메뉴 건너뛰기




Volumn 18, Issue 1, 2003, Pages 107-112

Thermal overload tests on a 400-MVA power transformer with a special 2.5-p.u. Short time loading capability

Author keywords

Eddy losses; Leakage flux; Overloading; Power transformer; Winding hot spot

Indexed keywords

EDDY CURRENTS; ELECTRIC LOSSES; ELECTRIC WINDINGS; FUNCTIONS; LEAKAGE CURRENTS; THERMAL LOAD;

EID: 0037250663     PISSN: 08858977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRD.2002.807747     Document Type: Article
Times cited : (38)

References (7)
  • 1
    • 84960324240 scopus 로고
    • Loading guide for oil-immersed power transformers
    • Loading Guide for Oil-Immersed Power Transformers, IEC 354, 1991.
    • (1991) IEC , vol.354
  • 3
    • 0012885153 scopus 로고
    • A survey of facts and opinions on the maximum safe operating temperature of power transformers under emergency conditions
    • "A survey of facts and opinions on the maximum safe operating temperature of power transformers under emergency conditions," Electra, CIGRÉ WG 12-09, vol. 129, 1990.
    • (1990) Electra, CIGRÉ WG 12-09 , pp. 129
  • 4
    • 0012848351 scopus 로고
    • Direct measurement of the hot-spot temperature of transformers
    • "Direct measurement of the hot-spot temperature of transformers," Electra, CIGRÉ WG 12-09, vol. 129, 1990.
    • (1990) Electra, CIGRÉ WG 12-09 , vol.129
  • 5
    • 0026896363 scopus 로고
    • An investigation of the thermal performance of an oil-filled transformer winding
    • July
    • L. W. Pierce, "An investigation of the thermal performance of an oil-filled transformer winding," IEEE Trans. Power Delivery., vol. 7, pp. 1347-1358, July 1992.
    • (1992) IEEE Trans. Power Delivery. , vol.7 , pp. 1347-1358
    • Pierce, L.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.