메뉴 건너뛰기




Volumn 3, Issue ASIA PACIFIC, 2002, Pages 1606-1610

A practical mixed integer linear programming-based short-term hydro scheduling

Author keywords

Hydro Operations Planning; Interior Point Method; Mixed Integer Linear Programming; Short Term Hydro Scheduling

Indexed keywords

ALGORITHMS; DECISION SUPPORT SYSTEMS; HYDRAULICS; HYDROELECTRIC POWER PLANTS; LINEAR PROGRAMMING;

EID: 0038646576     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (16)

References (19)
  • 1
    • 0028428070 scopus 로고
    • Optimal short-term scheduling for a large scale cascaded hydro systems
    • May
    • M. R. Piekutowski, T. Litwinowicz, and R. J. Frowd, "Optimal short-term scheduling for a large scale cascaded hydro systems," IEEE Trans. Power Systems, vol. 9, no. 2, pp. 805-811, May 1994.
    • (1994) IEEE Trans. Power Systems , vol.9 , Issue.2 , pp. 805-811
    • Piekutowski, M.R.1    Litwinowicz, T.2    Frowd, R.J.3
  • 3
    • 0030083056 scopus 로고    scopus 로고
    • Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method
    • Feb.
    • M. Christoforidis, B. Awobamise, S. T. Tong, M. Aganagic, and F. A. Rahimi, "Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method," IEEE Trans. Power Systems, vol. 11, no. 1, pp. 287-293, Feb. 1996.
    • (1996) IEEE Trans. Power Systems , vol.11 , Issue.1 , pp. 287-293
    • Christoforidis, M.1    Awobamise, B.2    Tong, S.T.3    Aganagic, M.4    Rahimi, F.A.5
  • 4
    • 0033079502 scopus 로고    scopus 로고
    • Generation scheduling in a deregulated system - The Norwegian case
    • Feb.
    • O. B. Fosso, A. Gjelsvik, A. Haugstad, B. Mo, and I. Wangensteen, "Generation scheduling in a deregulated system - the Norwegian case," IEEE Trans. Power Systems, vol. 14, no. 1, pp. 75-81, Feb. 1999.
    • (1999) IEEE Trans. Power Systems , vol.14 , Issue.1 , pp. 75-81
    • Fosso, O.B.1    Gjelsvik, A.2    Haugstad, A.3    Mo, B.4    Wangensteen, I.5
  • 5
    • 85026387283 scopus 로고    scopus 로고
    • A mixed integer linear programming based hydro unit commitment
    • July
    • G. W. Chang and J. G. Waight, "A mixed integer linear programming based hydro unit commitment," Proc. 1999 IEEE PES Summer Meeting, pp. 924-928, July 1999.
    • (1999) Proc. 1999 IEEE PES Summer Meeting , pp. 924-928
    • Chang, G.W.1    Waight, J.G.2
  • 8
    • 0024719920 scopus 로고
    • Short term hydrothermal coordination using multipass dynamic programming
    • Aug.
    • J. S. Yang and N. Chen, "Short term hydrothermal coordination using multipass dynamic programming," IEEE Trans. Power Systems, vol. 4, no. 3, pp. 1050-1056, Aug. 1989.
    • (1989) IEEE Trans. Power Systems , vol.4 , Issue.3 , pp. 1050-1056
    • Yang, J.S.1    Chen, N.2
  • 9
    • 0029407272 scopus 로고
    • A multiobjective approach to the short-term scheduling of a hydroelectric power system
    • Nov.
    • C. Lyra, L. Roberto, and M. Ferreira, "A multiobjective approach to the short-term scheduling of a hydroelectric power system," IEEE Trans. Power Systems, vol. 10, no. 4, pp. 1750-1755, Nov. 1995.
    • (1995) IEEE Trans. Power Systems , vol.10 , Issue.4 , pp. 1750-1755
    • Lyra, C.1    Roberto, L.2    Ferreira, M.3
  • 10
    • 0022665422 scopus 로고
    • Application of decomposition techniques to short-term operation planning of hydrothermal power system
    • Feb.
