메뉴 건너뛰기




Volumn 29, Issue 2, 2003, Pages 289-301

Selecting operating points for discrete-time gain scheduling

Author keywords

Discrete time control; Gain scheduling; Interval mathematics

Indexed keywords

ALGORITHMS; DISCRETE TIME CONTROL SYSTEMS; GAIN CONTROL; SCHEDULING; SYSTEMS ANALYSIS;

EID: 0037332866     PISSN: 00457906     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0045-7906(01)00031-3     Document Type: Article
Times cited : (15)

References (14)
  • 1
    • 84945538559 scopus 로고    scopus 로고
    • Control system design for LTI systems using interval analysis
    • Honolulu, HI, March
    • Fadali M.S., Bebis G. Control system design for LTI systems using interval analysis. Proc ISCA Conf Comput Appl, Honolulu, HI, March 1998.
    • (1998) Proc ISCA Conf Comput Appl
    • Fadali, M.S.1    Bebis, G.2
  • 2
    • 0034546605 scopus 로고    scopus 로고
    • Controller design for slowly varying interval plants using gain scheduling and interval mathematics
    • Chicago, IL, June
    • Fadali M.S., McNichols K.H. Controller design for slowly varying interval plants using gain scheduling and interval mathematics. Proc 2000 Am Control Conf, Chicago, IL, June 2000.
    • (2000) Proc 2000 Am Control Conf
    • Fadali, M.S.1    McNichols, K.H.2
  • 3
    • 0004293209 scopus 로고
    • Englewood Cliffs, NJ: Prentice Hall
    • Moore R.E. Interval analysis. 1966;Prentice Hall, Englewood Cliffs, NJ.
    • (1966) Interval analysis
    • Moore, R.E.1
  • 10
    • 0025792465 scopus 로고
    • Analytical framework for gain scheduling
    • January
    • Rugh W.J. Analytical framework for gain scheduling. IEEE Control Systems Magazine, January 1991. p. 79-84.
    • (1991) IEEE Control Systems Magazine , pp. 79-84
    • Rugh, W.J.1
  • 11
    • 0029264286 scopus 로고
    • Gain scheduling dynamic linear controllers of a nonlinear plant
    • Lawrence D.A., Rugh W.J. Gain scheduling dynamic linear controllers of a nonlinear plant. Automatica 1995;31(3):381-90.
    • (1995) Automatica , vol.31 , Issue.3 , pp. 381-390
    • Lawrence, D.A.1    Rugh, W.J.2
  • 12
    • 0026883988 scopus 로고
    • Gain scheduling: Potential hazards and possible remedies
    • June
    • Shamma J.S., Athans M. Gain scheduling: potential hazards and possible remedies. IEEE Control Systems Magaze, June 1992, p. 101-7.
    • (1992) IEEE Control Systems Magaze , pp. 101-107
    • Shamma, J.S.1    Athans, M.2
  • 14


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.