메뉴 건너뛰기




Volumn 26, Issue 22, 2002, Pages 31-33+44

Reliability evaluation of bulk power system using artificial neural network for load shedding

Author keywords

Artificial neural network; Bulk power system; Load shedding; Reliability assessment

Indexed keywords

BACKPROPAGATION; DATA PROCESSING; ELECTRIC LOAD SHEDDING; NEURAL NETWORKS; RELIABILITY;

EID: 0037176113     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (7)
  • 1
    • 0022246040 scopus 로고
    • A comparison between two fundamentally different approaches to composite system reliability evaluation
    • Salvaderi L, Billinton R. A Comparison Between Two Fundamentally Different Approaches to Composite System Reliability Evaluation. IEEE Trans on Power Apparatus and Systems, 1985, 104 (12): 3486-3491
    • (1985) IEEE Trans. on Power Apparatus and Systems , vol.104 , Issue.12 , pp. 3486-3491
    • Salvaderi, L.1    Billinton, R.2
  • 3
    • 4243799168 scopus 로고    scopus 로고
    • Power system static security and reliability analysis system
    • Electric Power System Research Institute of Chongqing University, Power Test Institute in Sichuan Province
    • Zhou Jiaqi, Chen Baoxi. Power System Static Security and Reliability Analysis System. Electric Power System Research Institute of Chongqing University, Power Test Institute in Sichuan Province, 1999.
    • (1999)
    • Zhou, J.1    Chen, B.2
  • 4
    • 0013149878 scopus 로고
    • Beijing: Hydraulic Power Publishing Press
    • Yasuji Sekine. Power System Load Flow. Beijing: Hydraulic Power Publishing press, 1974. 43-67.
    • (1974) Power System Load Flow , pp. 43-67
    • Sekine, Y.1
  • 5
    • 0002455236 scopus 로고
    • Non-linear time series modeling and forecasting using the neural network approach
    • Lei Ming, Wu Ya, Yang Shuzi. Non-linear Time Series Modeling and Forecasting Using the Neural Network Approach. Journal of Huazhong University of Science and Technology, 1993, 21 (1): 47-52
    • (1993) Journal of Huazhong University of Science and Technology , vol.21 , Issue.1 , pp. 47-52
    • Lei, M.1    Wu, Y.2    Yang, S.3
  • 6
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE RTS Task Force of APM Subcommittee
    • IEEE RTS Task Force of APM Subcommittee. IEEE Reliability Test System. IEEE Trans on Power Apparatus and Systems, 1979, 98 (6): 2047-2054
    • (1979) IEEE Trans. on Power Apparatus and Systems , vol.98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.