메뉴 건너뛰기




Volumn 19, Issue 1, 2003, Pages 103-116

Stabilization of multi-inventory systems with uncertain demand and setups

Author keywords

Manufacturing; Multi inventory; Production; Setup; Uncertain demand

Indexed keywords

CONSTRAINT THEORY; LINEAR PROGRAMMING; MATHEMATICAL MODELS; SET THEORY; STRATEGIC PLANNING; SYSTEM STABILITY; THEOREM PROVING; UNCERTAIN SYSTEMS;

EID: 0037325998     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/TRA.2002.807553     Document Type: Article
Times cited : (6)

References (29)
  • 1
    • 0022667867 scopus 로고
    • Optimal control of production rate in a failure-prone manufacturing system
    • Feb.
    • R. Akella and P. R. Kumar, "Optimal control of production rate in a failure-prone manufacturing system," IEEE Trans. Automat. Contr., vol., AC-31, pp. 116-126, Feb. 1986.
    • (1986) IEEE Trans. Automat. Contr. , vol.AC-31 , pp. 116-126
    • Akella, R.1    Kumar, P.R.2
  • 3
    • 0031513857 scopus 로고    scopus 로고
    • A network design problem for a distribution system with uncertain demands
    • F. Blanchini, F. Rinaldi, and W. Ukovich, "A network design problem for a distribution system with uncertain demands," SIAM J. Optim., vol. 7, no. 2, pp. 560-578, 1997.
    • (1997) SIAM J. Optim. , vol.7 , Issue.2 , pp. 560-578
    • Blanchini, F.1    Rinaldi, F.2    Ukovich, W.3
  • 4
    • 0031257451 scopus 로고    scopus 로고
    • Least inventory control of multistorage systems with non-stochastic unknown input
    • Oct.
    • ____, "Least inventory control of multistorage systems with non-stochastic unknown input," IEEE Trans. Robot. Automat., vol. 13, pp. 633-645, Oct. 1997.
    • (1997) IEEE Trans. Robot. Automat. , vol.13 , pp. 633-645
    • Blanchini, F.1    Rinaldi, F.2    Ukovich, W.3
  • 5
    • 0034195799 scopus 로고    scopus 로고
    • Control of production-distribution systems with unknown inputs and system failures
    • June
    • F. Blanchini, S. Miani, and W. Ukovich, "Control of production-distribution systems with unknown inputs and system failures," IEEE Trans. Automat. Contr., vol. 45, pp. 1072-1081, June 2000.
    • (2000) IEEE Trans. Automat. Contr. , vol.45 , pp. 1072-1081
    • Blanchini, F.1    Miani, S.2    Ukovich, W.3
  • 6
    • 0034206602 scopus 로고    scopus 로고
    • Feedback control of production-distribution systems with unknown demand and delays
    • June; Special Issue on Automation of Manufacturing Systems
    • F. Blanchini, R. Pesenti, F. Rinaldi, and W. Ukovich, "Feedback control of production-distribution systems with unknown demand and delays," IEEE Trans. Robot. Automat., vol. 16, pp. 313-317, June 2000. Special Issue on Automation of Manufacturing Systems.
    • (2000) IEEE Trans. Robot. Automat. , vol.16 , pp. 313-317
    • Blanchini, F.1    Pesenti, R.2    Rinaldi, F.3    Ukovich, W.4
  • 7
    • 0035363245 scopus 로고    scopus 로고
    • Min-max control of uncertain multi-inventory systems with multiplicative uncertainties
    • June
    • F. Blanchini and R. Presenti, "Min-max control of uncertain multi-inventory systems with multiplicative uncertainties," IEEE Trans. Automat. Contr., vol. 46, pp. 955-960, June 2001.
    • (2001) IEEE Trans. Automat. Contr. , vol.46 , pp. 955-960
    • Blanchini, F.1    Presenti, R.2
