-
1
-
-
0001669310
-
Automating planning and scheduling of shuttle payload operations
-
Chien, S.; Rabideau, G.; Willis, J.; and Mann, T. Automating Planning and Scheduling of Shuttle Payload Operations. Artificial Intelligence 1(14): 239-255.
-
Artificial Intelligence
, vol.1
, Issue.14
, pp. 239-255
-
-
Chien, S.1
Rabideau, G.2
Willis, J.3
Mann, T.4
-
4
-
-
84942944881
-
Planning in interplanetary space: Theory and practice
-
Jonsson, A.; Morris, P.; Muscettola, N.; Rajan, K.; and Smith B. 2000. Planning in Interplanetary Space: Theory and Practice. Paper presented at the Fifth International Conference on Artificial Intelligence Planning Systems, 14-17 April, Breckenridge, Colorado.
-
(2000)
Fifth International Conference on Artificial Intelligence Planning Systems, 14-17 April, Breckenridge, Colorado
-
-
Jonsson, A.1
Morris, P.2
Muscettola, N.3
Rajan, K.4
Smith, B.5
-
6
-
-
0012597064
-
Queueing models of call centers: An introduction
-
Technical Report, 2001-7, Department of Statistics, Vrije Universiteit
-
Koole, G., and Mandelbaum, A. 2001. Queueing Models of Call Centers: An Introduction, Technical Report, 2001-7, Department of Statistics, Vrije Universiteit.
-
(2001)
-
-
Koole, G.1
Mandelbaum, A.2
-
7
-
-
0028476392
-
Agents that reduce work and information overload
-
Maes, P. 1994. Agents That Reduce Work and Information Overload. Communications of the ACM 3(7): 31-40, 146.
-
(1994)
Communications of the ACM
, vol.3
, Issue.7
, pp. 31-40
-
-
Maes, P.1
-
8
-
-
44049112032
-
Minimizing conflicts: A heuristic repair method for constraint-satisfaction and scheduling problems
-
Minton, S.; Johnston, M.; Philips, A.; and Laird, P. 1992. Minimizing Conflicts: A Heuristic Repair Method for Constraint-Satisfaction and Scheduling Problems. Artificial Intelligence 58(1-3): 161-205.
-
(1992)
Artificial Intelligence
, vol.58
, Issue.1-3
, pp. 161-205
-
-
Minton, S.1
Johnston, M.2
Philips, A.3
Laird, P.4
-
9
-
-
0012588470
-
Using iterative repair to automate planning and scheduling of shuttle payload operations
-
Rabideau, G.; Chien, S.; Willis, J.; and Mann, T. 1999. Using Iterative Repair to Automate Planning and Scheduling of Shuttle Payload Operations. Paper presented at the Eleventh Innovative Applications of Artificial Intelligence (IAAI), 18-22 July, Orlando, Florida.
-
(1999)
Eleventh Innovative Applications of Artificial Intelligence (IAAI), 18-22 July, Orlando, Florida
-
-
Rabideau, G.1
Chien, S.2
Willis, J.3
Mann, T.4
-
10
-
-
0003305989
-
Iterative repair planning for spacecraft operations in the ASPEN system
-
Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; and Govindjee, A 1999. Iterative Repair Planning for Spacecraft Operations in the ASPEN System. Paper presented at the International Symposium on Artificial Intelligence Robotics and Automation in Space, 1-3 June, Noordwijk, The Netherlands.
-
(1999)
International Symposium on Artificial Intelligence Robotics and Automation in Space, 1-3 June, Noordwijk, The Netherlands
-
-
Rabideau, G.1
Knight, R.2
Chien, S.3
Fukunaga, A.4
Govindjee, A.5
-
11
-
-
0002753338
-
OPIS: A methodology and architecture for reactive scheduling
-
eds. M. Fox and M. Zweben. San Franscisco, Calif.: Morgan Kaufmann
-
Smith, S. F. 1994. OPIS: A Methodology and Architecture for Reactive Scheduling. In Intelligent Scheduling, eds. M. Fox and M. Zweben. San Franscisco, Calif.: Morgan Kaufmann.
-
(1994)
Intelligent Scheduling
-
-
Smith, S.F.1
-
13
-
-
0001518161
-
On manpower scheduling algorithms
-
Tien, J. M., and Kamiyama, A. On Manpower Scheduling Algorithms. SIAM Review 24(3): 275-287.
-
SIAM Review
, vol.24
, Issue.3
, pp. 275-287
-
-
Tien, J.M.1
Kamiyama, A.2
|