-
1
-
-
0023315788
-
A parallel heuristic algorithm for lot-sizing in multistage production systems
-
Afentakis P. A parallel heuristic algorithm for lot-sizing in multistage production systems. IIE Transaction. 19:1987;34-42.
-
(1987)
IIE Transaction
, vol.19
, pp. 34-42
-
-
Afentakis, P.1
-
2
-
-
0022672722
-
Optimal lot-sizing algorithms for complex product structures
-
Afentakis P., Gavish B. Optimal lot-sizing algorithms for complex product structures. Operations Research. 34:1986;237-249.
-
(1986)
Operations Research
, vol.34
, pp. 237-249
-
-
Afentakis, P.1
Gavish, B.2
-
3
-
-
0021376670
-
Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems
-
Afentakis P., Gavish B., Karmarkar U. Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems. Management Science. 30:1984;237-249.
-
(1984)
Management Science
, vol.30
, pp. 237-249
-
-
Afentakis, P.1
Gavish, B.2
Karmarkar, U.3
-
4
-
-
84985756865
-
Product structure complexity and multilevel lot sizing using alternative costing policies
-
Benton W.C., Srivastava R. Product structure complexity and multilevel lot sizing using alternative costing policies. Decision Sciences. 16:1985;357-369.
-
(1985)
Decision Sciences
, vol.16
, pp. 357-369
-
-
Benton, W.C.1
Srivastava, R.2
-
5
-
-
0020832935
-
Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
-
Billington P.J., McClain J.O., Thomas L.J. Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction. Management Science. 29:1983;1126-1141.
-
(1983)
Management Science
, vol.29
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.O.2
Thomas, L.J.3
-
6
-
-
0019913634
-
Improved heuristics for multi-stage requirements planning systems
-
Blackburn J.D., Millen R.A. Improved heuristics for multi-stage requirements planning systems. Management Science. 28:1982;44-56.
-
(1982)
Management Science
, vol.28
, pp. 44-56
-
-
Blackburn, J.D.1
Millen, R.A.2
-
10
-
-
84985807773
-
An improved heuristic for multilevel lot sizing in material requirements planning
-
Coleman B.J., McKnew M.A. An improved heuristic for multilevel lot sizing in material requirements planning. Decision Sciences. 22:1991;136-156.
-
(1991)
Decision Sciences
, vol.22
, pp. 136-156
-
-
Coleman, B.J.1
McKnew, M.A.2
-
11
-
-
84989454182
-
The measurement and operating benefits of component part commonality
-
Collier D.A. The measurement and operating benefits of component part commonality. Decision Sciences. 12:1981;85-96.
-
(1981)
Decision Sciences
, vol.12
, pp. 85-96
-
-
Collier, D.A.1
-
12
-
-
0001887652
-
Dynamic lot size models for multi-stage assembly systems
-
Crowston W.B., Wagner H.M. Dynamic lot size models for multi-stage assembly systems. Management Science. 20:1973;14-21.
-
(1973)
Management Science
, vol.20
, pp. 14-21
-
-
Crowston, W.B.1
Wagner, H.M.2
-
13
-
-
0034689120
-
Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm
-
Dellaert N.P., Jeunet J. Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm. International Journal of Production Research. 38:2000;1083-1099.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 1083-1099
-
-
Dellaert, N.P.1
Jeunet, J.2
-
14
-
-
0034501331
-
A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
-
Dellaert N.P., Jeunet J., Jonard N. A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs. International Journal of Production Economics. 68:2000;241-257.
-
(2000)
International Journal of Production Economics
, vol.68
, pp. 241-257
-
-
Dellaert, N.P.1
Jeunet, J.2
Jonard, N.3
-
15
-
-
0001343720
-
Extensions of the planning horizon theorem in the dynamic lot size model
-
Eppen G.D., Gould F.J., Pashigian B.P. Extensions of the planning horizon theorem in the dynamic lot size model. Management Science. 15:1969;268-277.
-
(1969)
Management Science
, vol.15
, pp. 268-277
-
-
Eppen, G.D.1
Gould, F.J.2
Pashigian, B.P.3
-
17
-
-
0003066666
-
Multi-stage lot-sizing for general production systems
-
S. Axsäter, C. Schneeweiss, & E. Silver. Lecture Notes in Economics and Mathematical Systems Berlin: Springer
-
Heinrich C.E., Schneeweiss C. Multi-stage lot-sizing for general production systems. Axsäter S., Schneeweiss C., Silver E. Multi-Stage Production Planning and Control, Lecture Notes in Economics and Mathematical Systems. 1986;150-181 Springer, Berlin.