  • 8
    • 21844522926 scopus 로고
    • Minimax production planning in failure-prone manufacturing systems
    • E. K. Boukas, H. Yang, and Q. Zhang, "Minimax production planning in failure-prone manufacturing systems," J. Optim. Theory Appl., vol. 82, no. 2, pp. 269-286, 1995.
    • (1995) J. Optim. Theory Appl. , vol.82 , Issue.2 , pp. 269-286
    • Boukas, E.K.1    Yang, H.2    Zhang, Q.3
  • 9
    • 0026851109 scopus 로고
    • On real-time policies for flexible manufacturing systems
    • Apr.
    • C. Chase and P. J. Ramadge, "On real-time policies for flexible manufacturing systems," IEEE Trans. Automat. Contr., vol. 37, pp. 491-496, Apr. 1992.
    • (1992) IEEE Trans. Automat. Contr. , vol.37 , pp. 491-496
    • Chase, C.1    Ramadge, P.J.2
  • 10
    • 0026105148 scopus 로고
    • Analysis of real-time multiproduct lot scheduling
    • Feb.
    • S. Lou, S. Sethi, and G. Sorger, "Analysis of real-time multiproduct lot scheduling," IEEE Trans. Automat. Contr., vol. 36, pp. 243-248, Feb. 1991.
    • (1991) IEEE Trans. Automat. Contr. , vol.36 , pp. 243-248
    • Lou, S.1    Sethi, S.2    Sorger, G.3
  • 11
    • 0024731651 scopus 로고
    • Control and optimization methods in communication network problems
    • Sept.
    • A. Ephremides and S. Verdú, "Control and optimization methods in communication network problems," IEEE Trans. Automat. Contr., vol. 34, pp. 930-942, Sept. 1989.
    • (1989) IEEE Trans. Automat. Contr. , vol.34 , pp. 930-942
    • Ephremides, A.1    Verdú, S.2
  • 13
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • J. Kimemia and S. B. Greshwin, "An algorithm for the computer control of a flexible manufacturing system," IIE Trans., vol. 15, pp. 353-362, 1983.
    • (1983) IIE Trans. , vol.15 , pp. 353-362
    • Kimemia, J.1    Greshwin, S.B.2
  • 16
    • 0029250558 scopus 로고
    • Stability of queueing networks and scheduling policies
    • Feb.
    • P. R. Kumar, and S. P. Meyn, "Stability of queueing networks and scheduling policies," IEEE Trans. Automat. Contr., vol. 40, pp. 251-260, Feb. 1995.
    • (1995) IEEE Trans. Automat. Contr. , vol.40 , pp. 251-260
    • Kumar, P.R.1    Meyn, S.P.2
  • 17
    • 0029732538 scopus 로고    scopus 로고
    • Duality and linear programs for stability and performance analysis of queuing networks and scheduling policies
    • Jan.
    • ____, "Duality and linear programs for stability and performance analysis of queuing networks and scheduling policies," IEEE Trans. Automat. Contr., vol. 41, pp. 4-17, Jan. 1996.
    • (1996) IEEE Trans. Automat. Contr. , vol.41 , pp. 4-17
    • Kumar, P.R.1    Meyn, S.P.2
  • 18
    • 0025401166 scopus 로고
    • Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems
    • Mar.
    • P. R. Kumar and T. I. Seidman, "Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems," IEEE Trans. Automat. Contr., vol. 35, pp. 289-298, Mar. 1990.
    • (1990) IEEE Trans. Automat. Contr. , vol.35 , pp. 289-298
    • Kumar, P.R.1    Seidman, T.I.2
  • 19
    • 0014438069 scopus 로고
    • Applications of dynamic programming to the control of water resource systems
    • R. E. Larson and W. G. Keckler, "Applications of dynamic programming to the control of water resource systems," Automatica, no. 5, pp. 15-26, 1969.
