메뉴 건너뛰기




Volumn 3, Issue ASIA PACIFIC, 2002, Pages 1760-1765

A method to decide the switching instants of controlled switching circuit breaker for shunt reactors

Author keywords

Circuit breaker; Controlled switching; Inrush current; Optimum instant; Reignition; Shunt reactor

Indexed keywords

COMPUTER SIMULATION; ELECTRIC CURRENTS; ELECTRIC IMPEDANCE; ELECTRIC POTENTIAL; ELECTROMAGNETISM; SWITCHING CIRCUITS;

EID: 0038826742     PISSN: 21608555     EISSN: 21608563     Source Type: Journal    
DOI: 10.1109/TDC.2002.1177721     Document Type: Article
Times cited : (21)

References (7)
  • 1
    • 0038660879 scopus 로고
    • Controlled switching - A state-of-the-art survey (part I)
    • Task Force 13.00, October
    • Task Force 13.00, “Controlled switching - A state-of-the-art survey (part I)" ELECTRA No. 162, October 1995.
    • (1995) ELECTRA No. 162 , vol.162
  • 2
    • 0038660877 scopus 로고    scopus 로고
    • Controlled switching - A state-of-the-art survey (part II)
    • Task Force 13.00, February
    • Task Force 13.00, “Controlled switching - A state-of-the-art survey (part II)" ELECTRA No. 164, February 1996.
    • (1996) ELECTRA No. 164 , vol.164
  • 3
    • 0038653073 scopus 로고    scopus 로고
    • Experience with controlled transmission line autoreclosing and controlled shunt reactor switching on B.C. Hydro system
    • D.F. Peelo, J.H. Sawada, “Experience with controlled transmission line autoreclosing and controlled shunt reactor switching on B.C. Hydro system”, CIGRE, 13-101, 1998.
    • (1998) CIGRE 13-101
    • Peelo, D.F.1    Sawada, J.H.2
  • 6
    • 0038653077 scopus 로고    scopus 로고
    • Controlled switching of HVAC CBs guide for application lines, reactors, capacitors, transformers (1st Part)
    • Working Group 13.07, April
    • Working Group 13.07, “Controlled switching of HVAC CBs guide for application lines, reactors, capacitors, transformers (1st Part)”, ELECTRA, No. 183, April 1999.
    • (1999) ELECTRA , vol.183
  • 7
    • 85013568163 scopus 로고    scopus 로고
    • Controlled switching of HVAC CBs guide for application lines, reactors, capacitors, transformers (2nd Part)
    • Working Group 13.07, August
    • Working Group 13.07, “Controlled switching of HVAC CBs guide for application lines, reactors, capacitors, transformers (2nd Part)”, ELECTRA, No.185, August 1999.
    • (1999) ELECTRA , vol.185


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.