메뉴 건너뛰기




Volumn 1, Issue , 2002, Pages 557-562

Why initial conditions are important

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; DATA TRANSFER; MATHEMATICAL MODELS; THROUGHPUT;

EID: 0036923529     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (7)
  • 1
    • 3543081615 scopus 로고    scopus 로고
    • Trade-off between maximizing throughput rate and minimizing system time in Kanban systems
    • Andijani A. 1997. Trade-off between maximizing throughput rate and minimizing system time in Kanban systems. Int J Ops. and Prod. Management 17 (5): 429-445.
    • (1997) Int J Ops. and Prod. Management , vol.17 , Issue.5 , pp. 429-445
    • Andijani, A.1
  • 3
    • 0012259650 scopus 로고    scopus 로고
    • Determining the optimum level of work in progress using constraint analysis and computer simulation
    • Gunn B. M. and Nahavandi S. 2000. Determining the optimum level of work in progress using constraint analysis and computer simulation. Assembly Automation 20 (4): 305-312.
    • (2000) Assembly Automation , vol.20 , Issue.4 , pp. 305-312
    • Gunn, B.M.1    Nahavandi, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.