메뉴 건너뛰기




Volumn 3, Issue 1-2, 2003, Pages 43-50

Multi-criteria decision support for annual rehabilitation programmes in drinking water networks

Author keywords

Decision criteria; Decision methods; Management; Rehabilitation; Water networks

Indexed keywords

COSTS; POTABLE WATER; RISK ASSESSMENT;

EID: 0037242821     PISSN: 16069749     EISSN: None     Source Type: Journal    
DOI: 10.2166/ws.2003.0084     Document Type: Conference Paper
Times cited : (13)

References (10)
  • 1
    • 0036382509 scopus 로고    scopus 로고
    • Selecting and scheduling infrastructure network rehabilitation projects
    • Baur, R. and Kropp, I. (2002). Selecting and scheduling infrastructure network rehabilitation projects. Wat. Sci. Tech: Water Supply, 2(4), 43-50.
    • (2002) Wat. Sci. Tech: Water Supply , vol.2 , Issue.4 , pp. 43-50
    • Baur, R.1    Kropp, I.2
  • 9
    • 0020098396 scopus 로고
    • Economic analysis of water main breaks
    • Walski, T. and Peliccia, A. (1982). Economic analysis of water main breaks. Journal AWWA, 74(3), pp. 140-147.
    • (1982) Journal AWWA , vol.74 , Issue.3 , pp. 140-147
    • Walski, T.1    Peliccia, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.