메뉴 건너뛰기




Volumn 2, Issue SUMMER, 2002, Pages 830-835

Study of loss of load probability in designing installed capacity market

Author keywords

Electric Power Industry Restructure; Loss of Load Probability (LOLP); Market Mechanisms; Power System Reliability

Indexed keywords

COMPETITION; COSTS; ELECTRIC LOAD MANAGEMENT; ELECTRIC POWER GENERATION; ELECTRIC POWER TRANSMISSION; INDUSTRIAL ECONOMICS; INVESTMENTS;

EID: 0038338656     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (6)
  • 3
    • 0037867152 scopus 로고    scopus 로고
    • California's electricity market meltdown
    • OpEd, January 13
    • P. Joskow, "California's Electricity Market Meltdown", New York Times, OpEd, January 13, 2001.
    • (2001) New York Times
    • Joskow, P.1
  • 6
    • 0037529488 scopus 로고    scopus 로고
    • http:www.nyiso.com


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.