메뉴 건너뛰기




Volumn 2, Issue , 2003, Pages 1374-1379

Constructing a job-shop scheduling model based on imprecise data

Author keywords

[No Author keywords available]

Indexed keywords

APPROXIMATION THEORY; GENETIC ALGORITHMS; HEURISTIC METHODS; SCHEDULING;

EID: 0037494853     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (20)
  • 2
    • 0026126118 scopus 로고
    • A computational study of the job-shop scheduling problem
    • Spring
    • D. Applegate and W. Cook, "A computational study of the job-shop scheduling problem," ORSA Journal on Computing, vol. 3, no. 2, pp.149-156, Spring, 1991.
    • (1991) ORSA Journal on Computing , vol.3 , Issue.2 , pp. 149-156
    • Applegate, D.1    Cook, W.2
  • 6
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • J. Blackstone, D. Phillips, and G. Hogg, "A state-of-the-art survey of dispatching rules for manufacturing job shop operations," International Journal of Production Research, vol. 20, pp. 26-45, 1982.
    • (1982) International Journal of Production Research , vol.20 , pp. 26-45
    • Blackstone, J.1    Phillips, D.2    Hogg, G.3
  • 7
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms: Part I. Representation
    • R. Cheng, M. Gen, and Y. Tsujimura, "A tutorial survey of job-shop scheduling problems using genetic algorithms: part I. Representation," International Journal of Computers and Industrial Engineering, vol. 30, no. 4, pp. 983-997, 1996.
    • (1996) International Journal of Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 983-997
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 11
    • 0031268178 scopus 로고    scopus 로고
    • Jobshop scheduling with imprecise durations: A fuzzy approach
    • Nov.
    • P. Fortemps, "Jobshop scheduling with imprecise durations: a fuzzy approach," IEEE Transactions on Fuzzy Systems, vol. 5, no. 4, pp. 557-569, Nov. 1997.
    • (1997) IEEE Transactions on Fuzzy Systems , vol.5 , Issue.4 , pp. 557-569
    • Fortemps, P.1
  • 15
    • 0000996580 scopus 로고
    • Two scheduling problems with fuzzy due dates
    • H. Ishii, M. Tada, and T. Masuda, "Two scheduling problems with fuzzy due dates," Fuzzy Sets and Systems, vol. 46, pp. 339-347, 1992.
    • (1992) Fuzzy Sets and Systems , vol.46 , pp. 339-347
    • Ishii, H.1    Tada, M.2    Masuda, T.3
  • 16
    • 0028523480 scopus 로고
    • Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems
    • H. Ishibuchi, N. Yamamoto, T. Murata, and H. Tanaka, "Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems," Fuzzy Sets and Systems, vol. 67, pp. 81-100, 1994.
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 81-100
    • Ishibuchi, H.1    Yamamoto, N.2    Murata, T.3    Tanaka, H.4
  • 17
    • 0003557963 scopus 로고
    • Research issues and challenges in fuzzy scheduling
    • Christian Doppler Laboratory for Expert Systems, Technical University of Vienna, Austria
    • R. M. Kerr and W. Slany, "Research issues and challenges in fuzzy scheduling" CD-Technical Report 94/68, Christian Doppler Laboratory for Expert Systems, Technical University of Vienna, Austria, 1994.
    • (1994) CD-Technical Report , vol.94 , Issue.68
    • Kerr, R.M.1    Slany, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.