-
(1986)
Multi-Stage Production Planning and Control
, pp. 150-181
-
-
Heinrich, C.E.1
Schneeweiss, C.2
-
18
-
-
0025701546
-
The multi-level lot sizing problem: Evaluation of a simulated annealing heuristic
-
Kuik R., Salomon M. The multi-level lot sizing problem: Evaluation of a simulated annealing heuristic. European Journal of Operational Research. 45:1990;25-37.
-
(1990)
European Journal of Operational Research
, vol.45
, pp. 25-37
-
-
Kuik, R.1
Salomon, M.2
-
20
-
-
0012591073
-
A comparative study of lot-sizing procedures for multi-stage assembly systems
-
Lambrecht M., Vander Eecken J., Vanderveken H. A comparative study of lot-sizing procedures for multi-stage assembly systems. OR-Spektrum. 5:1983;33-43.
-
(1983)
OR-Spektrum
, vol.5
, pp. 33-43
-
-
Lambrecht, M.1
Vander Eecken, J.2
Vanderveken, H.3
-
21
-
-
84985817972
-
An efficient zero-one formulation of the multilevel lot-sizing problem
-
McKnew M.A., Saydam C., Coleman B.J. An efficient zero-one formulation of the multilevel lot-sizing problem. Decision Sciences. 22:1991;280-295.
-
(1991)
Decision Sciences
, vol.22
, pp. 280-295
-
-
McKnew, M.A.1
Saydam, C.2
Coleman, B.J.3
-
22
-
-
0002657699
-
A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
-
Silver E.A., Meal H.C. A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management. 14:1973;64-74.
-
(1973)
Production and Inventory Management
, vol.14
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.C.2
-
23
-
-
0019247722
-
Optimal multi-level lot sizing for requirements planning systems
-
Steinberg E., Napier H.A. Optimal multi-level lot sizing for requirements planning systems. Management Science. 26:1980;1258-1271.
-
(1980)
Management Science
, vol.26
, pp. 1258-1271
-
-
Steinberg, E.1
Napier, H.A.2
-
24
-
-
84990610701
-
Effects of product structure complexity on multi-level lot sizing
-
Sum C.C., Png D.O., Yang K.K. Effects of product structure complexity on multi-level lot sizing. Decision Sciences. 24:1993;1135-1155.
-
(1993)
Decision Sciences
, vol.24
, pp. 1135-1155
-
-
Sum, C.C.1
Png, D.O.2
Yang, K.K.3
-
25
-
-
0012489199
-
Mehrstufige mehrprodukt-losgrößen planung bei beschränkten ressourcen und genereller erzeugnisstruktur
-
Tempelmeier H., Derstroff M. Mehrstufige mehrprodukt-losgrößen planung bei beschränkten ressourcen und genereller erzeugnisstruktur. OR Spektrum. 15:1993;63-73.
-
(1993)
OR Spektrum
, vol.15
, pp. 63-73
-
-
Tempelmeier, H.1
Derstroff, M.2
-
26
-
-
0028769370
-
A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures
-
Tempelmeier H., Helber S. A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures. European Journal of Operational Research. 75:1994;296-311.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 296-311
-
-
Tempelmeier, H.1
Helber, S.2
-
27
-
-
0002661308
-
The performance of a simple incremental lot-sizing rule in a multilevel inventory environment
-
Veral E.A., LaForge R.L. The performance of a simple incremental lot-sizing rule in a multilevel inventory environment. Decision Sciences. 16:1985;57-72.
-
(1985)
Decision Sciences
, vol.16
, pp. 57-72
-
-
Veral, E.A.1
LaForge, R.L.2
-
28
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., Whitin T.M. Dynamic version of the economic lot size model. Management Science. 5:1958;89-96.
-
(1958)
Management Science
, vol.5
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
29
-
-
0000650791
-
Materials requirements lot sizing: A multi-level approach
-
Yelle L.E. Materials requirements lot sizing: A multi-level approach. International Journal of Production Research. 17:1979;223-232.
-
(1979)
International Journal of Production Research
, vol.17
, pp. 223-232
-
-
Yelle, L.E.1
-
30
-
-
0000631024
-
A backlogging model and a multi-echelon model of a dynamic economic lot size production system - A network approach
-
Zangwill W.I. A backlogging model and a multi-echelon model of a dynamic economic lot size production system. - a network approach Management Science. 15:1969;506-527.
-
(1969)
Management Science
, vol.15
, pp. 506-527
-
-
Zangwill, W.I.1
-
31
-
-
0032089532
-
Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems
-
Zhao X., JingXing X. Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems. Production Planning and Control. 9:1998;371-384.
-
(1998)
Production Planning and Control
, vol.9
, pp. 371-384
-
-
Zhao, X.1
JingXing, X.2
|