    • (1969) Automatica , Issue.5 , pp. 15-26
    • Larson, R.E.1    Keckler, W.G.2
  • 20
    • 0030213086 scopus 로고    scopus 로고
    • Submodular containment is hard, even for networks
    • S. T. McCormick, "Submodular containment is hard, even for networks," Oper. Res. Lett., vol. 19, pp. 95-99, 1996.
    • (1996) Oper. Res. Lett. , vol.19 , pp. 95-99
    • McCormick, S.T.1
  • 21
    • 0029306944 scopus 로고
    • A linear programming approach to large-scale linear optimal control problems
    • May
    • J. C. Moreno and M. Papageorgiou, "A linear programming approach to large-scale linear optimal control problems," IEEE Trans. Automat. Contr., vol. 40, pp. 971-977, May 1995.
    • (1995) IEEE Trans. Automat. Contr. , vol.40 , pp. 971-977
    • Moreno, J.C.1    Papageorgiou, M.2
  • 22
    • 0020116139 scopus 로고
    • An optimal control approach to dynamic routing in networks
    • Apr.
    • F. H. Moss and A. Segall, "An optimal control approach to dynamic routing in networks," IEEE Trans. Automat. Contr., vol. AC-27, pp. 329-339, Apr. 1982.
    • (1982) IEEE Trans. Automat. Contr. , vol.AC-27 , pp. 329-339
    • Moss, F.H.1    Segall, A.2
  • 23
    • 0033353544 scopus 로고    scopus 로고
    • Lead time modeling and acceleration of product design and development
    • Oct.
    • Y. Narahari, N. Viswanadham, and V. K. Kumar, "Lead time modeling and acceleration of product design and development," IEEE Trans. Robot. Automat., vol. 15, pp. 882-896, Oct. 1999.
    • (1999) IEEE Trans. Robot. Automat. , vol.15 , pp. 882-896
    • Narahari, Y.1    Viswanadham, N.2    Kumar, V.K.3
  • 24
    • 0029378614 scopus 로고
    • Optimal feedback production planning in a stochastic N-machine flowshop
    • E. Presman, S. P. Sethi, and Q. Zhang, "Optimal feedback production planning in a stochastic N-machine flowshop," Automatica, vol. 31, pp. 1325-1332, 1995.
    • (1995) Automatica , vol.31 , pp. 1325-1332
    • Presman, E.1    Sethi, S.P.2    Zhang, Q.3
  • 25
    • 0024611210 scopus 로고
    • Stable, distributed, real-time scheduling of flexible manufacturing/assembly/disassembly systems
    • Feb.
    • J. R. Perkins, and P. R. Kumar, "Stable, distributed, real-time scheduling of flexible manufacturing/assembly/disassembly systems," IEEE Trans. Automat. Contr., vol. 34, pp. 139-148, Feb. 1989.
    • (1989) IEEE Trans. Automat. Contr. , vol.34 , pp. 139-148
    • Perkins, J.R.1    Kumar, P.R.2
  • 26
    • 0031100305 scopus 로고    scopus 로고
    • Scheduling multiple part types in an unreliable single-machine manufacturing systems
    • Mar.
    • J. R. Prekins and R. Srikant, "Scheduling multiple part types in an unreliable single-machine manufacturing systems," IEEE Trans. Automat. Contr., vol. 42, pp. 364-377, Mar. 1997.
    • (1997) IEEE Trans. Automat. Contr. , vol.42 , pp. 364-377
    • Prekins, J.R.1    Srikant, R.2
  • 28
    • 0024048635 scopus 로고
    • Production control of manufacturing systems with multiple machine state
    • July
    • A. Sharifna, "Production control of manufacturing systems with multiple machine state," IEEE Trans. Automat. Contr., vol. AC-33, pp. 620-625, July 1988.
    • (1988) IEEE Trans. Automat. Contr. , vol.AC-33 , pp. 620-625
    • Sharifna, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.