-
3
-
-
38248999492
-
Scheduling unit time open shops to minimize the weighted number of late jobs
-
P. Brucker, B. Jurisch, T. Tautenhan, F. Werner, Scheduling unit time open shops to minimize the weighted number of late jobs, Oper. Res. Lett. 14 (5) (1994) 245-250.
-
(1994)
Oper. Res. Lett.
, vol.14
, Issue.5
, pp. 245-250
-
-
Brucker, P.1
Jurisch, B.2
Tautenhan, T.3
Werner, F.4
-
4
-
-
0043192040
-
Polynomial algorithms for resource constrained and multiprocessor task scheduling problems with a fixed number of task types
-
P. Brucker, A. Krämer, Polynomial algorithms for resource constrained and multiprocessor task scheduling problems with a fixed number of task types, Osnabrück. Shrift. Math. Reihe P (165) (1994); European J. Oper. Res. to appear.
-
(1994)
Osnabrück. Shrift. Math. Reihe P
, Issue.165
-
-
Brucker, P.1
Krämer, A.2
-
5
-
-
0042690959
-
-
to appear
-
P. Brucker, A. Krämer, Polynomial algorithms for resource constrained and multiprocessor task scheduling problems with a fixed number of task types, Osnabrück. Shrift. Math. Reihe P (165) (1994); European J. Oper. Res. to appear.
-
European J. Oper. Res.
-
-
-
6
-
-
0000175577
-
On edge coloring bipartite graphs
-
R. Cole, J. Hopcroft, On edge coloring bipartite graphs, SIAM J. Comput 11 1982 540-546.
-
(1982)
SIAM J. Comput
, vol.11
, pp. 540-546
-
-
Cole, R.1
Hopcroft, J.2
-
7
-
-
0026107761
-
A preemptive open shop scheduling problem with one resource
-
D. de Werra, J. Blazewicz, W. Kubiak, A preemptive open shop scheduling problem with one resource, Oper. Res. Lett. 10 (1991) 9-15.
-
(1991)
Oper. Res. Lett.
, vol.10
, pp. 9-15
-
-
De Werra, D.1
Blazewicz, J.2
Kubiak, W.3
-
8
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
R.E. Graham, E.L. Lawler, J.K. Lenstra, A.H.G. Rinnooy Kan, Optimization and approximation in deterministic sequencing and scheduling: a survey, Ann. Discrete Math. 5 (1979) 287-326.
-
(1979)
Ann. Discrete Math.
, vol.5
, pp. 287-326
-
-
Graham, R.E.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
9
-
-
84977359999
-
Open shop scheduling with release dates to minimize maximum lateness
-
H. Kellerer, T. Tautenhahn, G.J. Woeginger, Open shop scheduling with release dates to minimize maximum lateness, Naval Res. Logist. 41 (1) (1995) 141-145.
-
(1995)
Naval Res. Logist.
, vol.41
, Issue.1
, pp. 141-145
-
-
Kellerer, H.1
Tautenhahn, T.2
Woeginger, G.J.3
-
10
-
-
0024038037
-
Scheduling open shops with unit processing times to minimize functions of due dates
-
C.Y. Liu, R.L. Bulfin, Scheduling open shops with unit processing times to minimize functions of due dates, Oper. Res. 36 (1988) 553-559.
-
(1988)
Oper. Res.
, vol.36
, pp. 553-559
-
-
Liu, C.Y.1
Bulfin, R.L.2
-
12
-
-
0027927420
-
Scheduling unit-time open shops with deadlines
-
T. Tautenhahn, Scheduling unit-time open shops with deadlines, Oper. Res. 42 (1994) 189-192.
-
(1994)
Oper. Res.
, vol.42
, pp. 189-192
-
-
Tautenhahn, T.1
-
13
-
-
0029697585
-
On unit time open shops with additional restrictions
-
T. Tautenhahn, On unit time open shops with additional restrictions, Z. Oper. Res. 43 (2) (1994) 215-232.
-
(1994)
Z. Oper. Res.
, vol.43
, Issue.2
, pp. 215-232
-
-
Tautenhahn, T.1
|