메뉴 건너뛰기




Volumn , Issue 120 II, 2003, Pages 1605-1616

Injection of a ventilation tower of an underwater road tunnel using cement and chemical grouts

Author keywords

[No Author keywords available]

Indexed keywords

CEMENTS; CONCRETES; GROUNDWATER; LEAKAGE (FLUID); VEHICULAR TUNNELS; VENTILATION;

EID: 0037272264     PISSN: 08950563     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/40663(2003)96     Document Type: Conference Paper
Times cited : (2)

References (6)
  • 1
    • 0004192419 scopus 로고
    • Construction and design of cement grouting, A guide to grouting in rock foundations
    • Wiley series of practical construction guides, John Wiley and Sons, inc.
    • Houlsby, A.C. (1990). Construction and design of cement grouting, A guide to grouting in rock foundations. Wiley series of practical construction guides, John Wiley and Sons, inc.
    • (1990)
    • Houlsby, A.C.1
  • 2
    • 4243750094 scopus 로고    scopus 로고
    • Instrumentation de la tour de ventilation nord, direction nord, rapport d'installation
    • Laboratoire de mécanique des roches et de géologie appliquée (LMRGA), Univ. de Sherbrooke, Report GR-97-03-01
    • Palardy, D. and Ballivy, G. (1997a). Instrumentation de la tour de ventilation nord, direction nord, rapport d'installation. Laboratoire de mécanique des roches et de géologie appliquée (LMRGA), Univ. de Sherbrooke, Report GR-97-03-01.
    • (1997)
    • Palardy, D.1    Ballivy, G.2
  • 3
    • 0013290246 scopus 로고    scopus 로고
    • Devis technique - Travaux d'injection au coulis de ciment et au coulis chimique au pont-tunnel L.-H.-Lafontaine
    • LMRGA, Univ. de Sherbrooke, Report GR-97-11-02
    • Palardy, D. and Ballivy, G. (1997b). Devis technique - Travaux d'injection au coulis de ciment et au coulis chimique au pont-tunnel L.-H.-Lafontaine. LMRGA, Univ. de Sherbrooke, Report GR-97-11-02.
    • (1997)
    • Palardy, D.1    Ballivy, G.2
  • 4
    • 0013241129 scopus 로고    scopus 로고
    • Instrumentation de la tour de ventilation nord, direction nord, Rapport final du suivi - Année 1997
    • LMRGA, Univ. de Sherbrooke, Report GR-98-02-01
    • Palardy, D. and Ballivy, G. (1998). Instrumentation de la tour de ventilation nord, direction nord, Rapport final du suivi - Année 1997. LMRGA, Univ. de Sherbrooke, Report GR-98-02-01.
    • (1998)
    • Palardy, D.1    Ballivy, G.2
  • 5
    • 0013290246 scopus 로고    scopus 로고
    • Suivi des travaux d'injection au coulis de ciment et au coulis chimique, pont-tunnel L.-H.-Lafontaine
    • LMRGA, Univ. de Sherbrooke, Report GR-98-03-02
    • Palardy, D., Ballivy, C., Vrignaud, J.-P. and Ballivy, G. (1998). Suivi des travaux d'injection au coulis de ciment et au coulis chimique, pont-tunnel L.-H.-Lafontaine, LMRGA, Univ. de Sherbrooke, Report GR-98-03-02.
    • (1998)
    • Palardy, D.1    Ballivy, C.2    Vrignaud, J.-P.3    Ballivy, G.4
  • 6
    • 0013178219 scopus 로고    scopus 로고
    • Suivi des travaux d'injection au printemps 1999 aux tunnels Georges-Vanier, Ville-Marie et L.-H.-Lafontaine et recommandations pour les interventions futures
    • LMRGA, Univ. de Sherbrooke, Report GR-99-07-01
    • Vrignaud, J.-P., Palardy, D. and Ballivy, G. (1999). Suivi des travaux d'injection au printemps 1999 aux tunnels Georges-Vanier, Ville-Marie et L.-H.-Lafontaine et recommandations pour les interventions futures, LMRGA, Univ. de Sherbrooke, Report GR-99-07-01.
    • (1999)
    • Vrignaud, J.-P.1    Palardy, D.2    Ballivy, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.