메뉴 건너뛰기




Volumn 9, Issue 1, 2003, Pages 33-36

Production scheduling model and algorithm for steel making-continuous casting-hot rolling processes

Author keywords

Cast; Charge; Integrated management; Just in time; Lagrangian Relaxation; Rolling unit

Indexed keywords

ALGORITHMS; AUTOMATION; COMPUTER INTEGRATED MANUFACTURING; ROLLING; STEEL CASTINGS;

EID: 0038796410     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (33)

References (8)
  • 1
    • 0038121483 scopus 로고    scopus 로고
    • Analysis of modeling factor of integrated lot planning for SM-CC-HRM
    • Chinese source
    • TANG Lixin, et al. Analysis of modeling factor of integrated lot planning for SM-CC-HRM [J]. Iron and Steel, 2000, (5): 74-76 (in Chinese).
    • (2000) Iron and Steel , Issue.5 , pp. 74-76
    • Tang, L.1
  • 2
    • 0037783815 scopus 로고    scopus 로고
    • Steelmaking, continuous casting and hot charge rolling integrated scheduling management
    • Chinese source
    • SUN Fuquan, ZHENG Binglin, TANG Lixin, et al. Steelmaking, continuous casting and hot charge rolling integrated scheduling management [J]. Iron and Steel, 1998, (12): 71-75 (in Chinese).
    • (1998) Iron and Steel , Issue.12 , pp. 71-75
    • Sun, F.1    Zheng, B.2    Tang, L.3
  • 3
    • 0032268486 scopus 로고    scopus 로고
    • Scheduling for batch chemical processes using Lagrangian relaxation-based approach
    • Chinese source
    • WANG Zhaohui, CHEN Haoxun, HU Baosheng. Scheduling for batch chemical processes using Lagrangian relaxation-based approach [J]. Acta Autoamtion Sinica, 1998, (1): 1-7 (in Chinese).
    • (1998) Acta Automation Sinica , Issue.1 , pp. 1-7
    • Wang, Z.1    Chen, H.2    Hu, B.3
  • 4
    • 0032269332 scopus 로고    scopus 로고
    • Research on steelmaking and continuous casting production scheduling
    • Chinese source
    • TANG Lixin, YANG Zihou, WANG Mengguang. Research on steelmaking and continuous casting production scheduling [J]. Acta Automatica Sinica, 1998, (1): 9-14 (in Chinese).
    • (1998) Acta Automatica Sinica , Issue.1 , pp. 9-14
    • Tang, L.1    Yang, Z.2    Wang, M.3
  • 5
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking-continuous casting production
    • TANG Lxin, LIU Jiiyin, RONG Aiying, et al. A mathematical programming model for scheduling steelmaking-continuous casting production [J]. European Journal of Operational Research, 2000, (120): 423-435.
    • (2000) European Journal of Operational Research , Issue.120 , pp. 423-435
    • Tang, L.1    Liu, J.2    Dong, A.3
  • 6
    • 0033741404 scopus 로고    scopus 로고
    • A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baogang Iron and Steel Complex
    • TANG Lixin, LIU Jiyn, RONG Aiying, et al. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baogang Iron and Steel Complex [J]. European Journal of Operational Research, 2000, (124): 267-282.
    • (2000) European Journal of Operational Research , Issue.124 , pp. 267-282
    • Tang, L.1    Liu, J.2    Rong, A.3
  • 7
    • 0027540994 scopus 로고
    • A practical approach to job-shop scheduling problem
    • HOITOMP D J, LUH P B, A practical approach to job-shop scheduling problems [J]. IEEE Trans. Robotics and Automation, 1993, 9(1): 1-13.
    • (1993) IEEE Trans. Robotics and Automation , vol.9 , Issue.1 , pp. 1-13
    • Hoitomp, D.J.1    Luh, P.B.2
  • 8
    • 0032654876 scopus 로고    scopus 로고
    • An effective approach for job-shop scheduling with uncertain processing requirements
    • LUH P B, et a. An effective approach for job-shop scheduling with uncertain processing requirements [J]. IEEE Trans. Robotics and Automation, 1999, 15(2): 329-339.
    • (1999) IEEE Trans. Robotics and Automation , vol.15 , Issue.2 , pp. 329-339
    • Luh, P.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.