    • H. Habibollahzadeh and J. A. Bubenko, "Application of decomposition techniques to short-term operation planning of hydrothermal power system," IEEE Trans. Power Systems, vol. 1, no. 1, pp. 41-47, Feb. 1986.
    • (1986) IEEE Trans. Power Systems , vol.1 , Issue.1 , pp. 41-47
    • Habibollahzadeh, H.1    Bubenko, J.A.2
  • 11
    • 0026153214 scopus 로고
    • A short term hydrothermal scheduling approach for dominantly hydro systems
    • May
    • T. Ohishi, S. Soares, and M.F.H. Carvalho, "A short term hydrothermal scheduling approach for dominantly hydro systems," IEEE Trans. Power Systems, vol. 6, no. 2, pp. 637-643, May 1991.
    • (1991) IEEE Trans. Power Systems , vol.6 , Issue.2 , pp. 637-643
    • Ohishi, T.1    Soares, S.2    Carvalho, M.F.H.3
  • 12
    • 0028426230 scopus 로고
    • Optimization-based scheduling of hydrothermal power systems with pumped-storage units
    • May
    • X. Guan, E. Ni, R. Li, and P. B. Luh, "Optimization-based scheduling of hydrothermal power systems with pumped-storage units," IEEE Trans. Power Systems, vol. 9, no. 2, pp. 1023-1029, May 1994.
    • (1994) IEEE Trans. Power Systems , vol.9 , Issue.2 , pp. 1023-1029
    • Guan, X.1    Ni, E.2    Li, R.3    Luh, P.B.4
  • 13
    • 0031270315 scopus 로고    scopus 로고
    • An algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints
    • Nov.
    • X. Guan, E. Ni, R. Li, and P. B. Luh, "An algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints," IEEE Trans. Power Systems, vol. 12, no. 4, pp. 1775-1780, Nov. 1997.
    • (1997) IEEE Trans. Power Systems , vol.12 , Issue.4 , pp. 1775-1780
    • Guan, X.1    Ni, E.2    Li, R.3    Luh, P.B.4
  • 14
    • 0020844951 scopus 로고
    • Optimal operations planning in a large hydro-thermal power system
    • Nov.
    • D. Sjelvgren, S. Andersson, and T. S. Dillon, "Optimal operations planning in a large hydro-thermal power system," IEEE Trans. Power Apparatus and Systems, vol. 102, no. 11, pp. 3644-3651, Nov. 1983.
    • (1983) IEEE Trans. Power Apparatus and Systems , vol.102 , Issue.11 , pp. 3644-3651
    • Sjelvgren, D.1    Andersson, S.2    Dillon, T.S.3
  • 15
    • 0023401835 scopus 로고
    • An efficient hydrothermal scheduling algorithm
    • Aug.
    • M. F. Carvalho and S. Soares, "An efficient hydrothermal scheduling algorithm," IEEE Trans. Power Systems, vol. 2, no. 3, pp. 537-542, Aug. 1987.
    • (1987) IEEE Trans. Power Systems , vol.2 , Issue.3 , pp. 537-542
    • Carvalho, M.F.1    Soares, S.2
  • 16
    • 0006699512 scopus 로고
    • Efficient large-scale hydro system scheduling with forced spill conditions
    • Aug.
    • Y. Ikura and G. Gross, "Efficient large-scale hydro system scheduling with forced spill conditions," IEEE Trans. Power Systems, vol. 3, no. 3, pp. 1072-1077, Aug. 1988.
    • (1988) IEEE Trans. Power Systems , vol.3 , Issue.3 , pp. 1072-1077
    • Ikura, Y.1    Gross, G.2
  • 17
    • 0030084671 scopus 로고    scopus 로고
    • Mixed-integer programming applied to short-term hydro planning of a hydro-thermal system
    • Feb.
    • O. Nilsson and D. Sjelvgren, "Mixed-integer programming applied to short-term hydro planning of a hydro-thermal system," IEEE Trans. Power Systems, vol. 11, no. 1, pp. 281-286, Feb. 1996.
    • (1996) IEEE Trans. Power Systems , vol.11 , Issue.1 , pp. 281-286
    • Nilsson, O.1    Sjelvgren, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.