|
Volumn 43, Issue 2, 2003, Pages 201-215
|
Field measured pre-stress concrete losses versus design code estimates
|
Author keywords
Axial strain measurements; Bridge instrumentation; Bridge monitoring; Modified AASHTO type VI girder; Nonlinear concrete stresses; Pre stress losses; Pre stressed concrete bridge; Pre stressed concrete girder; Time dependent pre stress losses; Vibrating wire strain gages
|
Indexed keywords
BEAMS AND GIRDERS;
ESTIMATION;
PRESTRESSED CONCRETE;
STRAIN;
STRUCTURAL ANALYSIS;
CONCRETE LOSSES;
CONCRETE BRIDGES;
BRIDGE;
CONCRETE;
STRESS;
CONCRETE BRIDGE;
MECHANICAL STRESS;
PERFORMANCE;
TENSILE STRENGTH;
TENSION;
|
EID: 0037668489
PISSN: 00144851
EISSN: None
Source Type: Journal
DOI: 10.1177/0014485103043002010 Document Type: Article |
Times cited : (8)
|
References (8)
|