메뉴 건너뛰기




Volumn 84, Issue 2, 2003, Pages 193-204

A management design approach to assembly line systems

Author keywords

2 stage design method; Assembly line systems; Management game; Market production leader; Strategic line balancing

Indexed keywords

ASSEMBLY MACHINES; INDUSTRIAL MANAGEMENT; MACHINE DESIGN; OPTIMIZATION; STRATEGIC PLANNING;

EID: 0037432981     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(02)00413-9     Document Type: Article
Times cited : (30)

References (16)
  • 1
    • 0032119557 scopus 로고    scopus 로고
    • Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases
    • Feyzbakhsh S.A., Matsui M., Itai K. Optimal design of a generalized conveyor-serviced production station. fixed and removal item cases International Journal of Production Economics. 55:1998;177-189.
    • (1998) International Journal of Production Economics , vol.55 , pp. 177-189
    • Feyzbakhsh, S.A.1    Matsui, M.2    Itai, K.3
  • 2
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly line systems
    • Ghosh S., Gagnon R.J. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly line systems. International Journal of Production Research. 27(4):1989;637-670.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 3
    • 0032761669 scopus 로고    scopus 로고
    • A new line remedial policy for the paced lines with stochastic task times
    • Gökçen H., Baykoç F. A new line remedial policy for the paced lines with stochastic task times. International Journal of Production Economics. 58:1999;191-197.
    • (1999) International Journal of Production Economics , vol.58 , pp. 191-197
    • Gökçen, H.1    Baykoç, F.2
  • 6
    • 0001884814 scopus 로고
    • A generalized model of conveyor-serviced production station (CSPS)
    • in Japanese
    • Matsui M. A generalized model of conveyor-serviced production station (CSPS). Journal of Japan Industrial Management Association. 44(1):1993;25-32. (in Japanese).
    • (1993) Journal of Japan Industrial Management Association , vol.44 , Issue.1 , pp. 25-32
    • Matsui, M.1
  • 7
    • 0000418508 scopus 로고    scopus 로고
    • A management game model: Economic traffic, leadtime and pricing setting
    • 1999
    • Matsui, M., 2002. A management game model: economic traffic, leadtime and pricing setting. Proceedings of the ICPR'99, Ireland, 1, 1999, pp. 873-876; Journal of Japan Industrial Management Association 53 (1), 1-9.
    • (2002) Proceedings of the ICPR'99, Ireland , vol.1 , pp. 873-876
    • Matsui, M.1
  • 8
    • 0345503022 scopus 로고    scopus 로고
    • Matsui, M., 2002. A management game model: economic traffic, leadtime and pricing setting. Proceedings of the ICPR'99, Ireland, 1, 1999, pp. 873-876; Journal of Japan Industrial Management Association 53 (1), 1-9.
    • Journal of Japan Industrial Management Association , vol.53 , Issue.1 , pp. 1-9
  • 10
    • 0013156989 scopus 로고
    • A study of the dynamic characteristic of an assembly system
    • (in Japanese)
    • Muramatsu R., Kasugai H., Kuroda M. A study of the dynamic characteristic of an assembly system. Industrial Engineering. 5(6):1963;539-548. (in Japanese).
    • (1963) Industrial Engineering , vol.5 , Issue.6 , pp. 539-548
    • Muramatsu, R.1    Kasugai, H.2    Kuroda, M.3
  • 12
    • 0013064892 scopus 로고    scopus 로고
    • A methodology for solving single-model, stochastic assembly line balancing problem
    • Sarin S.C., Erel E., Dar-El E.M. A methodology for solving single-model, stochastic assembly line balancing problem. Omega. 27:1999;525-535.
    • (1999) Omega , vol.27 , pp. 525-535
    • Sarin, S.C.1    Erel, E.2    Dar-El, E.M.3
  • 15
    • 85024733786 scopus 로고    scopus 로고
    • 2-stage design method for assembly line systems: A unified approach
    • Beijing, China, 1999
    • Yamada, T., Matsui, M., 2001b. 2-stage design method for assembly line systems: a unified approach. Final Program of IFORS'99, Beijing, China, 1999, 150; Journal of Japan Industrial Management Association 51 (6), 538-549 (in Japanese).
    • (2001) Final Program of IFORS'99 , pp. 150
    • Yamada, T.1    Matsui, M.2
  • 16
    • 0344209233 scopus 로고    scopus 로고
    • in Japanese
    • Yamada, T., Matsui, M., 2001b. 2-stage design method for assembly line systems: a unified approach. Final Program of IFORS'99, Beijing, China, 1999, 150; Journal of Japan Industrial Management Association 51 (6), 538-549 (in Japanese).
    • Journal of Japan Industrial Management Association , vol.51 , Issue.6 , pp. 538-549


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.