     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00433-5     Document Type: Article
Times cited : (14)

References (10)
  • 4
    • 0023385665 scopus 로고
    • Experimental investigation of flexible manufacturing system scheduling decision rules
    • Denzler D.R., Boe W.J. Experimental investigation of flexible manufacturing system scheduling decision rules. Internat. J. Prod. Res. 25(7):1987;979-994.
    • (1987) Internat. J. Prod. Res. , vol.25 , Issue.7 , pp. 979-994
    • Denzler, D.R.1    Boe, W.J.2
  • 5
    • 0021437506 scopus 로고
    • An application of multiple criteria decision making principles for planning operations
    • Ghiassi M., DeVor R., Dessouky M., Kijowski B. An application of multiple criteria decision making principles for planning operations. IIE Trans. 16(2):1984;106-114.
    • (1984) IIE Trans. , vol.16 , Issue.2 , pp. 106-114
    • Ghiassi, M.1    Devor, R.2    Dessouky, M.3    Kijowski, B.4
  • 6
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • MacCarthy B.L., Liu J. Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. Internat. J. Prod. Res. 31(1):1993;59-79.
    • (1993) Internat. J. Prod. Res. , vol.31 , Issue.1 , pp. 59-79
    • MacCarthy, B.L.1    Liu, J.2
  • 8
    • 0023825887 scopus 로고
    • A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
    • Norbis M.I., Smith J.M. A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems. European J. Oper. Res. 33:1988;30-41.
    • (1988) European J. Oper. Res. , vol.33 , pp. 30-41
    • Norbis, M.I.1    Smith, J.M.2
  • 9
    • 0026898533 scopus 로고
    • Experimental investigation of FMS machine and AGV scheduling rules against the mean flowtime criterion
    • Sabuncuoglu I., Hommertzheim D.L. Experimental investigation of FMS machine and AGV scheduling rules against the mean flowtime criterion. Internat. J. Production Res. 30(7):1992;1617-1635.
    • (1992) Internat. J. Production Res. , vol.30 , Issue.7 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.