-
1
-
-
0003929236
-
-
American Association of State Highway and Transportation Officials (AASHTO), Washington, DC
-
American Association of State Highway and Transportation Officials (AASHTO), 1994. A policy on geometric design of highways and streets, Washington, DC.
-
(1994)
A Policy on Geometric Design of Highways and Streets
-
-
-
2
-
-
5544242327
-
-
Transportation Research Record, no. 1553 TRB, National Research Council, Washington, DC
-
Coleman III, F., Moon, Y.J., 1997. Design of gate delay and gate interval time for four-quadrant gate system at railroad-highway grade crossings. Transportation Research Record, no. 1553, TRB, National Research Council, Washington, DC, pp. 124-131.
-
(1997)
Design of Gate Delay and Gate Interval Time for Four-quadrant Gate System at Railroad-highway Grade Crossings
, pp. 124-131
-
-
Coleman F., III.1
Moon, Y.J.2
-
3
-
-
0032158002
-
-
Transportation Research Record, no. 1648, TRB, National Research Council, Washington, DC
-
Coleman III, F., Moon, Y.J., 1998. Validation of a four quadrant gate simulation model-predicted vs. actual gate operating values. Transportation Research Record, no. 1648, TRB, National Research Council, Washington, DC, pp. 43-50.
-
(1998)
Validation of a Four Quadrant Gate Simulation Model-predicted Vs. Actual Gate Operating Values
, pp. 43-50
-
-
Coleman F., III.1
Moon, Y.J.2
-
4
-
-
0012743955
-
Driver judgement and error during the amber period at traffic lights
-
Crawford, A., 1962. Driver judgement and error during the amber period at traffic lights. Ergonomics 5, 298-304.
-
(1962)
Ergonomics
, vol.5
, pp. 298-304
-
-
Crawford, A.1
-
5
-
-
0001554997
-
The problem of the amber signal light in traffic flow
-
Gazis, D., Herman, R., Maradudin, A., 1960. The problem of the amber signal light in traffic flow. Operations Research 8, 112-132.
-
(1960)
Operations Research
, vol.8
, pp. 112-132
-
-
Gazis, D.1
Herman, R.2
Maradudin, A.3
-
6
-
-
0001543786
-
Problem of the amber signal light
-
Herman, R., 1963. Problem of the amber signal light. Traffic Engineering and Control 5, 298-304.
-
(1963)
Traffic Engineering and Control
, vol.5
, pp. 298-304
-
-
Herman, R.1
-
8
-
-
0011889473
-
-
ITE Technical Committee 4A-16, Institute of Transportation Engineers (ITE) Journal
-
ITE Technical Committee 4A-16, 1985. Determining Vehicle Change Intervals. Institute of Transportation Engineers (ITE) Journal, 61-64.
-
(1985)
Determining Vehicle Change Intervals
, pp. 61-64
-
-
-
9
-
-
0004063211
-
-
Prentice-Hall, Englewood Cliffs, New Jersey
-
May, A.D., 1990. Traffic Flow Fundamentals. Prentice-Hall, Englewood Cliffs, New Jersey.
-
(1990)
Traffic Flow Fundamentals
-
-
May, A.D.1
-
10
-
-
0012663919
-
-
Highway Research Board, Special Report 79, HRB, Washington, DC
-
Montroll, E.W., Potts, R.B., 1964. Car following and acceleration noise. An introduction to traffic flow theory. Highway Research Board, Special Report 79, HRB, Washington, DC, pp. 37-48.
-
(1964)
Car Following and Acceleration Noise. An Introduction to Traffic Flow Theory
, pp. 37-48
-
-
Montroll, E.W.1
Potts, R.B.2
-
11
-
-
0015331189
-
Deceleration levels and clearance times associated with the amber phase of traffic signals
-
Olson, P.L., Rothery, R.W., 1972. Deceleration levels and clearance times associated with the amber phase of traffic signals. Traffic Engineering 42, 16-19.
-
(1972)
Traffic Engineering
, vol.42
, pp. 16-19
-
-
Olson, P.L.1
Rothery, R.W.2
-
12
-
-
0019527642
-
A model of driver behavior at high-speed signalized intersections
-
Sheffi, Y., Mahmassani, H., 1981. A model of driver behavior at high-speed signalized intersections. Transportation Science 15, 50-61.
-
(1981)
Transportation Science
, vol.15
, pp. 50-61
-
-
Sheffi, Y.1
Mahmassani, H.2
|