메뉴 건너뛰기




Volumn 156, Issue 1, 2003, Pages 85-95

Swabi salinity control and reclamation project

Author keywords

Drainage and irrigation; River engineering

Indexed keywords

CIVIL ENGINEERING; ENGINEERS; MASONRY MATERIALS; RECLAMATION; SALINE WATER; SIPHONS; STEEL;

EID: 0038814718     PISSN: 14724561     EISSN: None     Source Type: Journal    
DOI: 10.1680/wame.2003.156.1.85     Document Type: Article
Times cited : (5)

References (6)
  • 2
    • 85039684736 scopus 로고
    • Wapda and Harza Engineering Co. Ltd. Project Planning Report, Phase I, Mardan SCARP
    • WAPDA AND HARZA ENGINEERING CO. LTD. Project Planning Report, Phase I, Mardan SCARP. 1977.
    • (1977)
  • 3
    • 0038224609 scopus 로고
    • The World Bank. Staff Appraisal Report, SCARP Mardan
    • THE WORLD BANK. Staff Appraisal Report, SCARP Mardan. 1979.
    • (1979)
  • 4
    • 85039687487 scopus 로고
    • Harza Engineering Co. Ltd and Nespak. Project Planning Report - Swabi SCARP
    • HARZA ENGINEERING CO. LTD and NESPAK. Project Planning Report-Swabi SCARP. 1982.
    • (1982)
  • 5
    • 85039677963 scopus 로고
    • FAO. Irrigation and Drainage Paper No. 24, FAO, Rome
    • FAO. Irrigation and Drainage Paper No. 24, FAO, Rome, 1989.
    • (1989)
  • 6
    • 0038563252 scopus 로고
    • LBOD integrated irrigation and drainage in Pakistan
    • Special Session
    • LEE, SHEIKH AND YOUSSEF. LBOD integrated irrigation and drainage in Pakistan. Proceedings of the ICID 13th Congress, Special Session, 1987.
    • (1987) Proceedings of the ICID 13th Congress
    • Lee, S.1    Youssef2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.