메뉴 건너뛰기




Volumn 36, Issue 5, 2003, Pages 30-33

Elimination of temporary propping using the observational method on the Heathrow airside road tunnel project
[No Author Info available]

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION; EARTH BORING MACHINES; EXCAVATION; PROJECT MANAGEMENT;

EID: 0038527077     PISSN: 00174653     EISSN: None     Source Type: Trade Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (6)
  • 1
    • 0038724156 scopus 로고    scopus 로고
    • Construction Task Force Chairman Sir John Egan, Rethinking Construction DETR, London
    • Construction Task Force (1998). Chairman Sir John Egan, Rethinking Construction. DETR, London.
    • (1998)
  • 4
    • 0014520060 scopus 로고
    • Advantages and limitations of the observational method in applied soil mechanics
    • Peck, RB (1969). Advantages and limitations of the observational method in applied soil mechanics. Géotechnique 19, No. 2, pp 171-187.
    • (1969) Géotechnique , vol.19 , Issue.2 , pp. 171-187
    • Peck, R.B.1
  • 5
    • 0028669654 scopus 로고
    • An overview of the observational method: Development in cut and cover and bored tunnelling projects
    • Powderham, AJ (1994). An overview of the observational method: development in cut and cover and bored tunnelling projects. Géotechnique 44, No. 4, pp 619-636.
    • (1994) Géotechnique , vol.44 , Issue.4 , pp. 619-636
    • Powderham, A.J.1
  • 6
    • 0036390326 scopus 로고    scopus 로고
    • The observational method - Learning from projects
    • Powderham, AJ (2002). The observational method - learning from projects. Geotechnical Engineering 155, No 1, pp 59-69.
    • (2002) Geotechnical Engineering , vol.155 , Issue.1 , pp. 59-69
    • Powderham, A.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.