메뉴 건너뛰기




Volumn 66, Issue 2, 2003, Pages 97-103

Fast evolutionary programming techniques for short-term hydrothermal scheduling

Author keywords

Cauchy mutation; Classical evolutionary programming; Fast evolutionary programming; Gaussian mutation; Hydrothermal scheduling

Indexed keywords

EVOLUTIONARY ALGORITHMS; PROBLEM SOLVING; SCHEDULING;

EID: 0038347197     PISSN: 03787796     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0378-7796(03)00016-6     Document Type: Article
Times cited : (84)

References (20)
  • 1
    • 0012205880 scopus 로고    scopus 로고
    • Short-term hydrothermal coordination by Lagrangian relaxation: Solution to the dual problem
    • Orlando, FL, USA, paper PE-333 PWRS-0-12-1997
    • N.R. Jimenez, A.J. Conejo, Short-term hydrothermal coordination by Lagrangian relaxation: solution to the dual problem, in IEEE-PES Winter Meeting, Orlando, FL, USA, 1998, paper PE-333 PWRS-0-12-1997.
    • (1998) IEEE-PES Winter Meeting
    • Jimenez, N.R.1    Conejo, A.J.2
  • 2
    • 0022665422 scopus 로고
    • Application of decomposition techniques to short-term operation planning of hydrothermal power system
    • Habibollahzadeh H., Bubenko J.A. Application of decomposition techniques to short-term operation planning of hydrothermal power system. IEEE Trans. Power Syst. PWRS-I:(1):1986;41-47.
    • (1986) IEEE Trans. Power Syst. , vol.PWRS-I , Issue.1 , pp. 41-47
    • Habibollahzadeh, H.1    Bubenko, J.A.2
  • 3
    • 0023401835 scopus 로고
    • An efficient hydrothermal scheduling algorithm
    • Carvalho M.F., Soares S. An efficient hydrothermal scheduling algorithm. IEEE Trans. PWRS-4:1987;537-542.
    • (1987) IEEE Trans. , vol.PWRS-4 , pp. 537-542
    • Carvalho, M.F.1    Soares, S.2
  • 4
    • 0028510852 scopus 로고
    • Short-term hydrothermal scheduling, part-I: Simulated annealing approach
    • Wong K.P., Wong Y.W. Short-term hydrothermal scheduling, part-I: simulated annealing approach. IEE Proc. Part-C. 141:(5):1994;497-501.
    • (1994) IEE Proc. Part-C , vol.141 , Issue.5 , pp. 497-501
    • Wong, K.P.1    Wong, Y.W.2
  • 5
    • 0034430899 scopus 로고    scopus 로고
    • A diploid genetic approach to short-term scheduling of hydrothermal system
    • Wu Y.-G., Ho C.-Y., Wang D.-Y. A diploid genetic approach to short-term scheduling of hydrothermal system. IEEE Trans. Power Syst. 15:(4):2000;1268-1274.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.4 , pp. 1268-1274
    • Wu, Y.-G.1    Ho, C.-Y.2    Wang, D.-Y.3
  • 6
    • 0002651837 scopus 로고
    • An overview of evolutionary algorithms for parameter optimization
    • Bäck T., Schwefel H.-P. An overview of evolutionary algorithms for parameter optimization. Evol. Comput. 1:(1):1993;1-23.
    • (1993) Evol. Comput. , vol.1 , Issue.1 , pp. 1-23
    • Bäck, T.1    Schwefel, H.-P.2
  • 7
    • 0028338155 scopus 로고
    • An introduction to simulated evolutionary optimization
    • Fogel D.B. An introduction to simulated evolutionary optimization. IEEE Trans. Neural Netw. 5:(1):1994;3-14.
    • (1994) IEEE Trans. Neural Netw. , vol.5 , Issue.1 , pp. 3-14
    • Fogel, D.B.1
  • 8
    • 0032685734 scopus 로고    scopus 로고
    • Evolutionary programming made faster
    • Yao X., Liu Y., Lin G. Evolutionary programming made faster. IEEE Trans. Evol. Comput. 3:(2):1999;82-102.
    • (1999) IEEE Trans. Evol. Comput. , vol.3 , Issue.2 , pp. 82-102
    • Yao, X.1    Liu, Y.2    Lin, G.3
  • 9
    • 0029326675 scopus 로고
    • A comparison of evolutionary programming and genetic algorithms on selected constrained optimization problems
    • June
    • D.B. Fogel, A comparison of evolutionary programming and genetic algorithms on selected constrained optimization problems, Simulation, June, (1995) 397-404.
    • (1995) Simulation , pp. 397-404
    • Fogel, D.B.1
  • 10
    • 0030189603 scopus 로고    scopus 로고
    • Scheduling short-term hydrothermal generation using evolutionary programming techniques
    • Yang P.-C., Yang H.-T., Huang C.-L. Scheduling short-term hydrothermal generation using evolutionary programming techniques. IEE Proc. Gener. Transm. Distrib. 143:(4):1996;371-376.
    • (1996) IEE Proc. Gener. Transm. Distrib. , vol.143 , Issue.4 , pp. 371-376
    • Yang, P.-C.1    Yang, H.-T.2    Huang, C.-L.3
  • 11
    • 0033359881 scopus 로고    scopus 로고
    • Short-term hydrothermal scheduling through evolutionary programming technique
    • Hota P.K., Chakrabarti R., Chattopadhyay P.K. Short-term hydrothermal scheduling through evolutionary programming technique. Electric Power Syst. Res. 52:(2):1999;189-196.
    • (1999) Electric Power Syst. Res. , vol.52 , Issue.2 , pp. 189-196
    • Hota, P.K.1    Chakrabarti, R.2    Chattopadhyay, P.K.3
  • 17
    • 0029225041 scopus 로고
    • Mixed integer programming applied to short-term planning of a hydro-thermal system
    • Salt Lake City, UT, USA, May
    • O. Nilson, D. Sjelvgren, Mixed integer programming applied to short-term planning of a hydro-thermal system, Proceedings of the 1995 IEEE PICA, Salt Lake City, UT, USA, May 1995, pp. 158-163.
    • (1995) Proceedings of the 1995 IEEE PICA , pp. 158-163
    • Nilson, O.1    Sjelvgren, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.