메뉴 건너뛰기




Volumn 29, Issue 5, 1999, Pages 95-109

Course planning at Lufthansa technical training: Constructing more profitable schedules

Author keywords

Applications, Planning; Decision Support Systems Production Scheduling; Information Systems

Indexed keywords


EID: 0038928811     PISSN: 00922102     EISSN: None     Source Type: Journal    
DOI: 10.1287/inte.29.5.95     Document Type: Article
Times cited : (7)

References (14)
  • 1
    • 0025725556 scopus 로고
    • Constructing school time-tables using simulated annealing: Sequential and parallel algorithms
    • January
    • Abramson, D. 1991, "Constructing school time-tables using simulated annealing: Sequential and parallel algorithms," Management Science, Vol. 37, No. 1 (January), pp. 98-113.
    • (1991) Management Science , vol.37 , Issue.1 , pp. 98-113
    • Abramson, D.1
  • 4
    • 0026124744 scopus 로고
    • Exact colouring algorithm for weighted graphs applied to timetabling problems of different length
    • March
    • Cangalovic, M. and Schreuder, J. A. M. 1991, "Exact colouring algorithm for weighted graphs applied to timetabling problems of different length," European Journal of Operational Research, Vol. 51, No. 2 (March), pp. 248-258.
    • (1991) European Journal of Operational Research , vol.51 , Issue.2 , pp. 248-258
    • Cangalovic, M.1    Schreuder, J.A.M.2
  • 5
    • 38249016030 scopus 로고
    • Modelling and solving an acyclic multiperiod timetabling problem
    • Cangalovic, M. and Schreuder, J. A. M. 1992, "Modelling and solving an acyclic multiperiod timetabling problem," Discrete Applied Mathematics, Vol. 35, pp. 177-195.
    • (1992) Discrete Applied Mathematics , vol.35 , pp. 177-195
    • Cangalovic, M.1    Schreuder, J.A.M.2
  • 6
    • 0028766745 scopus 로고
    • A tabu search algorithm for computing an operational timetable
    • July
    • Costa, D. 1994, "A tabu search algorithm for computing an operational timetable," European Journal of Operational Research, Vol. 76, No. 1 (July), pp. 98-110.
    • (1994) European Journal of Operational Research , vol.76 , Issue.1 , pp. 98-110
    • Costa, D.1
  • 7
    • 0040701871 scopus 로고
    • A computer timetabling system for secondary schools in the netherlands
    • de Gans, O. B. 1981, "A computer timetabling system for secondary schools in the Netherlands," European Journal of Operational Research, Vol. 7, pp. 175-182.
    • (1981) European Journal of Operational Research , vol.7 , pp. 175-182
    • De Gans, O.B.1
  • 9
    • 0032210324 scopus 로고    scopus 로고
    • The course scheduling problem at Lufthansa technical training
    • November
    • Haase, K.; Latteier, J.; and Schirmer, A. 1998, "The course scheduling problem at Lufthansa Technical Training," European Journal of Operational Research, Vol. 110, No. 3 (November), pp. 441-456.
    • (1998) European Journal of Operational Research , vol.110 , Issue.3 , pp. 441-456
    • Haase, K.1    Latteier, J.2    Schirmer, A.3
  • 10
    • 0001644021 scopus 로고
    • Finding a feasible course schedule using tabu search
    • Hertz, A. 1992, "Finding a feasible course schedule using tabu search," Discrete Applied Mathematics, Vol. 35, pp. 255-270.
    • (1992) Discrete Applied Mathematics , vol.35 , pp. 255-270
    • Hertz, A.1
  • 11
    • 0026926482 scopus 로고
    • A logic approach to the resolution of constraints in timetabling
    • September
    • Kang, L. and White, G. M. 1992, "A logic approach to the resolution of constraints in timetabling," European Journal of Operational Research, Vol. 61, No. 3 (September), pp. 306-317.
    • (1992) European Journal of Operational Research , vol.61 , Issue.3 , pp. 306-317
    • Kang, L.1    White, G.M.2
  • 12
    • 0002866635 scopus 로고
    • The critical-path method: Resource planning and scheduling
    • eds. J. F. Muth and G. L. Thompson, Prentice-Hall, Englewood Cliffs, New Jersey
    • Kelley, J. E. 1963, "The critical-path method: Resource planning and scheduling," in Industrial Scheduling, eds. J. F. Muth and G. L. Thompson, Prentice-Hall, Englewood Cliffs, New Jersey, pp. 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 13
    • 21844484112 scopus 로고
    • Class scheduling to maximize participant satisfaction
    • May
    • Sampson, S. E.; Freeland, J. R.; and Weiss, E. N. 1995, "Class scheduling to maximize participant satisfaction," Interfaces, Vol. 25, No. 3 (May), pp. 30-41.
    • (1995) Interfaces , vol.25 , Issue.3 , pp. 30-41
    • Sampson, S.E.1    Freeland, J.R.2    Weiss, E.N.3
  • 14
    • 0021603760 scopus 로고
    • School timetabling - A case in large binary integer linear programming
    • December
    • Tripathy, A. 1984, "School timetabling - A case in large binary integer linear programming," Management Science, Vol. 30, No. 12 (December), pp. 1473-1489.
    • (1984) Management Science , vol.30 , Issue.12 , pp. 1473-1489
    • Tripathy, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.