메뉴 건너뛰기




Volumn 2, Issue SUMMER, 2002, Pages 713-718

Transmission system reliability evaluation of KEPCO system in face of deregulation

Author keywords

CMELDC; Composite power system equivalent load duration curves; Transmission system reliability

Indexed keywords

ELECTRIC INDUSTRY; ELECTRIC LOADS; ELECTRIC POWER GENERATION; LAWS AND LEGISLATION; RELIABILITY;

EID: 0038000721     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (10)

References (11)
  • 2
    • 0038204920 scopus 로고    scopus 로고
    • Computation of reliability based generation equivalence to a transmission facility in the new competitive electricity market
    • 1999
    • A. A. Chowdhury and D. O. Koval, "COMPUTATION OF RELIABILITY BASED GENERATION EQUIVALENCE TO A TRANSMISSION FACILITY IN THE NEW COMPETITIVE ELECTRICITY MARKET," IEEE Power Engineering Society Summer Meeting, 1999. Vol. 2, pp. 1024 -1030, 1999.
    • (1999) IEEE Power Engineering Society Summer Meeting , vol.2 , pp. 1024-1030
    • Chowdhury, A.A.1    Koval, D.O.2
  • 3
    • 0035792288 scopus 로고    scopus 로고
    • Nodal probabilistic congestion and reliability evaluations of a transmission system under the deregulated electricity market
    • J. S. Choi, H. S. Kim, Junmin Cha and Roy Billinton, "Nodal Probabilistic Congestion and Reliability Evaluations of a Transmission System under the Deregulated Electricity Market," IEEE Power Engineering Society Summer Meeting, 2001. Vol. 1, pp. 497-502.
    • (2001) IEEE Power Engineering Society Summer Meeting , vol.1 , pp. 497-502
    • Choi, J.S.1    Kim, H.S.2    Cha, J.3    Billinton, R.4
  • 5
    • 0037816209 scopus 로고    scopus 로고
    • Development of the ELDC and reliability evaluation of composite power system using Monte Carlo method
    • J. S. Choi, S. P. Moon, H. S. Kim, Junmin Cha and Roy Billinton, "Development of the ELDC and Reliability Evaluation of Composite Power System Using Monte Carlo Method," IEEE Power Engineering Society Summer Meeting, 2000. Vol. 4, pp. 2063-2068.
    • (2000) IEEE Power Engineering Society Summer Meeting , vol.4 , pp. 2063-2068
    • Choi, J.S.1    Moon, S.P.2    Kim, H.S.3    Cha, J.4    Billinton, R.5
  • 7
    • 0011852981 scopus 로고
    • Composite system reliability evaluation
    • Feb.
    • Roy Billinton, "Composite System Reliability Evaluation," IEEE, Vol. PAS-88, No. 4, pp. 276-281, Feb., 1969.
    • (1969) IEEE , vol.PAS-88 , Issue.4 , pp. 276-281
    • Billinton, R.1
  • 9
    • 0038820361 scopus 로고    scopus 로고
    • Development of a method for ELDC construction
    • Jeaseok Choi, Daeho Do, Seungpil Moon, "Development of a Method for ELDC Construction," LESCOPE '99, pp.189-194, 1999.
    • (1999) LESCOPE '99 , pp. 189-194
    • Choi, J.1    Do, D.2    Moon, S.3
  • 10
    • 0026107665 scopus 로고
    • Power arrival evaluation of bulk system including network constraints based on linear programming approach
    • L. Chen, H. Suwa and J. Toyoda, "Power Arrival Evaluation of Bulk System Including Network Constraints Based on Linear Programming Approach," IEEE Trans. on Power Systems, Vol. 6, No. 1, pp. 37-42, 1991.
    • (1991) IEEE Trans. on Power Systems , vol.6 , Issue.1 , pp. 37-42
    • Chen, L.1    Suwa, H.2    Toyoda, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.