-
1
-
-
0037912633
-
Simplified procedures for routine performance tests of steam turbines
-
ASME ANSI PTC 6S report 1974, reaffirmed 1985
-
ASME (1985), “Simplified procedures for routine performance tests of steam turbines”, ANSI PTC 6S report 1974, reaffirmed 1985.
-
(1985)
-
-
-
2
-
-
0018057634
-
Recent experience with condition monitoring of steam turbines by performance analysis
-
Australia
-
Beebe, R. (1978), “Recent experience with condition monitoring of steam turbines by performance analysis”, Transactions of Mechanical Engineering, Institution of Engineers, Australia.
-
(1978)
Transactions of Mechanical Engineering, Institution of Engineers
-
-
Beebe, R.1
-
5
-
-
0037912625
-
Steam turbine generator condition monitoring by performance analysis: Derivation of correction factors by test
-
Tasmania
-
Beebe, R. (1998c), “Steam turbine generator condition monitoring by performance analysis: Derivation of correction factors by test”, Proceedings of 11th COMADEM 98, Tasmania, Vol. 1, pp. 87-92.
-
(1998)
Proceedings of 11th COMADEM 98
, vol.1
, pp. 87-92
-
-
Beebe, R.1
-
6
-
-
0038250152
-
Case studies in condition monitoring of low pressure steam turbines by performance analysis
-
Houston, TX
-
Beebe, R. (2000), “Case studies in condition monitoring of low pressure steam turbines by performance analysis”, Proceedings of 13th COMADEM, Houston, TX.
-
(2000)
Proceedings of 13th COMADEM
-
-
Beebe, R.1
-
8
-
-
84986093947
-
Remaining life study of a 350MW HP/IP turbine
-
Conference on Pressure Vessels and Pipework, Sydney
-
Coade, R. and Nowak, S. (1993), “Remaining life study of a 350MW HP/IP turbine”, Conference on Pressure Vessels and Pipework, Sydney.
-
(1993)
-
-
Coade, R.1
Nowak, S.2
-
10
-
-
0037912623
-
Turbine steam path monitoring using plant DPA system
-
unpublished degree major project, Monash University, Melbourne
-
Groves, K. (1996), “Turbine steam path monitoring using plant DPA system”, unpublished degree major project, Monash University, Melbourne.
-
(1996)
-
-
Groves, K.1
-
11
-
-
0027561086
-
Steam turbine technology keeps pace with demands
-
March, available at: www.encotech.com/software/eSTPE.html
-
Kuehn, S.E. (1993), “Steam turbine technology keeps pace with demands”, Power Engineering, March, available at: www.encotech.com/software/eSTPE.html
-
(1993)
Power Engineering
-
-
Kuehn, S.E.1
-
12
-
-
0029424014
-
Development and implementation of a turbine-generator outage interval extension strategy
-
McCloskey, T.H., Pollard, M.A. and Schimmels, J.N. (1995), “Development and implementation of a turbine-generator outage interval extension strategy”, PWR-Vol 28 ASME/IEEE International Joint Power Generation Conference, pp. 485-491.
-
(1995)
PWR-Vol 28 ASME/IEEE International Joint Power Generation Conference
, pp. 485-491
-
-
McCloskey, T.H.1
Pollard, M.A.2
Schimmels, J.N.3
-
14
-
-
84986028313
-
Turbine-generator asset management using EPRI’s Turbo-X program
-
EPRI Welding Conference, May
-
Roemer, M.J., Orsagh, R. and Hesler, S. (2000a), “Turbine-generator asset management using EPRI’s Turbo-X program”, EPRI Welding Conference, May.
-
(2000)
-
-
Roemer, M.J.1
Orsagh, R.2
Hesler, S.3
-
15
-
-
0038250148
-
Turbine-generator maintenance outage optimisation: Probability/risk assessment of net present value
-
Virginia Beach, VA
-
Roemer, M.J., Dewey, R.P., Atkinson, B., Mauney, D.A. and McCloskey, T.H. (1998), “Turbine-generator maintenance outage optimisation: Probability/risk assessment of net present value”, Proceedings of 52nd Meeting of Society for Machinery Failure Prevention Technology, Virginia Beach, VA.
-
(1998)
Proceedings of 52nd Meeting of Society for Machinery Failure Prevention Technology
-
-
Roemer, M.J.1
Dewey, R.P.2
Atkinson, B.3
Mauney, D.A.4
McCloskey, T.H.5
-
16
-
-
0037912624
-
-
PennWell, Tulsa, OK
-
Sanders, W.P. (2002), Turbine Steam Path Maintenance and Repair, Vol. 1, PennWell, Tulsa, OK.
-
(2002)
Turbine Steam Path Maintenance and Repair
, vol.1
-
-
Sanders, W.P.1
-
17
-
-
0037574562
-
First turbine inspection after a 15-year operating period
-
October
-
Vetter, H. and Schwiemler, G. (1989), “First turbine inspection after a 15-year operating period”, VGB KRAFTWERKSTECHNIK, Vol. 69 No. 10, October, pp. 835-845.
-
(1989)
VGB KRAFTWERKSTECHNIK
, vol.69
, Issue.10
, pp. 835-845
-
-
Vetter, H.1
Schwiemler, G.2
|